SDG&E Assumptions in SDG&E Per Unit Cost Guide

doc 26K

Summary:


San Diego Gas & Electric (SDG&E) Assumptions used in the SDG&E Per Unit Cost Guide - Final. Per unit costs will be used to estimate transmission network upgrade costs and interconnection facilities costs to interconnect a new Large Generating Facility to SDG&E's transmission system and the California ISO controlled grid. As additional per unit costs are determined over time, updates will be posted to this webpage.