California ISO
   
Search

PG&E Per Unit Cost Guide - Final

xls 35K

Summary:


: Pacific Gas & Electric (PG&E) Per Unit Cost Guide - Final. Per unit costs will be used to estimate transmission network upgrade costs and interconnection facilities costs to interconnect a new Large Generating Facility to PG&E's transmission system and the California ISO controlled grid. As additional per unit costs are determined over time, updates will be posted to this webpage.


Document Locations:

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice