|
||||||
M-423 Scheduling the Use of ETC and TOR Rights - DRAFTVersion 4.0 doc 515K Summary:MRTU Draft Operating Procedure M-423 Scheduling the Use of Existing Transmission Contract (ETC) and Transmission Ownership Rights (TOR) Rights, Version No. 4.0, Effective Date: TBD, Distribution Restriction: None Document Locations: |