Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALAMIT_7_UNIT 1 ALAMITOS GEN STA. UNIT 1 Forced 174.56 44.56 SCE Gen
ALAMIT_7_UNIT 2 ALAMITOS GEN STA. UNIT 2 Planned 175.00 175.00 SCE Gen
ALTA3A_2_CPCE8 CPC East - Alta Wind 8 Planned 150.00 0.00 SCE Gen
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Planned 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 0.00 SCE Gen
ALTWD_1_QF Altwind Forced 47.00 0.00 SCE Gen
ANAHM_2_CANYN1 CANYON POWER PLANT UNIT 1 Forced 49.40 0.00 SCE Gen
ANAHM_2_CANYN2 CANYON POWER PLANT UNIT 2 Forced 49.40 0.00 SCE Gen
ANAHM_2_CANYN3 CANYON POWER PLANT UNIT 3 Forced 49.40 0.00 SCE Gen
ANAHM_2_CANYN4 CANYON POWER PLANT UNIT 4 Forced 49.40 0.00 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 0.00 SCE Gen
ARBWD_6_QF Wind Resource II Forced 19.95 0.72 SCE Gen
AVSOLR_2_SOLAR AV SOLAR RANCH 1 Planned 241.50 30.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 392.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 4.90 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 2.80 SCE Gen
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00 SCE Gen
BLKCRK_2_SOLAR1 McCoy Station Planned 250.00 19.00 SCE Gen
BLM_2_UNITS BLM EAST Facility Forced 72.00 0.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BREGGO_6_DEGRSL Desert Green Solar Farm Forced 6.30 0.00 SDGE Gen
BRODIE_2_WIND Coram Brodie Wind Project Planned 102.00 0.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Planned/Forced 122.00 61.00 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned 24.00 24.00 PGAE North
CATLNA_2_SOLAR Catalina Solar - Phases 1 and 2 Planned 110.00 0.00 SCE Gen
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Forced 5.25 5.25 SDGE Gen
CENTER_2_QF CENTER QFS Forced 31.00 31.00 SCE Gen
CHINO_2_JURUPA Jurupa Forced 1.50 0.00 SCE Gen
CHINO_2_SASOLR SS San Antonio West LLC Forced 1.50 0.00 SCE Gen
CHINO_2_SOLAR Chino RT Solar 1 Forced 1.00 0.00 SCE Gen
CHINO_2_SOLAR2 Kona Solar - Terra Francesca Forced 1.49 0.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
COLGAT_7_UNIT 1 COLGATE HYDRO UNIT 1 Forced 176.72 41.72 PGAE North
COLGAT_7_UNIT 2 COLGATE HYDRO UNIT 2 Forced 175.67 15.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Planned 43.00 43.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 20.60 PGAE North
CONTRL_1_LUNDY LUNDY Planned 3.00 3.00 SCE Gen
CORONS_2_SOLAR Master Development Corona Forced 0.99 0.00 SCE Gen
CPSTNO_7_PRMADS PRIMA DESCHECHA (CAPISTRANO) Planned 6.10 3.20 SDGE Gen
CROKET_7_UNIT CROCKETT COGEN Planned/Forced 240.00 240.00 PGAE North
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 0.00 SDGE Gen
CSLR4S_2_SOLAR Csolar IV South Planned 130.00 29.81 SDGE Gen
DEERCR_6_UNIT 1 DEER CREEK Planned 7.00 7.00 PGAE North
DEVERS_1_SOLAR Cascade Solar Forced 18.50 0.00 SCE Gen
DEVERS_1_SOLAR1 SEPV8 Forced 12.00 0.00 SCE Gen
DEVERS_1_SOLAR2 SEPV9 Forced 9.00 0.00 SCE Gen
DSRTSL_2_SOLAR1 Desert Stateline Planned/Forced 299.99 75.99 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned 250.00 50.00 SCE Gen
DUTCH2_7_UNIT 1 DUTCH FLAT 2 PH Planned 26.00 0.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 0.00 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Planned 200.00 200.00 SCE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 0.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Planned 263.68 263.68 SCE Gen
ENCINA_7_EA5 ENCINA UNIT 5 Planned 330.00 330.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_CHMPNE Champagne Forced 1.00 0.00 SCE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 2.06 SCE Gen
ETIWND_2_RTS010 SPVP010 Fontana RT Solar Forced 1.50 0.00 SCE Gen
ETIWND_2_RTS015 SPVP015 Forced 3.00 0.00 SCE Gen
ETIWND_2_RTS018 SPVP018 Fontana RT Solar Forced 1.50 0.00 SCE Gen
ETIWND_2_RTS023 SPVP023 Fontana RT Solar Forced 2.50 0.00 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned 24.00 24.00 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 0.30 SCE Gen
FAIRHV_6_UNIT FAIRHAVEN POWER CO. Planned 19.90 19.90 PGAE North
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 1.50 SCE Gen
GARNET_2_WIND1 Phoenix Forced 11.20 11.20 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Forced 11.70 3.45 SCE Gen
GARNET_2_WIND3 San Gorgonio East Forced 12.60 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_ELLWOD ELLWOOD ENERGY SUPPORT FACILITY Forced 54.00 54.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE Forced 49.20 0.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned/Forced 144.00 0.00 PGAE North
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 95.00 SCE Gen
HINSON_6_CARBGN BP WILMINGTON CALCINER Forced 30.00 30.00 SCE Gen
HINSON_6_SERRGN CITY OF LONG BEACH Planned 38.91 38.91 SCE Gen
HNTGBH_7_UNIT 1 HUNTINGTON BEACH GEN STA. UNIT 1 Planned 225.75 225.75 SCE Gen
HNTGBH_7_UNIT 2 HUNTINGTON BEACH GEN STA. UNIT 2 Planned 225.80 225.80 SCE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Planned 65.08 0.00 PGAE North
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Planned 44.00 0.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 90.00 SCE Gen
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 13.20 SCE Gen
LAKHDG_6_UNIT 1 Lake Hodges Pumped Storage-Unit1 Planned 20.00 0.00 SDGE Gen
LAKHDG_6_UNIT 2 Lake Hodges Pumped Storage-Unit2 Planned 20.15 0.00 SDGE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 0.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 2.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Forced 180.00 15.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 7.00 SDGE Gen
LASSEN_6_UNITS LASSEN AREA QF AGGREGATION Planned 32.00 32.00 PGAE North
LEBECS_2_UNITS Pastoria Energy Facility Forced 799.47 49.47 SCE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 0.00 SCE Gen
MIRLOM_2_ONTARO Ontario RT Solar Forced 5.50 0.00 SCE Gen
MNDALY_6_MCGRTH McGrath Beach Peaker Planned 47.20 0.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOORPK_7_UNITA1 WEME- Simi Valley Landfill Planned 2.49 0.49 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 14.58 SCE Gen
MRGT_6_MMAREF Miramar Energy Facility Planned 48.00 0.00 SDGE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned 44.40 0.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned 22.20 0.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 0.00 SCE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Planned 57.00 57.00 SDGE Gen
NZWIND_6_WDSTR4 Windstream 6042 Forced 6.77 1.04 SCE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 3.00 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 1.51 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Planned/Forced 81.41 3.51 SCE Gen
OMAR_2_UNIT 4 KERN RIVER COGENERATION CO. UNIT 4 Planned 81.44 0.00 SCE Gen
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Planned 775.00 775.00 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 9.68 SDGE Gen
OXBOW_6_DRUM OXBOW HYDRO Planned 6.00 6.00 PGAE North
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 10.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.22 SCE Gen
PANDOL_6_UNIT Covanta Delano, Inc. Planned 49.00 49.00 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.61 SCE Gen
PIT1_7_UNIT 1 PIT PH 1 UNIT 1 Planned 32.00 0.00 PGAE North
PIT1_7_UNIT 2 PIT PH 1 UNIT 2 Planned 32.00 0.00 PGAE North
PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE Planned 95.00 47.00 PGAE North
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Planned 82.00 82.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Planned 68.50 68.50 PGAE North
POTTER_6_UNITS Potter Valley Planned 10.10 10.10 PGAE North
PRIMM_2_SOLAR1 Silver State South Planned 250.00 88.00 SCE Gen
PTLOMA_6_NTCQF NTC/MCRD COGENERATION Planned 22.30 22.30 SDGE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Planned 414.40 102.40 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Planned 6.55 0.00 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned 2.25 0.00 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Planned 505.96 505.96 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
ROLLIN_6_UNIT ROLLINS HYDRO Planned 13.50 0.00 PGAE North
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 8.00 SDGE Gen
SANTGO_6_COYOTE GAS RECOVERY SYS. (COYOTE CANYON) Forced 9.99 9.99 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 0.00 SCE Gen
SAUGUS_7_LOPEZ MM Lopez Energy Planned 6.10 3.60 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Planned 525.00 525.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Planned/Forced 525.00 0.00 SCE Gen
SBERDO_2_REDLND Redlands RT Solar Forced 2.00 0.00 SCE Gen
SBERDO_2_RTS005 SPVP005 Redlands RT Solar Forced 2.50 0.00 SCE Gen
SBERDO_2_RTS007 SPVP007 Redlands RT Solar Forced 2.50 0.00 SCE Gen
SBERDO_2_RTS048 SPVP048 Forced 5.00 0.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.45 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.63 SCE Gen
SENTNL_2_CTG5 Sentinel Unit 5 Forced 91.83 91.83 SCE Gen
SLSTR1_2_SOLAR1 Solar Star 1 Forced 310.00 144.00 SCE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 3.00 PGAE North
SNCLRA_2_HOWLNG Houwelings Nurseries Oxnard, Inc Forced 13.00 0.00 SCE Gen
SNCLRA_6_PROCGN PROCTER AND GAMBLE OXNARD II Forced 49.50 49.50 SCE Gen
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Planned 11.40 11.40 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Planned 6.40 0.00 SCE Gen
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 3.91 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned/Forced 85.00 5.91 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned/Forced 85.00 3.30 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 5.29 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 8.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 0.00 SCE Gen
TOADTW_6_UNIT TOAD TOWN Planned 1.50 1.50 PGAE North
TRNSWD_1_QF FPL Energy C Wind Forced 38.97 38.97 SCE Gen
VALLEY_5_RTS044 SPVP044 Forced 8.00 0.00 SCE Gen
VALLEY_5_SOLAR1 Kona Solar - Meridian #1 Forced 1.49 0.00 SCE Gen
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.30 SCE Gen
VALLEY_7_UNITA1 WM Energy, El Sobrante Landfill Forced 3.74 1.84 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Planned 5.75 5.75 SCE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Planned 5.75 5.75 SCE Gen
VESTAL_2_RTS042 SPVP042 Porterville Solar Forced 5.00 0.00 SCE Gen
VICTOR_1_EXSLRA Expressway Solar A Forced 2.00 0.00 SCE Gen
VICTOR_1_EXSLRB Expressway Solar B Forced 2.00 0.00 SCE Gen
VICTOR_1_LVSLR2 Lone Valley Solar Park 2 Forced 20.00 0.00 SCE Gen
VICTOR_1_SLRHES Sunedison - Hesperia Forced 1.50 0.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 4.00 SCE Gen
VISTA_2_FCELL CSUSB fuel cell Forced 1.40 0.00 SCE Gen
VISTA_2_RIALTO Rialto RT Solar Forced 1.00 0.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned/Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 21.50 SCE Gen
WNDSTR_2_WIND Windstar Planned/Forced 120.00 4.00 SCE Gen
YUBACT_1_SUNSWT YUBA CITY COGEN Planned 49.97 49.97 PGAE North
7STDRD_1_SOLAR1 Shafter Solar Forced 20.00 2.00
ADERA_1_SOLAR1 Adera Solar Forced 20.00 0.00
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Planned 22.00 7.00
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Planned 33.00 33.00
BALCHS_7_UNIT 2 BALCH 2 PH UNIT 2 Planned 52.50 52.50
BALCHS_7_UNIT 3 BALCH 2 PH UNIT 3 Planned 54.60 54.60
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 128.00
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 47.49 3.49
BEARMT_1_UNIT Bear Mountain Limited Forced 47.49 1.49
BELDEN_7_UNIT 1 BELDEN HYDRO Planned/Forced 119.00 119.00
BLCKBT_2_STONEY BLACK BUTTE HYDRO Planned/Forced 6.20 6.20
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 19.80
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 1.50
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 0.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 2.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00
BUCKCK_7_OAKFLT Oak Flat Forced 1.30 1.30
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Forced 59.00 59.00
BURNYF_2_UNIT 1 Burney Forest Power Planned/Forced 35.70 35.70
CAPWD_1_QF Edom Hills Wind Farm Planned 19.55 0.00
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 1.40
CAVLSR_2_BSOLAR California Valley Solar Ranch-Phase B Forced 40.00 40.00
CENTER_2_SOLAR1 Pico Rivera Forced 0.90 0.00
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 47.49 1.59
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned/Forced 10.80 10.80
CLOVER_2_UNIT MEGA HYDRO #1 (CLOVER CREEK) Forced 1.50 1.50
CLRKRD_6_LIMESD Lime Saddle Hydro Planned 2.00 2.00
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 3.63
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 2.98
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 9.67
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 3.13
COGNAT_1_UNIT Stockton Biomas Forced 48.00 7.00
COLPIN_6_COLLNS COLLINS PINE Forced 13.80 13.80
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 2.53
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DELSUR_6_CREST Delsur Aggregate Solar Resources Forced 8.50 0.00
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 43.00
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 12.00
DONNLS_7_UNIT Donnells Hydro Forced 72.00 1.50
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 1.23
DRACKR_2_SOLAR1 Dracker Solar Unit 1 Planned/Forced 110.00 34.34
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Planned/Forced 4.90 4.90
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 44.70
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 0.30
ELNIDS_2_DODPEV Los Angeles Air Force Base Forced 0.50 0.40
ETIWND_2_RTS017 SPVP017 Forced 3.50 0.00
ETIWND_2_RTS026 SPVP026 Forced 6.00 0.00
ETIWND_2_RTS027 SPVP027 Forced 2.00 0.00
ETIWND_2_SOLAR1 Dedeaux Ontario Forced 1.00 0.00
ETIWND_2_SOLAR2 Rochester Forced 1.00 0.00
ETIWND_2_SOLAR4 Philadelphia Avenue Forced 0.50 0.00
ETIWND_2_UNIT1 New-Indy Ontario, LLC Forced 33.60 25.60
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Planned 94.50 94.50
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.60 0.00
FRESHW_1_SOLAR1 Freshwater Solar Planned/Forced 20.00 0.00
GARNET_2_WIND5 Eastwind Planned 3.00 0.00
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Planned 562.50 562.50
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 6.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 3.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Planned 95.00 7.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 9.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 85.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Planned 60.00 0.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 72.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 62.00
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 120.00
GILRPP_1_PL1X2 GILROY ENERGY CENTER UNITS 1&2 AGGREGATE Planned 95.40 0.00
GILRPP_1_PL3X4 GILROY ENERGY CENTER, UNIT #3 Planned 46.20 0.00
GONZLS_6_UNIT Johnson Canyon Landfill Forced 1.42 1.42
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 320.00
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Planned 3.04 0.00
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 1.77
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 0.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Planned 82.00 4.00
GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro Forced 3.75 2.57
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 5.40
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.96
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 1.50
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 335.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 28.00
INTMNT_3_PASADENA Intermountain Power Project Forced 107.00 54.00
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 70.00
JAKVAL_6_UNITG1 BUENA VISTA Forced 17.84 0.00
KELSO_2_UNITS Mariposa Energy Planned/Forced 196.00 0.00
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.20
KRNCNY_6_UNIT KERN CANYON Planned 11.50 1.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 7.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 8.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 7.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Planned 259.54 259.54
LASSEN_6_AGV1 AGV 1 Planned 1.80 1.80
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 294.00 6.30
LITLRK_6_SOLAR4 Little Rock Pham Solar Forced 3.00 0.00
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 47.49 2.99
LMBEPK_2_UNITA3 Goose Haven Energy Center, Unit #1 Planned 48.00 48.00
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned/Forced 561.29 306.29
LNCSTR_6_CREST Lanacaster Aggregate Solar Resources Forced 5.50 0.00
LODI25_2_UNIT 1 LODI GAS TURBINE Planned 25.30 25.30
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 11.68
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 3.99
MERCFL_6_UNIT MERCED FALLS Forced 3.50 3.50
MIDSET_1_UNIT 1 MIDSET COGEN. CO. Planned 52.90 0.00
MIRLOM_2_RTS032 SPVP032 Forced 1.50 0.00
MIRLOM_2_RTS033 SPVP033 Forced 1.00 0.00
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 2.49
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Planned 510.00 510.00
MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 Forced 755.00 15.00
MRLSDS_6_SOLAR1 Morelos Solar Forced 15.00 2.50
MSTANG_2_SOLAR3 Mustang 3 Planned 40.00 40.00
MSTANG_2_SOLAR4 Mustang 4 Planned 30.00 30.00
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 46.64
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
NCPA_7_GP2UN4 NCPA GEO PLANT 2 UNIT 4 Planned 52.73 52.73
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 0.00
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 0.00
OASIS_6_CREST CREST Contracts Forced 13.50 0.00
OASIS_6_SOLAR1 Morgan Lancaster I Forced 1.50 0.00
OLDRIV_6_BIOGAS Bidart Old River 1 Forced 2.00 1.01
OROVIL_6_UNIT Oroville Cogeneration, LP Planned 7.50 7.50
PADUA_2_SOLAR1 Kona Solar - Rancho DC #1 Forced 1.75 0.00
PEABDY_2_LNDFL1 Potrero Hills Energy Producers Forced 8.00 0.00
PEARBL_2_NSPIN PEARBL_2_NSPIN Forced 151.20 151.20
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 138.00
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
PLSNTG_7_LNCLND Lincoln Landfill Power Plant Forced 4.98 2.48
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.15
PNOCHE_1_PL1X2 Panoche Peaker Planned 49.97 0.00
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01
RDWAY_1_CREST CREST Contracts Forced 7.00 0.00
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.00
RUSCTY_2_UNITS Russell City Energy Center Forced 620.00 0.00
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 25.10
SBERDO_2_RTS011 SPVP011 Forced 3.50 0.00
SBERDO_2_RTS013 SPVP013 Forced 3.50 0.00
SBERDO_2_RTS016 SPVP016 Redlands RT Solar Forced 1.50 0.00
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 182.00
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 8.52
SHUTLE_6_CREST CREST Contracts Forced 4.00 0.00
SIERRA_1_UNITS HIGH SIERRA LIMITED Planned 52.43 52.43
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 134.43
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 21.00
SNMALF_6_UNITS Sonoma County Landfill Planned 7.50 3.50
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 19.02
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 11.00
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
TRNQLT_2_SOLAR Tranquillity Planned 200.00 200.00
TUPMAN_1_BIOGAS ABEC Bidart-Stockale #1 Forced 0.60 0.60
USWND2_1_WIND1 Golden Hills A Forced 42.96 3.86
USWND2_1_WIND2 Golden Hills B Forced 42.96 7.26
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 3.00
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
USWPJR_2_UNITS Vasco Wind Forced 78.20 2.30
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61
VICTOR_1_CREST Victor Aggregate Solar Resources Forced 24.49 0.00
VISTA_2_RTS028 SPVP028 Forced 3.50 0.00
WDFRDF_2_UNITS WEST FORD FLAT AGGREGATE Forced 32.60 32.60
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 1.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 21 12 764.96 565.17
SCE Gen 72 96 4786.63 3467.59
SDGE Gen 11 15 501.61 414.55
63 170 5780.40 3500.78
Total 167 293 11833.60 7948.09


Report Generated on:
03/28/2016 15:15:03 (PPT)
Filtered Parameters:
Date = 03/28/2016
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO
Configurable Parameters:
Time = 3:15PM PPT

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.