| Resource ID | 
          
										Resource Name
									 | 
          
										Outage Type
									 | 
          
										Capacity (MW)
									 | 
          
										Curtailed (MW)
									 | 
          
										Zone Name
									 | 
        
      
      
        | AGUCAL_5_SOLAR1 | 
        Agua Caliente Solar | 
        Forced | 
        290.00 | 
        0.00 | 
        SDGE Gen | 
      
      
        | ALTA3A_2_CPCE4 | 
        CPC East - Alta Wind 4 | 
        Planned | 
        102.00 | 
        102.00 | 
        SCE Gen | 
      
      
        | ALTA3A_2_CPCE8 | 
        CPC East - Alta Wind 8 | 
        Planned | 
        150.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | ALTA4B_2_CPCW6 | 
        CPC West - Alta Wind 6 | 
        Forced | 
        150.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | ALTA6B_2_WIND11 | 
        Alta Wind 11 | 
        Forced | 
        90.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | ALTA6E_2_WIND10 | 
        Alta Wind 10 | 
        Forced | 
        138.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | ANAHM_7_CT | 
        ANAHEIM COMBUSTION TURBINE | 
        Planned | 
        42.81 | 
        0.00 | 
        SCE Gen | 
      
      
        | ARBWD_6_QF | 
        Wind Resource II | 
        Forced | 
        19.95 | 
        0.65 | 
        SCE Gen | 
      
      
        | BIGCRK_2_EXESWD | 
        BIG CREEK HYDRO PROJECT PSP | 
        Planned | 
        820.00 | 
        767.00 | 
        SCE Gen | 
      
      
        | BISHOP_1_ALAMO | 
        BISHOP CREEK PLANT 2  AND  6 | 
        Planned/Forced | 
        13.40 | 
        4.50 | 
        SCE Gen | 
      
      
        | BISHOP_1_UNITS | 
        BISHOP CREEK PLANT 3  AND  4 | 
        Forced | 
        15.80 | 
        9.05 | 
        SCE Gen | 
      
      
        | BLAST_1_WIND | 
        Mountain View IV Wind | 
        Planned/Forced | 
        49.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | BLKCRK_2_SOLAR1 | 
        McCoy Station | 
        Planned | 
        250.00 | 
        161.00 | 
        SCE Gen | 
      
      
        | BLYTHE_1_SOLAR1 | 
        Blythe Solar 1 Project | 
        Planned | 
        21.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | BOGUE_1_UNITA1 | 
        Feather River Energy Center, Unit #1 | 
        Forced | 
        46.30 | 
        0.00 | 
        PGAE North | 
      
      
        | BORDER_6_UNITA1 | 
        CalPeak Power Border Unit 1 | 
        Planned | 
        51.25 | 
        3.25 | 
        SDGE Gen | 
      
      
        | BUCKWD_1_QF | 
        Buckwind Re-powering project | 
        Forced | 
        16.50 | 
        1.50 | 
        SCE Gen | 
      
      
        | BUTTVL_7_UNIT 1 | 
        BUTT VALLEY HYDRO | 
        Forced | 
        40.00 | 
        4.00 | 
        PGAE North | 
      
      
        | CARBOU_7_PL4X5 | 
        CARIBOU PH 2 UNIT 4 & 5 AGGREGATE | 
        Planned/Forced | 
        122.00 | 
        122.00 | 
        PGAE North | 
      
      
        | CBRLLO_6_PLSTP1 | 
        POINT LOMA SEWAGE TREATMENT PLANT | 
        Planned | 
        4.83 | 
        2.83 | 
        SDGE Gen | 
      
      
        | CCRITA_7_RPPCHF | 
        Rancho Penasquitos Hydro Facility | 
        Planned | 
        5.25 | 
        5.25 | 
        SDGE Gen | 
      
      
        | CENTER_2_QF | 
        CENTER QFS | 
        Forced | 
        31.00 | 
        31.00 | 
        SCE Gen | 
      
      
        | CHINO_6_SMPPAP | 
        SIMPSON PAPER | 
        Planned | 
        44.00 | 
        44.00 | 
        SCE Gen | 
      
      
        | CHINO_7_MILIKN | 
        MN Milliken Genco LLC | 
        Planned | 
        1.90 | 
        1.90 | 
        SCE Gen | 
      
      
        | COLEMN_2_UNIT | 
        Coleman | 
        Planned | 
        13.00 | 
        0.00 | 
        PGAE North | 
      
      
        | COLGAT_7_UNIT 1 | 
        COLGATE HYDRO UNIT 1 | 
        Planned | 
        176.72 | 
        176.72 | 
        PGAE North | 
      
      
        | COLGAT_7_UNIT 2 | 
        COLGATE HYDRO UNIT 2 | 
        Forced | 
        175.67 | 
        41.67 | 
        PGAE North | 
      
      
        | COLUSA_2_PL1X3 | 
        Colusa Generating Station | 
        Forced | 
        641.00 | 
        18.30 | 
        PGAE North | 
      
      
        | CONTRL_1_CASAD1 | 
        Mammoth G1 | 
        Forced | 
        10.00 | 
        2.80 | 
        SCE Gen | 
      
      
        | CONTRL_1_CASAD3 | 
        Mammoth G3 | 
        Forced | 
        14.00 | 
        0.90 | 
        SCE Gen | 
      
      
        | CORONS_6_CLRWTR | 
        Clearwater Power Plant | 
        Planned | 
        28.00 | 
        28.00 | 
        SCE Gen | 
      
      
        | CRSTWD_6_KUMYAY | 
        Kumeyaay Wind Farm | 
        Forced | 
        50.00 | 
        0.00 | 
        SDGE Gen | 
      
      
        | CSLR4S_2_SOLAR | 
        Csolar IV South | 
        Planned | 
        130.00 | 
        21.60 | 
        SDGE Gen | 
      
      
        | DVLCYN_1_UNITS | 
        DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE | 
        Planned/Forced | 
        236.80 | 
        0.00 | 
        SCE Gen | 
      
      
        | EASTWD_7_UNIT | 
        EASTWOOD PUMP-GEN | 
        Planned | 
        200.00 | 
        200.00 | 
        SCE Gen | 
      
      
        | ELCAJN_6_LM6K | 
        El Cajon Energy Center | 
        Planned | 
        48.10 | 
        0.00 | 
        SDGE Gen | 
      
      
        | ELCAJN_7_GT1 | 
        EL CAJON | 
        Forced | 
        16.36 | 
        16.36 | 
        SDGE Gen | 
      
      
        | ELDORO_7_UNIT 1 | 
        El Dorado Unit 1 | 
        Planned | 
        11.00 | 
        11.00 | 
        PGAE North | 
      
      
        | ELDORO_7_UNIT 2 | 
        El Dorado Unit 2 | 
        Planned | 
        11.00 | 
        11.00 | 
        PGAE North | 
      
      
        | ELECTR_7_PL1X3 | 
        ELECTRA PH UNIT 1 & 2 AGGREGATE | 
        Planned | 
        101.50 | 
        38.10 | 
        PGAE North | 
      
      
        | ELSEGN_2_UN1011 | 
        El Segundo Energy Center 5/6 | 
        Forced | 
        263.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | ELSEGN_2_UN2021 | 
        El Segundo Energy Center 7/8 | 
        Forced | 
        263.68 | 
        0.00 | 
        SCE Gen | 
      
      
        | ENWIND_2_WIND2 | 
        Ridgetop I | 
        Planned | 
        65.00 | 
        46.30 | 
        SCE Gen | 
      
      
        | ESCNDO_6_UNITB1 | 
        CalPeak Power Enterprise Unit 1 | 
        Planned | 
        48.04 | 
        0.04 | 
        SDGE Gen | 
      
      
        | ETIWND_2_FONTNA | 
        FONTANALYTLE CREEK POWERHOUSE P | 
        Planned | 
        2.56 | 
        2.06 | 
        SCE Gen | 
      
      
        | ETIWND_6_MWDETI | 
        ETIWANDA RECOVERY HYDRO | 
        Planned | 
        24.00 | 
        24.00 | 
        SCE Gen | 
      
      
        | ETIWND_7_MIDVLY | 
        MN Mid Valley Genco  LLC | 
        Planned | 
        2.10 | 
        1.50 | 
        SCE Gen | 
      
      
        | ETIWND_7_UNIT 4 | 
        ETIWANDA GEN STA. UNIT 4 | 
        Forced | 
        320.00 | 
        70.00 | 
        SCE Gen | 
      
      
        | GALE_1_SEGS1 | 
        SUNRAY ENERGY, INC. - SEGS 1 | 
        Planned | 
        14.20 | 
        14.20 | 
        SCE Gen | 
      
      
        | GARNET_1_UNITS | 
        GARNET GREEN POWER PROJECT AGGREGATE | 
        Forced | 
        16.50 | 
        1.50 | 
        SCE Gen | 
      
      
        | GARNET_1_WINDS | 
        Garnet Winds Aggregation | 
        Forced | 
        22.50 | 
        1.50 | 
        SCE Gen | 
      
      
        | GARNET_2_WIND2 | 
        Karen Avenue Wind Farm | 
        Forced | 
        11.70 | 
        3.00 | 
        SCE Gen | 
      
      
        | GLNARM_7_UNIT 1 | 
        GLEN ARM UNIT 1 | 
        Planned | 
        22.07 | 
        22.07 | 
        SCE Gen | 
      
      
        | GLNARM_7_UNIT 2 | 
        GLEN ARM UNIT 2 | 
        Forced | 
        22.30 | 
        22.30 | 
        SCE Gen | 
      
      
        | GRNLF1_1_UNITS | 
        GREENLEAF #1 COGEN AGGREGATE | 
        Forced | 
        49.50 | 
        0.30 | 
        PGAE North | 
      
      
        | HAASPH_7_PL1X2 | 
        HAAS PH UNIT 1 & 2 AGGREGATE | 
        Forced | 
        144.00 | 
        0.00 | 
        PGAE North | 
      
      
        | HIDSRT_2_UNITS | 
        HIGH DESERT POWER PROJECT AGGREGATE | 
        Forced | 
        830.00 | 
        82.00 | 
        SCE Gen | 
      
      
        | HUMBPP_6_UNITS | 
        Humboldt Bay Generating Station 1 | 
        Planned | 
        97.62 | 
        16.27 | 
        PGAE North | 
      
      
        | INDIGO_1_UNIT 1 | 
        INDIGO PEAKER UNIT 1 | 
        Planned | 
        44.00 | 
        44.00 | 
        SCE Gen | 
      
      
        | INDIGO_1_UNIT 2 | 
        INDIGO PEAKER UNIT 2 | 
        Planned | 
        44.53 | 
        3.53 | 
        SCE Gen | 
      
      
        | INDIGO_1_UNIT 3 | 
        INDIGO PEAKER UNIT 3 | 
        Planned | 
        43.69 | 
        1.76 | 
        SCE Gen | 
      
      
        | IVWEST_2_SOLAR1 | 
        Imperial Valley West ( Q # 608)  | 
        Planned/Forced | 
        150.00 | 
        1.00 | 
        SDGE Gen | 
      
      
        | JAWBNE_2_NSRWND | 
        North Sky River Wind Project | 
        Forced | 
        160.00 | 
        4.80 | 
        SCE Gen | 
      
      
        | KEARNY_7_KY2 | 
        KEARNY GT2 AGGREGATE | 
        Forced | 
        59.00 | 
        0.00 | 
        SDGE Gen | 
      
      
        | KEARNY_7_KY3 | 
        KEARNY GT3 AGGREGATE | 
        Forced | 
        61.00 | 
        0.00 | 
        SDGE Gen | 
      
      
        | KELYRG_6_UNIT | 
        KELLY RIDGE HYDRO | 
        Forced | 
        11.00 | 
        11.00 | 
        PGAE North | 
      
      
        | KERKH2_7_UNIT 1 | 
        KERKHOFF PH 2 UNIT #1 | 
        Planned | 
        153.90 | 
        153.90 | 
        PGAE North | 
      
      
        | KERRGN_1_UNIT 1 | 
        KERN RIVER HYDRO UNITS 1-4 AGGREGATE | 
        Planned/Forced | 
        25.60 | 
        0.00 | 
        SCE Gen | 
      
      
        | KILARC_2_UNIT 1 | 
        KILARC HYDRO | 
        Planned | 
        3.20 | 
        0.00 | 
        PGAE North | 
      
      
        | LARKSP_6_UNIT 1 | 
        LARKSPUR PEAKER UNIT 1 | 
        Forced | 
        46.10 | 
        0.10 | 
        SDGE Gen | 
      
      
        | LARKSP_6_UNIT 2 | 
        LARKSPUR PEAKER UNIT 2 | 
        Forced | 
        47.98 | 
        2.98 | 
        SDGE Gen | 
      
      
        | LAROA1_2_UNITA1 | 
        LR1 | 
        Forced | 
        180.00 | 
        15.00 | 
        SDGE Gen | 
      
      
        | LAROA2_2_UNITA1 | 
        LR2 | 
        Forced | 
        322.00 | 
        12.00 | 
        SDGE Gen | 
      
      
        | MANZNA_2_WIND | 
        Manzana Wind | 
        Forced | 
        189.00 | 
        7.50 | 
        SCE Gen | 
      
      
        | MDFKRL_2_PROJCT | 
        MIDDLE FORK AND RALSTON PSP | 
        Planned | 
        218.39 | 
        69.00 | 
        PGAE North | 
      
      
        | MONLTH_6_BOREL | 
        BOREL HYDRO UNITS 1-3 AGGREGATE | 
        Planned/Forced | 
        11.00 | 
        11.00 | 
        SCE Gen | 
      
      
        | MOORPK_7_UNITA1 | 
        WEME- Simi Valley Landfill | 
        Planned | 
        2.49 | 
        2.49 | 
        SCE Gen | 
      
      
        | MRCHNT_2_PL1X3 | 
        Desert Star Energy Center | 
        Forced | 
        494.58 | 
        5.58 | 
        SCE Gen | 
      
      
        | MRGT_6_MMAREF | 
        Miramar Energy Facility | 
        Planned | 
        48.00 | 
        48.00 | 
        SDGE Gen | 
      
      
        | MSHGTS_6_MMARLF | 
        MIRAMAR LANDFILL | 
        Planned | 
        5.00 | 
        0.00 | 
        SDGE Gen | 
      
      
        | MTWIND_1_UNIT 1 | 
        Mountain View Power Project I | 
        Planned | 
        44.40 | 
        17.40 | 
        SCE Gen | 
      
      
        | MTWIND_1_UNIT 2 | 
        Mountain View Power Project II | 
        Planned | 
        22.20 | 
        8.70 | 
        SCE Gen | 
      
      
        | MTWIND_1_UNIT 3 | 
        Mountain View Power Project III | 
        Forced | 
        22.44 | 
        8.44 | 
        SCE Gen | 
      
      
        | NAROW2_2_UNIT | 
        NARROWS PH 2 UNIT | 
        Forced | 
        55.00 | 
        55.00 | 
        PGAE North | 
      
      
        | OGROVE_6_PL1X2 | 
        Orange Grove Energy Center | 
        Planned/Forced | 
        96.00 | 
        49.00 | 
        SDGE Gen | 
      
      
        | OMAR_2_UNIT 1 | 
        KERN RIVER COGENERATION CO. UNIT 1 | 
        Forced | 
        78.00 | 
        1.60 | 
        SCE Gen | 
      
      
        | OMAR_2_UNIT 2 | 
        KERN RIVER COGENERATION CO. UNIT 2 | 
        Forced | 
        78.11 | 
        0.11 | 
        SCE Gen | 
      
      
        | OMAR_2_UNIT 3 | 
        KERN RIVER COGENERATION CO. UNIT 3 | 
        Forced | 
        81.41 | 
        1.61 | 
        SCE Gen | 
      
      
        | OTAY_6_LNDFL5 | 
        Otay 5 | 
        Planned | 
        1.50 | 
        1.50 | 
        SDGE Gen | 
      
      
        | OTMESA_2_PL1X3 | 
        OTAY MESA ENERGY CENTER | 
        Forced | 
        603.68 | 
        5.68 | 
        SDGE Gen | 
      
      
        | PACLUM_6_UNIT | 
        PACIFIC LUMBER (HUMBOLDT) | 
        Forced | 
        28.80 | 
        28.80 | 
        PGAE North | 
      
      
        | PADUA_2_ONTARO | 
        ONTARIO/SIERRA HYDRO PSP | 
        Planned | 
        1.92 | 
        1.22 | 
        SCE Gen | 
      
      
        | PANDOL_6_UNIT | 
        Covanta Delano, Inc. | 
        Forced | 
        49.00 | 
        34.00 | 
        SCE Gen | 
      
      
        | PANSEA_1_PANARO | 
        Mesa Wind Project | 
        Forced | 
        30.00 | 
        21.61 | 
        SCE Gen | 
      
      
        | PIT4_7_PL1X2 | 
        PIT PH 4 UNITS 1 & 2 AGGREGATE | 
        Planned | 
        95.00 | 
        95.00 | 
        PGAE North | 
      
      
        | PIT5_7_PL1X2 | 
        PIT PH 5 UNITS 1 & 2 AGGREGATE | 
        Forced | 
        82.00 | 
        41.00 | 
        PGAE North | 
      
      
        | PIT5_7_PL3X4 | 
        PIT PH 5 UNITS 3 & 4 AGGREGATE | 
        Planned | 
        82.00 | 
        82.00 | 
        PGAE North | 
      
      
        | POEPH_7_UNIT 1 | 
        POE HYDRO UNIT 1 | 
        Planned | 
        69.00 | 
        69.00 | 
        PGAE North | 
      
      
        | POEPH_7_UNIT 2 | 
        POE HYDRO UNIT 2 | 
        Planned | 
        68.50 | 
        68.50 | 
        PGAE North | 
      
      
        | POTTER_6_UNITS | 
        Potter Valley | 
        Planned | 
        10.10 | 
        10.10 | 
        PGAE North | 
      
      
        | PWEST_1_UNIT | 
        PACIFIC WEST 1 WIND GENERATION | 
        Forced | 
        2.10 | 
        2.10 | 
        SCE Gen | 
      
      
        | RECTOR_2_QF | 
        RECTOR QFS | 
        Forced | 
        19.50 | 
        0.00 | 
        SCE Gen | 
      
      
        | RENWD_1_QF | 
        Renwind re-powering project | 
        Forced | 
        10.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | ROSMDW_2_WIND1 | 
        Pacific Wind - Phase 1 | 
        Forced | 
        140.00 | 
        1.00 | 
        SDGE Gen | 
      
      
        | SAMPSN_6_KELCO1 | 
        KELCO QUALIFYING FACILITY | 
        Planned | 
        25.00 | 
        7.40 | 
        SDGE Gen | 
      
      
        | SANTGO_6_COYOTE | 
        GAS RECOVERY SYS. (COYOTE CANYON) | 
        Forced | 
        9.99 | 
        7.24 | 
        SCE Gen | 
      
      
        | SANWD_1_QF | 
        San Gorgonio Farms Wind Farm | 
        Planned | 
        31.00 | 
        2.00 | 
        SCE Gen | 
      
      
        | SAUGUS_7_LOPEZ | 
        MM Lopez Energy | 
        Planned | 
        6.10 | 
        0.90 | 
        SCE Gen | 
      
      
        | SBERDO_2_PSP3 | 
        Mountainview Gen Sta. Unit 3 | 
        Planned/Forced | 
        525.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | SBERDO_2_PSP4 | 
        Mountainview Gen Sta. Unit 4 | 
        Forced | 
        525.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | SBERDO_2_SNTANA | 
        SANTA ANA PSP | 
        Planned | 
        6.95 | 
        5.95 | 
        SCE Gen | 
      
      
        | SBERDO_6_MILLCK | 
        MILL CREEK PSP | 
        Planned | 
        3.93 | 
        2.93 | 
        SCE Gen | 
      
      
        | SLYCRK_1_UNIT 1 | 
        SLY CREEK HYDRO | 
        Planned | 
        13.00 | 
        13.00 | 
        PGAE North | 
      
      
        | SMRCOS_6_LNDFIL | 
        San Marcos Energy | 
        Forced | 
        1.50 | 
        0.00 | 
        SDGE Gen | 
      
      
        | STNRES_1_UNIT | 
        Covanta Stanislaus | 
        Forced | 
        19.90 | 
        11.90 | 
        PGAE North | 
      
      
        | SYCAMR_2_UNIT 1 | 
        Sycamore Cogeneration Unit 1 | 
        Planned | 
        85.00 | 
        5.67 | 
        SCE Gen | 
      
      
        | SYCAMR_2_UNIT 2 | 
        Sycamore Cogeneration Unit 2 | 
        Planned | 
        85.00 | 
        4.41 | 
        SCE Gen | 
      
      
        | SYCAMR_2_UNIT 3 | 
        Sycamore Cogeneration Unit 3 | 
        Planned | 
        85.00 | 
        2.85 | 
        SCE Gen | 
      
      
        | SYCAMR_2_UNIT 4 | 
        Sycamore Cogeneration Unit 4 | 
        Planned | 
        85.00 | 
        3.78 | 
        SCE Gen | 
      
      
        | TERMEX_2_PL1X3 | 
        TDM | 
        Forced | 
        625.00 | 
        0.00 | 
        SDGE Gen | 
      
      
        | TIFFNY_1_DILLON | 
        TIFFNY_1_DILLON | 
        Forced | 
        45.00 | 
        18.00 | 
        SCE Gen | 
      
      
        | ULTRCK_2_UNIT | 
        Rio Bravo Rocklin | 
        Planned | 
        28.80 | 
        0.00 | 
        PGAE North | 
      
      
        | VALLEY_7_BADLND | 
        VALLEY_7_BADLND | 
        Forced | 
        1.30 | 
        1.30 | 
        SCE Gen | 
      
      
        | VALLEY_7_UNITA1 | 
        WM Energy, El Sobrante Landfill | 
        Forced | 
        3.74 | 
        1.84 | 
        SCE Gen | 
      
      
        | VESTAL_2_KERN | 
        KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE | 
        Forced | 
        36.80 | 
        16.30 | 
        SCE Gen | 
      
      
        | VESTAL_2_WELLHD | 
        Wellhead Power Delano | 
        Forced | 
        49.00 | 
        49.00 | 
        SCE Gen | 
      
      
        | VINCNT_2_WESTWD | 
        Oasis Power Plant | 
        Planned | 
        60.00 | 
        4.00 | 
        SCE Gen | 
      
      
        | WALCRK_2_CTG1 | 
        Walnut Creek Energy Park Unit 1 | 
        Planned | 
        96.43 | 
        0.00 | 
        SCE Gen | 
      
      
        | WALCRK_2_CTG2 | 
        Walnut Creek Energy Park Unit 2 | 
        Planned | 
        96.91 | 
        0.00 | 
        SCE Gen | 
      
      
        | WALCRK_2_CTG3 | 
        Walnut Creek Energy Park Unit 3 | 
        Planned | 
        96.65 | 
        0.00 | 
        SCE Gen | 
      
      
        | WALCRK_2_CTG4 | 
        Walnut Creek Energy Park Unit 4 | 
        Planned | 
        96.49 | 
        0.00 | 
        SCE Gen | 
      
      
        | WALCRK_2_CTG5 | 
        Walnut Creek Energy Park Unit 5 | 
        Planned | 
        96.65 | 
        0.00 | 
        SCE Gen | 
      
      
        | WALNUT_7_WCOVCT | 
        WALNUT_7_WCOVCT | 
        Forced | 
        4.50 | 
        4.50 | 
        SCE Gen | 
      
      
        | WDLEAF_7_UNIT 1 | 
        WOODLEAF HYDRO | 
        Planned | 
        60.00 | 
        60.00 | 
        PGAE North | 
      
      
        | WHTWTR_1_WINDA1 | 
        Whitewater Hill Wind Project | 
        Forced | 
        61.50 | 
        16.50 | 
        SCE Gen | 
      
      
        | WNDSTR_2_WIND | 
        Windstar | 
        Planned | 
        120.00 | 
        0.00 | 
        SCE Gen | 
      
      
        | YUBACT_6_UNITA1 | 
        Yuba City Energy Center (Calpine) | 
        Forced | 
        46.00 | 
        0.00 | 
        PGAE North | 
      
      
        | ADERA_1_SOLAR1 | 
        Adera Solar | 
        Planned | 
        20.00 | 
        7.00 | 
        
         | 
      
      
        | ADLIN_1_UNITS | 
        GEYSERS AIDLIN AGGREGATE | 
        Planned | 
        22.00 | 
        6.00 | 
        
         | 
      
      
        | ALLGNY_6_HYDRO1 | 
        Salmon Creek Hydroelectric Project | 
        Forced | 
        0.52 | 
        0.52 | 
        
         | 
      
      
        | ALMEGT_1_UNIT 1 | 
        ALAMEDA GT UNIT 1 | 
        Forced | 
        23.80 | 
        23.80 | 
        
         | 
      
      
        | ALMEGT_1_UNIT 2 | 
        ALAMEDA GT UNIT 2 | 
        Forced | 
        25.40 | 
        25.40 | 
        
         | 
      
      
        | ANZA_6_SOLAR1 | 
        Seville Solar One | 
        Planned/Forced | 
        20.00 | 
        2.67 | 
        
         | 
      
      
        | AVENAL_6_AVPARK | 
        Avenal Park Solar Project | 
        Forced | 
        6.00 | 
        0.00 | 
        
         | 
      
      
        | AVENAL_6_SANDDG | 
        Sand Drag Solar Project | 
        Forced | 
        19.00 | 
        0.00 | 
        
         | 
      
      
        | AVENAL_6_SUNCTY | 
        Sun City Solar Project | 
        Forced | 
        20.00 | 
        0.00 | 
        
         | 
      
      
        | BALCHS_7_UNIT 3 | 
        BALCH 2 PH UNIT 3 | 
        Planned | 
        54.60 | 
        54.60 | 
        
         | 
      
      
        | BCTSYS_5_PWXDYN | 
        BCTSYS_5_PWXDYN | 
        Forced | 
        428.00 | 
        128.00 | 
        
         | 
      
      
        | BDGRCK_1_UNITS | 
        BADGER CREEK LIMITED | 
        Forced | 
        47.49 | 
        2.99 | 
        
         | 
      
      
        | BEARMT_1_UNIT | 
        Bear Mountain Limited | 
        Forced | 
        47.49 | 
        1.09 | 
        
         | 
      
      
        | BELDEN_7_UNIT 1 | 
        BELDEN HYDRO | 
        Planned/Forced | 
        119.00 | 
        119.00 | 
        
         | 
      
      
        | BLCKBT_2_STONEY | 
        BLACK BUTTE HYDRO | 
        Forced | 
        6.20 | 
        6.20 | 
        
         | 
      
      
        | BNNIEN_7_ALTAPH | 
        ALTA POWER HOUSE | 
        Planned | 
        1.00 | 
        0.00 | 
        
         | 
      
      
        | BRDSLD_2_HIWIND | 
        High Winds Energy Center | 
        Forced | 
        162.00 | 
        5.40 | 
        
         | 
      
      
        | BRDSLD_2_MTZUM2 | 
        NextEra Energy Montezuma Wind II | 
        Forced | 
        78.20 | 
        0.00 | 
        
         | 
      
      
        | BRDSLD_2_MTZUMA | 
        FPL Energy Montezuma Wind | 
        Forced | 
        36.80 | 
        0.00 | 
        
         | 
      
      
        | BRDSLD_2_SHILO1 | 
        Shiloh I Wind Project | 
        Forced | 
        150.00 | 
        3.00 | 
        
         | 
      
      
        | BRDSLD_2_SHILO2 | 
        SHILOH WIND PROJECT 2 | 
        Planned | 
        150.00 | 
        4.00 | 
        
         | 
      
      
        | BRDSLD_2_SHLO3A | 
        Shiloh III Wind Project, LLC | 
        Forced | 
        102.50 | 
        2.50 | 
        
         | 
      
      
        | BRDSLD_2_SHLO3B | 
        Shiloh IV Wind Project | 
        Forced | 
        100.00 | 
        0.00 | 
        
         | 
      
      
        | BUCKCK_7_PL1X2 | 
        BUCKS CREEK AGGREGATE | 
        Planned | 
        59.00 | 
        34.00 | 
        
         | 
      
      
        | CAPWD_1_QF | 
        Edom Hills Wind Farm | 
        Forced | 
        19.55 | 
        4.55 | 
        
         | 
      
      
        | CAYTNO_2_VASCO | 
        Vasco Road | 
        Forced | 
        4.30 | 
        0.00 | 
        
         | 
      
      
        | CHALK_1_UNIT | 
        CHALK CLIFF LIMITED | 
        Forced | 
        47.49 | 
        1.99 | 
        
         | 
      
      
        | CHWCHL_1_BIOMAS | 
        Chow II Biomass to Energy | 
        Planned/Forced | 
        10.80 | 
        10.80 | 
        
         | 
      
      
        | CLRKRD_6_LIMESD | 
        Lime Saddle Hydro | 
        Forced | 
        2.00 | 
        2.00 | 
        
         | 
      
      
        | CNTRVL_6_UNIT | 
        Centerville | 
        Forced | 
        6.40 | 
        6.40 | 
        
         | 
      
      
        | COCOPP_2_CTG1 | 
        Marsh Landing 1 | 
        Forced | 
        204.20 | 
        2.62 | 
        
         | 
      
      
        | COCOPP_2_CTG2 | 
        Marsh Landing 2 | 
        Forced | 
        202.70 | 
        1.97 | 
        
         | 
      
      
        | COCOPP_2_CTG3 | 
        Marsh Landing 3 | 
        Forced | 
        208.96 | 
        8.67 | 
        
         | 
      
      
        | COCOPP_2_CTG4 | 
        Marsh Landing 4 | 
        Forced | 
        204.29 | 
        2.11 | 
        
         | 
      
      
        | CONTAN_1_UNIT | 
        Graphic Packaging Cogen | 
        Forced | 
        27.70 | 
        27.70 | 
        
         | 
      
      
        | COTTLE_2_FRNKNH | 
        Frankenheimer Power Plant | 
        Forced | 
        5.30 | 
        0.00 | 
        
         | 
      
      
        | CSTRVL_7_PL1X2 | 
        Marina Land Fill Gas | 
        Planned | 
        4.53 | 
        2.53 | 
        
         | 
      
      
        | DALYCT_1_FCELL | 
        PGE San Francisco State Fuel Cell | 
        Forced | 
        1.60 | 
        1.40 | 
        
         | 
      
      
        | DEADCK_1_UNIT | 
        DEADCK_1_UNIT | 
        Planned | 
        2.00 | 
        2.00 | 
        
         | 
      
      
        | DELTA_2_PL1X4 | 
        DELTA ENERGY CENTER AGGREGATE | 
        Forced | 
        880.00 | 
        30.00 | 
        
         | 
      
      
        | DINUBA_6_UNIT | 
        DINUBA GENERATION PROJECT | 
        Forced | 
        12.00 | 
        12.00 | 
        
         | 
      
      
        | DONNLS_7_UNIT | 
        Donnells Hydro | 
        Planned | 
        72.00 | 
        72.00 | 
        
         | 
      
      
        | DOUBLC_1_UNITS | 
        DOUBLE "C" LIMITED | 
        Forced | 
        52.23 | 
        0.93 | 
        
         | 
      
      
        | DSRTSL_2_SOLAR1 | 
        Desert Stateline | 
        Planned/Forced | 
        299.99 | 
        189.99 | 
        
         | 
      
      
        | ELKCRK_6_STONYG | 
        STONEY GORGE HYDRO AGGREGATE | 
        Forced | 
        4.90 | 
        4.90 | 
        
         | 
      
      
        | ELKHIL_2_PL1X3 | 
        ELK HILLS COMBINED CYCLE (AGGREGATE) | 
        Forced | 
        551.70 | 
        54.70 | 
        
         | 
      
      
        | ELNIDP_6_BIOMAS | 
        El Nido Biomass to Energy | 
        Planned | 
        10.50 | 
        1.00 | 
        
         | 
      
      
        | EXCHEC_7_UNIT 1 | 
        EXCHEQUER HYDRO | 
        Planned | 
        94.50 | 
        94.50 | 
        
         | 
      
      
        | FLOWD2_2_FPLWND | 
        DIABLO WINDS | 
        Forced | 
        18.60 | 
        0.00 | 
        
         | 
      
      
        | FORKBU_6_UNIT | 
        HYPOWER, INC. (FORKS OF BUTTE) | 
        Forced | 
        14.30 | 
        14.30 | 
        
         | 
      
      
        | GATWAY_2_PL1X3 | 
        GATEWAY GENERATING STATION | 
        Planned | 
        562.50 | 
        562.50 | 
        
         | 
      
      
        | GEYS11_7_UNIT11 | 
        GEYSERS UNIT 11 (HEALDSBURG) | 
        Forced | 
        74.40 | 
        7.40 | 
        
         | 
      
      
        | GEYS12_7_UNIT12 | 
        GEYSERS UNIT 12 (HEALDSBURG) | 
        Forced | 
        57.00 | 
        3.00 | 
        
         | 
      
      
        | GEYS13_7_UNIT13 | 
        GEYSERS UNIT 13 (HEALDSBURG) | 
        Planned/Forced | 
        95.00 | 
        10.00 | 
        
         | 
      
      
        | GEYS14_7_UNIT14 | 
        GEYSERS UNIT 14 (HEALDSBURG) | 
        Forced | 
        70.00 | 
        10.00 | 
        
         | 
      
      
        | GEYS16_7_UNIT16 | 
        GEYSERS UNIT 16 (HEALDSBURG) | 
        Forced | 
        85.00 | 
        85.00 | 
        
         | 
      
      
        | GEYS17_7_UNIT17 | 
        GEYSERS UNIT 17 (HEALDSBURG) | 
        Planned | 
        60.00 | 
        0.00 | 
        
         | 
      
      
        | GEYS18_7_UNIT18 | 
        GEYSERS UNIT 18 (HEALDSBURG) | 
        Forced | 
        72.00 | 
        72.00 | 
        
         | 
      
      
        | GEYS20_7_UNIT20 | 
        GEYSERS UNIT 20 (HEALDSBURG) | 
        Forced | 
        62.00 | 
        62.00 | 
        
         | 
      
      
        | GIFFEN_6_SOLAR | 
        Giffen Solar Station | 
        Planned | 
        10.00 | 
        10.00 | 
        
         | 
      
      
        | GRIFFI_2_LSPDYN | 
        Griffith Energy | 
        Forced | 
        570.00 | 
        370.00 | 
        
         | 
      
      
        | GRNVLY_7_SCLAND | 
        SANTA CRUZ LANDFILL GENERATING PLANT | 
        Planned | 
        3.04 | 
        1.46 | 
        
         | 
      
      
        | GWFPWR_1_UNITS | 
        HANFORD PEAKER PLANT | 
        Forced | 
        98.46 | 
        0.41 | 
        
         | 
      
      
        | GYS5X6_7_UNITS | 
        GEYSERS UNITS 5 & 6 AGGREGATE | 
        Forced | 
        85.00 | 
        0.00 | 
        
         | 
      
      
        | GYS7X8_7_UNITS | 
        GEYSERS UNITS 7 & 8 AGGREGATE | 
        Planned/Forced | 
        82.00 | 
        4.00 | 
        
         | 
      
      
        | GYSRVL_7_WSPRNG | 
        Sonoma CWA Warm Springs Hydro | 
        Forced | 
        3.75 | 
        2.42 | 
        
         | 
      
      
        | HATRDG_2_WIND | 
        Hatchet Ridge Wind Farm | 
        Forced | 
        102.00 | 
        0.80 | 
        
         | 
      
      
        | HELMPG_7_UNIT 1 | 
        HELMS PUMP-GEN UNIT 1 | 
        Planned | 
        407.00 | 
        407.00 | 
        
         | 
      
      
        | HENRTA_6_UNITA1 | 
        GWF HENRIETTA PEAKER PLANT UNIT 1 | 
        Forced | 
        49.98 | 
        1.28 | 
        
         | 
      
      
        | HENRTA_6_UNITA2 | 
        GWF HENRIETTA PEAKER PLANT UNIT 2 | 
        Forced | 
        49.42 | 
        0.83 | 
        
         | 
      
      
        | HMLTBR_6_UNITS | 
        HAMILTON BRANCH PH (AGGREGATE) | 
        Planned/Forced | 
        4.90 | 
        4.90 | 
        
         | 
      
      
        | HYTTHM_2_UNITS | 
        HYATT-THERMALITO PUMP-GEN (AGGREGATE) | 
        Planned/Forced | 
        933.10 | 
        740.10 | 
        
         | 
      
      
        | INTKEP_2_UNITS | 
        CCSF Hetch_Hetchy Hydro Aggregate | 
        Planned/Forced | 
        405.00 | 
        111.00 | 
        
         | 
      
      
        | INTMNT_3_RIVERSIDE | 
        IPPDYN | 
        Forced | 
        137.00 | 
        1.00 | 
        
         | 
      
      
        | JAKVAL_6_UNITG1 | 
        BUENA VISTA | 
        Forced | 
        17.84 | 
        17.84 | 
        
         | 
      
      
        | KELSO_2_UNITS | 
        Mariposa Energy | 
        Forced | 
        196.00 | 
        0.00 | 
        
         | 
      
      
        | KERMAN_6_SOLAR2 | 
        Fresno Solar West | 
        Forced | 
        1.50 | 
        0.75 | 
        
         | 
      
      
        | KERNFT_1_UNITS | 
        KERN FRONT LIMITED | 
        Forced | 
        52.40 | 
        0.90 | 
        
         | 
      
      
        | KRNCNY_6_UNIT | 
        KERN CANYON | 
        Planned | 
        11.50 | 
        1.00 | 
        
         | 
      
      
        | LAMONT_1_SOLAR3 | 
        Woodmere Solar Farm | 
        Planned/Forced | 
        14.99 | 
        0.00 | 
        
         | 
      
      
        | LAMONT_1_SOLAR4 | 
        Hayworth Solar Farm | 
        Planned | 
        26.66 | 
        0.00 | 
        
         | 
      
      
        | LAPAC_6_UNIT | 
        LOUISIANA PACIFIC SAMOA | 
        Forced | 
        20.00 | 
        20.00 | 
        
         | 
      
      
        | LAPLMA_2_UNIT 1 | 
        La Paloma Generating Plant Unit #1 | 
        Forced | 
        259.80 | 
        6.80 | 
        
         | 
      
      
        | LAPLMA_2_UNIT 2 | 
        La Paloma Generating Plant Unit #2 | 
        Forced | 
        260.20 | 
        6.20 | 
        
         | 
      
      
        | LAPLMA_2_UNIT 3 | 
        La Paloma Generating Plant Unit #3 | 
        Forced | 
        256.15 | 
        56.15 | 
        
         | 
      
      
        | LAPLMA_2_UNIT 4 | 
        LA PALOMA GENERATING PLANT, UNIT #4 | 
        Forced | 
        259.54 | 
        259.54 | 
        
         | 
      
      
        | LASSEN_6_AGV1 | 
        AGV 1 | 
        Planned | 
        1.80 | 
        1.80 | 
        
         | 
      
      
        | LECEF_1_UNITS | 
        LOS ESTEROS ENERGY FACILITY AGGREGATE | 
        Forced | 
        294.00 | 
        6.80 | 
        
         | 
      
      
        | LIVOAK_1_UNIT 1 | 
        LIVE OAK LIMITED | 
        Forced | 
        47.49 | 
        47.49 | 
        
         | 
      
      
        | LMEC_1_PL1X3 | 
        Los Medanos Energy Center AGGREGATE | 
        Forced | 
        561.29 | 
        561.29 | 
        
         | 
      
      
        | LODIEC_2_PL1X2 | 
        Lodi Energy Center | 
        Forced | 
        302.58 | 
        15.18 | 
        
         | 
      
      
        | MALAGA_1_PL1X2 | 
        Malaga Power Aggregate | 
        Planned | 
        96.00 | 
        96.00 | 
        
         | 
      
      
        | MARCPW_6_SOLAR1 | 
        Maricopa West Solar PV | 
        Planned | 
        20.00 | 
        4.00 | 
        
         | 
      
      
        | MCSWAN_6_UNITS | 
        MC SWAIN HYDRO | 
        Planned | 
        10.00 | 
        10.00 | 
        
         | 
      
      
        | MENBIO_6_RENEW1 | 
        CalRENEW - 1(A) | 
        Forced | 
        5.00 | 
        0.50 | 
        
         | 
      
      
        | MERCFL_6_UNIT | 
        MERCED FALLS | 
        Forced | 
        3.50 | 
        3.50 | 
        
         | 
      
      
        | METEC_2_PL1X3 | 
        Metcalf Energy Center | 
        Forced | 
        593.16 | 
        0.00 | 
        
         | 
      
      
        | MIDWD_2_WIND1 | 
        Windland Refresh 2 | 
        Forced | 
        7.81 | 
        7.81 | 
        
         | 
      
      
        | MKTRCK_1_UNIT 1 | 
        MCKITTRICK LIMITED | 
        Forced | 
        47.49 | 
        1.79 | 
        
         | 
      
      
        | MNDOTA_1_SOLAR2 | 
        Citizen Solar B  | 
        Forced | 
        5.00 | 
        0.00 | 
        
         | 
      
      
        | MOSSLD_2_PSP2 | 
        MOSS LANDING POWER BLOCK 2 | 
        Forced | 
        510.00 | 
        0.00 | 
        
         | 
      
      
        | MOSSLD_7_UNIT 7 | 
        MOSS LANDING UNIT 7 | 
        Forced | 
        755.00 | 
        15.00 | 
        
         | 
      
      
        | MTNPOS_1_UNIT | 
        MT.POSO COGENERATION CO. | 
        Forced | 
        46.64 | 
        4.64 | 
        
         | 
      
      
        | NCPA_7_GP2UN3 | 
        NCPA GEO PLANT 2 UNIT 3 | 
        Planned | 
        42.42 | 
        42.42 | 
        
         | 
      
      
        | OAK C_7_UNIT 1 | 
        OAKLAND STATION C GT UNIT 1 | 
        Forced | 
        55.00 | 
        0.00 | 
        
         | 
      
      
        | OAK C_7_UNIT 3 | 
        OAKLAND STATION C GT UNIT 3 | 
        Forced | 
        55.00 | 
        0.00 | 
        
         | 
      
      
        | OILFLD_7_QFUNTS | 
        Nacimiento Hydroelectric Plant | 
        Forced | 
        3.80 | 
        3.80 | 
        
         | 
      
      
        | OLDRIV_6_BIOGAS | 
        Bidart Old River 1 | 
        Forced | 
        2.00 | 
        1.00 | 
        
         | 
      
      
        | PARDEB_6_UNITS | 
        Pardee Power House | 
        Planned | 
        30.00 | 
        0.00 | 
        
         | 
      
      
        | PINFLT_7_UNITS | 
        PINE FLAT HYDRO AGGREGATE | 
        Planned/Forced | 
        210.00 | 
        210.00 | 
        
         | 
      
      
        | PITTSP_7_UNIT 6 | 
        PITTSBURG UNIT 6 | 
        Forced | 
        317.00 | 
        151.00 | 
        
         | 
      
      
        | PITTSP_7_UNIT 7 | 
        PITTSBURG UNIT 7 | 
        Planned | 
        530.00 | 
        530.00 | 
        
         | 
      
      
        | PLACVL_1_CHILIB | 
        Chili Bar Hydro | 
        Planned | 
        8.40 | 
        8.40 | 
        
         | 
      
      
        | PLSNTG_7_LNCLND | 
        Lincoln Landfill Power Plant | 
        Forced | 
        4.98 | 
        2.08 | 
        
         | 
      
      
        | PNCHPP_1_PL1X2 | 
        Midway Peaking Aggregate | 
        Forced | 
        119.91 | 
        0.00 | 
        
         | 
      
      
        | PNOCHE_1_UNITA1 | 
        CalPeak Power Panoche Unit 1 | 
        Planned | 
        52.01 | 
        4.01 | 
        
         | 
      
      
        | PRIMM_2_SOLAR1 | 
        Silver State South | 
        Planned | 
        250.00 | 
        195.00 | 
        
         | 
      
      
        | RAMON_2_SCEDYN | 
        RAMON_2_SCEDYN | 
        Planned | 
        471.60 | 
        89.60 | 
        
         | 
      
      
        | RICHMN_7_BAYENV | 
        BAY ENVIRONMENTAL (NOVE POWER) | 
        Forced | 
        2.50 | 
        1.09 | 
        
         | 
      
      
        | RUSCTY_2_UNITS | 
        Russell City Energy Center | 
        Forced | 
        620.00 | 
        0.00 | 
        
         | 
      
      
        | SALIRV_2_UNIT | 
        SALINAS RIVER COGEN CO. | 
        Planned/Forced | 
        57.00 | 
        0.00 | 
        
         | 
      
      
        | SANLOB_1_LNDFIL | 
        Cold Canyon | 
        Forced | 
        1.50 | 
        1.50 | 
        
         | 
      
      
        | SANTFG_7_UNITS | 
        GEYSERS CALISTOGA AGGREGATE | 
        Forced | 
        92.10 | 
        34.10 | 
        
         | 
      
      
        | SCEHOV_2_HOOVER | 
        SCEHOV_2_HOOVER | 
        Planned | 
        525.00 | 
        239.00 | 
        
         | 
      
      
        | SCHLTE_1_PL1X3 | 
        Tracy Combined Cycle Power Plant | 
        Forced | 
        332.28 | 
        7.29 | 
        
         | 
      
      
        | SIERRA_1_UNITS | 
        HIGH SIERRA LIMITED | 
        Forced | 
        52.43 | 
        1.13 | 
        
         | 
      
      
        | SKERN_6_SOLAR1 | 
        South Kern Solar PV Plant | 
        Forced | 
        20.00 | 
        6.00 | 
        
         | 
      
      
        | SLUISP_2_UNITS | 
        SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) | 
        Planned/Forced | 
        374.43 | 
        214.43 | 
        
         | 
      
      
        | SMUDGO_7_UNIT 1 | 
        SONOMA POWER PLANT | 
        Forced | 
        53.00 | 
        23.00 | 
        
         | 
      
      
        | SNMALF_6_UNITS | 
        Sonoma County Landfill | 
        Planned | 
        7.50 | 
        4.10 | 
        
         | 
      
      
        | SPIAND_1_ANDSN2 | 
        SPI Anderson 2 | 
        Forced | 
        27.15 | 
        27.15 | 
        
         | 
      
      
        | STOILS_1_UNITS | 
        Chevron Richmond Refinery | 
        Forced | 
        113.90 | 
        0.00 | 
        
         | 
      
      
        | SUNRIS_2_PL1X3 | 
        Sunrise Power Project AGGREGATE II | 
        Forced | 
        586.02 | 
        8.02 | 
        
         | 
      
      
        | SUNSET_2_UNITS | 
        MIDWAY SUNSET COGENERATION PLANT | 
        Forced | 
        248.00 | 
        11.00 | 
        
         | 
      
      
        | SUNSHN_2_LNDFL | 
        Sunshine Gas Producers | 
        Forced | 
        20.00 | 
        2.00 | 
        
         | 
      
      
        | SUTTER_2_PL1X3 | 
        SUTTER POWER PLANT AGGREGATE | 
        Planned | 
        525.00 | 
        525.00 | 
        
         | 
      
      
        | SWIFT_1_NAS | 
        YERBA BUENA BATTERY | 
        Forced | 
        4.80 | 
        4.80 | 
        
         | 
      
      
        | THMENG_1_UNIT 1 | 
        Tracy Biomass | 
        Forced | 
        18.50 | 
        18.50 | 
        
         | 
      
      
        | TUPMAN_1_BIOGAS | 
        ABEC Bidart-Stockale #1 | 
        Forced | 
        0.60 | 
        0.60 | 
        
         | 
      
      
        | TXMCKT_6_UNIT | 
        McKittrick Cogen | 
        Forced | 
        11.20 | 
        2.10 | 
        
         | 
      
      
        | USWND1_2_UNITS | 
        US WIND POWER#1(WALKER) | 
        Forced | 
        38.90 | 
        38.90 | 
        
         | 
      
      
        | USWND2_1_UNITS | 
        US WIND POWER#2(PATTERSON) | 
        Forced | 
        138.50 | 
        138.50 | 
        
         | 
      
      
        | USWNDR_2_SMUD | 
        SOLANO WIND FARM | 
        Forced | 
        102.18 | 
        4.32 | 
        
         | 
      
      
        | USWNDR_2_SMUD2 | 
        Solano Wind Project Phase 3 | 
        Forced | 
        127.80 | 
        0.00 | 
        
         | 
      
      
        | USWPJR_2_UNITS | 
        Vasco Wind | 
        Forced | 
        78.20 | 
        0.00 | 
        
         | 
      
      
        | VACADX_1_UNITA1 | 
        CalPeak Power Vaca Dixon Unit 1 | 
        Planned | 
        50.61 | 
        2.61 | 
        
         | 
      
      
        | VLYHOM_7_SSJID | 
        Woodward Power Plant | 
        Forced | 
        3.00 | 
        0.00 | 
        
         | 
      
      
        | WDFRDF_2_UNITS | 
        WEST FORD FLAT AGGREGATE | 
        Forced | 
        32.60 | 
        32.60 | 
        
         | 
      
      
        | WHEATL_6_LNDFIL | 
        G2 ENERGY, OSTROM ROAD LLC | 
        Forced | 
        3.00 | 
        1.50 | 
        
         | 
      
      
        | WISE_1_UNIT 1 | 
        Wise Hydro Unit 1 | 
        Planned | 
        14.50 | 
        14.50 | 
        
         | 
      
      
        | WNDMAS_2_UNIT 1 | 
        BUENA VISTA ENERGY, LLC | 
        Forced | 
        38.00 | 
        0.00 | 
        
         | 
      
      
        | ZOND_6_UNIT | 
        ZOND WINDSYSTEMS INC. | 
        Forced | 
        17.10 | 
        17.10 | 
        
         |