Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALAMIT_7_UNIT 2 ALAMITOS GEN STA. UNIT 2 Forced 175.00 175.00 SoCal Gen Test
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Planned 150.00 0.00 SoCal Gen Test
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Forced 820.00 265.00 SoCal Gen Test
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned/Forced 13.40 0.30 SoCal Gen Test
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Forced 15.80 0.00 SoCal Gen Test
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00 SoCal Gen Test
BLKCRK_2_SOLAR1 McCoy Station Planned/Forced 250.00 238.60 SoCal Gen Test
CALGEN_1_UNITS COSO Finance Partners (Navy 1) Planned/Forced 92.20 0.00 SoCal Gen Test
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Forced 122.00 8.00 PGAE North
CATLNA_2_SOLAR2 Catalina Solar 2 Planned/Forced 18.00 0.00 SoCal Gen Test
CHICPK_7_UNIT 1 CHICAGO PARK 1, BEAR RIVER CA Forced 42.00 0.00 PGAE North
COLEMN_2_UNIT Coleman Planned 13.00 13.00 PGAE North
COLGAT_7_UNIT 1 COLGATE HYDRO UNIT 1 Planned 176.72 28.72 PGAE North
COLGAT_7_UNIT 2 COLGATE HYDRO UNIT 2 Planned/Forced 175.67 29.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 38.80 PGAE North
CONTRL_1_LUNDY LUNDY Planned 3.00 0.00 SoCal Gen Test
CONTRL_1_RUSHCK RUSH CREEK Planned 11.94 0.00 SoCal Gen Test
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned 250.00 250.00 SoCal Gen Test
DUTCH2_7_UNIT 1 DUTCH FLAT 2 PH Forced 26.00 0.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned/Forced 236.80 16.80 SoCal Gen Test
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 3.00 SoCal Gen Test
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 3.68 SoCal Gen Test
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Forced 2.56 2.36 SoCal Gen Test
ETIWND_7_UNIT 4 ETIWANDA GEN STA. UNIT 4 Forced 320.00 25.00 SoCal Gen Test
FMEADO_6_HELLHL FMEADO_6_HELLHL Forced 0.60 0.60 PGAE North
FMEADO_7_UNIT FRENCH MEADOWS HYDRO Forced 18.00 2.10 PGAE North
GOLETA_6_TAJIGS GOLETA_6_TAJIGS Planned 3.10 0.00 SoCal Gen Test
GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE Forced 49.50 49.50 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned/Forced 144.00 0.00 PGAE North
HATCR1_7_UNIT Hat Creek #1 Planned 8.50 0.00 PGAE North
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Planned 65.08 16.27 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Forced 933.10 393.10 SoCal Gen Test
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 0.00 SoCal Gen Test
LGHTHP_6_ICEGEN CARSON COGENERATION Forced 48.00 0.00 SoCal Gen Test
MNDALY_7_UNIT 3 MANDALAY GEN STA. UNIT 3 Forced 130.00 36.00 SoCal Gen Test
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SoCal Gen Test
MOORPK_7_UNITA1 WEME- Simi Valley Landfill Forced 2.49 0.00 SoCal Gen Test
MORBAY_7_UNIT 3 MORRO BAY UNIT 3 Forced 325.00 325.00 SoCal Gen Test
MORBAY_7_UNIT 4 MORRO BAY UNIT 4 Forced 325.00 325.00 SoCal Gen Test
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 0.00 SoCal Gen Test
MTWIND_1_UNIT 2 Mountain View Power Project II Planned 22.20 0.00 SoCal Gen Test
NAVYII_2_UNITS COSO POWER DEVELOPER (NAVY II) AGGREGATE Planned 99.00 0.00 SoCal Gen Test
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 6.20 SoCal Gen Test
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 4.41 SoCal Gen Test
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 5.21 SoCal Gen Test
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 28.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Forced 1.92 1.42 SoCal Gen Test
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Forced 210.00 129.00 SoCal Gen Test
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 5.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 5.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 1.70 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Planned 68.50 68.50 PGAE North
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 471.60 68.60 SoCal Gen Test
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Planned 57.00 57.00 PGAE North
RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 Planned 56.90 0.00 PGAE North
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 4.85 SoCal Gen Test
ROLLIN_6_UNIT ROLLINS HYDRO Forced 13.50 0.00 PGAE North
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Planned 46.00 46.00 PGAE North
SANTGO_6_COYOTE GAS RECOVERY SYS. (COYOTE CANYON) Forced 9.99 4.99 SoCal Gen Test
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 525.00 7.00 SoCal Gen Test
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 525.00 7.00 SoCal Gen Test
SBERDO_2_RTS011 SPVP011 Planned 3.50 0.00 SoCal Gen Test
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 5.45 SoCal Gen Test
SBERDO_6_MILLCK MILL CREEK PSP Planned/Forced 3.93 0.98 SoCal Gen Test
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 133.00 SoCal Gen Test
SLSTR1_2_SOLAR1 Solar Star 1 Planned/Forced 310.00 0.00 SoCal Gen Test
SLSTR2_2_SOLAR2 Solar Star 2 Planned/Forced 276.00 276.00 SoCal Gen Test
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 0.00 SoCal Gen Test
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 13.00 PGAE North
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Planned 6.50 6.50 PGAE North
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Forced 7.00 7.00 PGAE North
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SoCal Gen Test
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 10.46 SoCal Gen Test
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 10.05 SoCal Gen Test
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned 85.00 7.03 SoCal Gen Test
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 9.46 SoCal Gen Test
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.60 SoCal Gen Test
VALLEY_7_UNITA1 WM Energy, El Sobrante Landfill Planned 3.74 1.24 SoCal Gen Test
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 16.30 SoCal Gen Test
VICTOR_1_EXSLRB Expressway Solar B Planned 2.00 0.00 SoCal Gen Test
VICTOR_1_SOLAR3 Adelanto Solar 2 Planned 7.00 0.00 SoCal Gen Test
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 7.00 SoCal Gen Test
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SoCal Gen Test
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SoCal Gen Test
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SoCal Gen Test
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SoCal Gen Test
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SoCal Gen Test
WNDSTR_2_WIND Windstar Planned 120.00 0.00 SoCal Gen Test
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Planned/Forced 22.00 5.00
AGUCAL_5_SOLAR1 Agua Caliente Solar Planned 290.00 120.00
ALLGNY_6_HYDRO1 Salmon Creek Hydroelectric Project Forced 0.52 0.00
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Planned 23.80 23.80
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 0.00
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Planned 33.00 0.00
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 249.00
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 47.49 2.69
BEARCN_2_UNITS GEYSERS BEAR CANYON AGGREGATE Forced 22.00 22.00
BEARMT_1_UNIT BEAR MOUNTAIN LIMITED Forced 47.49 0.89
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 5.00
BLCKBT_2_STONEY BLACK BUTTE HYDRO Forced 6.20 6.20
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Planned 51.25 0.99
BOWMN_6_UNIT BOWMAN Planned 6.25 6.25
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 12.60
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 1.50
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 4.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 2.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00
BRDWAY_7_UNIT 3 BROADWAY UNIT 3 Planned 65.00 65.00
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Planned/Forced 59.00 1.00
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00
CANTUA_1_SOLAR Cantua Solar Station Forced 20.00 0.60
CAPMAD_1_UNIT 1 CAPCO MADERA Power Plant Forced 24.00 24.00
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 47.49 3.39
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned 10.80 1.00
CHWCHL_1_UNIT CHOW 2 PEAKER PLANT Forced 48.60 3.60
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 12.11
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 11.42
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 18.41
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 11.95
COLCEM_6_UNITS CALIFORNIA PORTLAND CEMENT COMPANY Forced 25.00 0.00
CONTRL_1_CASAD1 Mammoth G1 Forced 10.00 4.50
CONTRL_1_CASAD3 Mammoth G3 Forced 14.00 5.50
COWCRK_2_UNIT Cow Creek Hydro Forced 2.00 0.00
CRELMN_6_RAMON2 Ramona 2 Forced 5.00 1.00
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 0.00
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 1.53
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.00
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 60.00
DEXZEL_1_UNIT Western Power and Steam Cogeneration Forced 36.80 0.00
DINUBA_6_UNIT DINUBA GENERATION PROJECT Planned/Forced 12.00 12.00
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 2.23
DSRTSN_2_SOLAR1 Desert Sunlight 300 Planned/Forced 300.00 300.00
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 0.00
ELCAJN_6_UNITA1 Cuyamaca Peak Energy Plant Forced 45.42 45.42
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 53.70
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 0.50
ENWIND_2_WIND1 Cameron Ridge Forced 47.10 6.80
ENWIND_2_WIND2 Ridgetop I Forced 65.00 24.70
ESCNDO_6_PL1X2 MMC Escondido Aggregate Planned 48.71 0.00
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Planned 48.04 0.00
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 0.20
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Forced 94.50 70.50
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.60 0.00
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 12.50
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 3.00
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 562.50 20.00
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Planned/Forced 74.40 0.00
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Planned 57.00 0.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Planned 95.00 39.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Planned 70.00 15.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Planned 85.00 40.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Planned/Forced 60.00 0.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Planned 72.00 20.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Planned/Forced 62.00 25.00
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Planned 3.04 1.46
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 5.29
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 0.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Planned/Forced 82.00 82.00
GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro Forced 3.75 2.44
HALSEY_6_UNIT HALSEY HYDRO Forced 13.50 13.50
HARBGN_7_UNITS HARBOR COGEN COMBINED CYCLE Forced 109.01 9.01
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 5.40
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Planned/Forced 49.98 3.32
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 3.07
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 101.00
HINSON_6_CARBGN BP WILMINGTON CALCINER Forced 30.00 30.00
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 4.00
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Planned/Forced 44.53 4.53
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 3.59
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 137.00
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00
IVWEST_2_SOLAR1 Imperial Valley West ( Q # 608) Forced 150.00 0.00
KELSO_2_UNITS Mariposa Energy Forced 196.00 0.24
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 2.00
KRNCNY_6_UNIT KERN CANYON Planned 11.50 1.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 8.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 5.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 5.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 259.54
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 6.10
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98
LAROA1_2_UNITA1 LR1 Planned 180.00 15.00
LAROA2_2_UNITA1 LR2 Forced 322.00 17.00
LASSEN_6_AGV1 AGV 1 Planned 1.80 1.80
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 294.00 9.20
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 47.49 3.39
LMBEPK_2_UNITA1 Lambie Energy Center, Unit #1 Planned 48.00 0.00
LMBEPK_2_UNITA2 Creed Energy Center, Unit #1 Planned 48.00 0.00
LMBEPK_2_UNITA3 Goose Haven Energy Center, Unit #1 Planned 48.00 0.00
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 561.29 13.29
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 21.48
MALAGA_1_PL1X2 Malaga Power Aggregate Planned/Forced 96.00 3.99
MANZNA_2_WIND Manzana Wind Forced 189.00 0.00
MCSWAN_6_UNITS MC SWAIN HYDRO Forced 10.00 10.00
MERCFL_6_UNIT MERCED FALLS Forced 3.50 3.50
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 18.16
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 1.99
MNDALY_7_UNIT 1 MANDALAY GEN STA. UNIT 1 Forced 215.00 215.00
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Forced 510.00 510.00
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 74.58
MRGT_6_MMAREF Miramar Energy Facility Forced 48.00 48.00
MSHGTS_6_MMARLF MIRAMAR LANDFILL Planned 5.00 0.00
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.00
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00
OCTILO_5_WIND Ocotillo Wind Energy Facility Forced 265.00 0.00
OGROVE_6_PL1X2 Orange Grove Energy Center Forced 99.90 4.23
OLDRIV_6_BIOGAS Bidart Old River 1 Forced 2.00 1.00
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 29.48
PALOMR_2_PL1X3 Palomar Energy Center Planned 575.00 0.00
PANDOL_6_UNIT DELANO ENERGY COMPANY AGGREGATE Forced 49.00 3.00
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 22.59
PEABDY_2_LNDFIL G2 Energy Hay Road Power Plant Forced 1.60 1.60
PITTSP_7_UNIT 5 PITTSBURG UNIT 5 Planned 312.00 172.00
PITTSP_7_UNIT 6 PITTSBURG UNIT 6 Planned 317.00 177.00
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
PLMSSR_6_HISIER High Sierra Cogeneration Aggregate Planned 6.00 2.99
PLSNTG_7_LNCLND Lincoln Landfill Power Plant Forced 4.98 3.08
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 400.00 0.00
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 8.57
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Planned 52.01 4.01
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 0.50
RENWD_1_QF Renwind re-powering project Forced 10.00 1.50
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Planned 2.50 2.50
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 18.00
RUSCTY_2_UNITS Russell City Energy Center Forced 620.00 19.20
SAMPSN_6_KELCO1 KELCO QUALIFYING FACILITY Forced 25.00 8.00
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 37.10
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 2.12
SAUGUS_7_LOPEZ MM Lopez Energy Planned 6.10 1.10
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 10.39
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 2.23
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Planned 53.00 21.00
SNMALF_6_UNITS Sonoma County Landfill Planned 7.50 4.10
SPICER_1_UNITS SPICER HYDRO UNITS 1-3 AGGREGATE Planned 6.00 6.00
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 25.02
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 29.00
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 0.00
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 4.80
TANHIL_6_SOLART BERRY PETROLEUM COGEN 18 AGGREGATE Planned 17.00 0.00
TERMEX_2_PL1X3 TDM Forced 625.00 27.00
THMENG_1_UNIT 1 THERMAL ENERGY DEV. CORP. Forced 18.50 18.50
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 4.00
TOPAZ_2_SOLAR Topaz Solar Farms Planned 550.00 0.00
TRNSWD_1_QF FPL Energy C Wind Forced 38.97 30.97
UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO Planned 3.50 1.00
UNVRSY_1_UNIT 1 Berry Cogen 38 - Unit 1 Planned 38.00 0.00
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 4.32
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 1.80
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Planned 50.61 2.61
VLYHOM_7_SSJID Woodward Power Plant Forced 3.00 0.00
WALNUT_7_WCOVCT WALNUT_7_WCOVCT Forced 4.50 4.50
WDFRDF_2_UNITS WEST FORD FLAT AGGREGATE Forced 32.60 7.60
WHEATL_6_LNDFIL G2 ENERGY, OSTROM ROAD LLC Forced 3.00 3.00
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 14 17 425.16 289.90
SoCal Gen Test 39 58 2788.59 1364.50
65 172 4011.71 1826.23
Total 118 247 7225.46 3480.63


Report Generated on:
06/22/2015 15:15:02 (PPT)
Filtered Parameters:
Date = 06/22/2015
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO
Configurable Parameters:
Time = 3:15PM PPT

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.