|
||||||
SCE Per Unit Cost Guide - Finalxls 53K Summary:Southern California Edison (SCE) Per Unit Cost Guide - Final. Per unit costs will be used to estimate transmission network upgrade costs and interconnection facilities costs to interconnect a new Large Generating Facility to SCE's transmission system and the California ISO controlled grid. As additional per unit costs are determined over time, updates will be posted to this webpage. Document Locations: |