Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
AGUCAL_5_SOLAR1 Agua Caliente Solar Planned 290.00 290.00 SDGE Gen
ALAMIT_7_UNIT 2 ALAMITOS GEN STA. UNIT 2 Planned 175.00 175.00 SCE Gen
ALAMO_6_UNIT ALAMO POWER PLANT Forced 17.00 17.00 SCE Gen
ALHMBR_1_ALHSLR SG Alhambra Forced 50.00 0.00 SDGE Gen
ALTA3A_2_CPCE8 CPC East - Alta Wind 8 Planned 150.00 0.00 SCE Gen
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Planned 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 0.00 SCE Gen
ALTWD_1_QF Altwind Planned 47.00 0.00 SCE Gen
ANAHM_2_CANYN1 CANYON POWER PLANT UNIT 1 Forced 49.40 0.00 SCE Gen
ANAHM_2_CANYN2 CANYON POWER PLANT UNIT 2 Forced 49.40 0.00 SCE Gen
ANAHM_2_CANYN3 CANYON POWER PLANT UNIT 3 Forced 49.40 0.00 SCE Gen
ANAHM_2_CANYN4 CANYON POWER PLANT UNIT 4 Forced 49.40 0.00 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 0.00 SCE Gen
ARBWD_6_QF Wind Resource II Forced 19.95 0.72 SCE Gen
AVSOLR_2_SOLAR AV SOLAR RANCH 1 Planned 241.50 35.10 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 415.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 8.40 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 10.80 SCE Gen
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00 SCE Gen
BLKCRK_2_SOLAR1 McCoy Station Planned/Forced 250.00 11.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 51.25 SDGE Gen
BRDWAY_7_UNIT 3 BROADWAY UNIT 3 Forced 65.00 65.00 SCE Gen
BRODIE_2_WIND Coram Brodie Wind Project Planned/Forced 102.00 24.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Planned/Forced 122.00 61.00 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned 24.00 24.00 PGAE North
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Planned 5.25 5.25 SDGE Gen
CENTER_2_QF CENTER QFS Forced 31.00 31.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
COLGAT_7_UNIT 1 COLGATE HYDRO UNIT 1 Forced 176.72 11.72 PGAE North
COLGAT_7_UNIT 2 COLGATE HYDRO UNIT 2 Forced 175.67 10.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 33.90 PGAE North
CROKET_7_UNIT CROCKETT COGEN Planned 240.00 240.00 PGAE North
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 3.00 SDGE Gen
CSLR4S_2_SOLAR Csolar IV South Forced 130.00 25.84 SDGE Gen
DSABLA_7_UNIT De Sabla Hydro Planned 18.50 18.50 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Planned 299.99 112.99 SCE Gen
DSRTSN_2_SOLAR1 Desert Sunlight 300 Planned 300.00 300.00 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned 250.00 250.00 SCE Gen
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Planned 22.00 0.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 0.00 SCE Gen
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Planned 101.50 0.00 PGAE North
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 0.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 0.00 SCE Gen
ENCINA_7_EA5 ENCINA UNIT 5 Planned 330.00 330.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 1.96 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned 24.00 24.00 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 0.30 SCE Gen
FAIRHV_6_UNIT FAIRHAVEN POWER CO. Planned/Forced 19.90 19.90 PGAE North
FMEADO_6_HELLHL FMEADO_6_HELLHL Planned 0.60 0.60 PGAE North
GARNET_1_SOLAR2 Garnet Solar Power Generation Station 1 Forced 4.00 0.50 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_WIND1 Phoenix Forced 11.20 11.20 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Forced 11.70 4.50 SCE Gen
GARNET_2_WIND3 San Gorgonio East Planned 12.60 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE Planned 49.20 49.20 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 72.00 PGAE North
HARBGN_7_UNITS HARBOR COGEN COMBINED CYCLE Planned 109.01 109.01 SCE Gen
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 118.00 SCE Gen
HINSON_6_CARBGN BP WILMINGTON CALCINER Forced 30.00 30.00 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 16.27 PGAE North
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 9.44 SCE Gen
IVANPA_1_UNIT2 Ivanpah 2 Forced 133.00 133.00 SCE Gen
IVWEST_2_SOLAR1 Imperial Valley West ( Q # 608) Forced 150.00 150.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 6.40 SCE Gen
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 5.89 SCE Gen
KNGBRD_2_SOLAR1 Kingbird Solar A Planned 20.00 0.00 SCE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 0.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 2.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Forced 180.00 15.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 7.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Forced 799.47 30.47 SCE Gen
MANZNA_2_WIND Manzana Wind Planned/Forced 189.00 0.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Forced 11.00 11.00 SCE Gen
MOORPK_6_QF MOORPARK QFS Forced 34.80 0.00 SCE Gen
MOORPK_7_UNITA1 WEME- Simi Valley Landfill Planned 2.49 1.09 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Planned 494.58 494.58 SCE Gen
MSOLAR_2_SOLAR1 Mesquite Solar 1 Forced 165.00 0.00 SCE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 0.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 0.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 0.00 SCE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 3.00 SDGE Gen
NZWIND_6_WDSTR4 Windstream 6042 Forced 6.77 1.04 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 3.51 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 5.51 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Planned 603.68 603.68 SDGE Gen
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 13.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.42 SCE Gen
PANDOL_6_UNIT Covanta Delano, Inc. Planned 49.00 49.00 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned/Forced 30.00 22.39 SCE Gen
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Forced 82.00 41.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Planned 55.70 55.70 PGAE North
PLAINV_6_SOLARC Central Antelope Dry Ranch C Planned/Forced 20.00 1.00 SCE Gen
POTTER_6_UNITS Potter Valley Planned 10.10 10.10 PGAE North
PRIMM_2_SOLAR1 Silver State South Planned 250.00 60.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Planned 359.60 93.60 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 4.00 SCE Gen
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Planned 46.00 46.00 PGAE North
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 1.70 SCE Gen
SAUGUS_6_PTCHGN COUNTY OF LOS ANGELES -- PITCHLE Planned 29.80 29.80 SCE Gen
SAUGUS_7_CHIQCN Chiquita Canyon Landfill Fac Forced 8.00 8.00 SCE Gen
SAUGUS_7_LOPEZ MM Lopez Energy Planned 6.10 3.60 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Planned 525.00 525.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Planned 525.00 525.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 5.45 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 0.00 SCE Gen
SNORA_2_SNRSLR SG Sorrento Forced 50.00 0.00 SDGE Gen
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Planned 11.40 11.40 PGAE North
STNRES_1_UNIT Covanta Stanislaus Planned 19.90 19.90 PGAE North
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned/Forced 85.00 8.10 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 85.00 10.60 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 85.00 8.83 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 85.00 10.02 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 14.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 2.00 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Planned 62.00 62.00 PGAE North
TOADTW_6_UNIT TOAD TOWN Planned 1.50 1.50 PGAE North
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.30 SCE Gen
VALLEY_7_UNITA1 WM Energy, El Sobrante Landfill Forced 3.74 1.99 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Planned 5.75 5.75 SCE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Planned 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Planned 36.80 0.00 SCE Gen
VICTOR_1_LVSLR2 Lone Valley Solar Park 2 Forced 20.00 2.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 7.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SCE Gen
WALNUT_6_HILLGEN L.A. COUNTY SANITATION DISTRICT Forced 53.22 53.22 SCE Gen
WALNUT_7_WCOVST WALNUT_7_WCOVST Planned 6.50 6.50 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 16.50 SCE Gen
WNDSTR_2_WIND Windstar Planned 120.00 0.00 SCE Gen
7STDRD_1_SOLAR1 Shafter Solar Forced 20.00 2.00
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Planned 22.00 7.00
AGRICO_7_UNIT Fresno Cogen Planned 50.60 50.60
BALCHS_7_UNIT 3 BALCH 2 PH UNIT 3 Planned 54.60 54.60
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 148.00
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 47.49 3.49
BEARMT_1_UNIT Bear Mountain Limited Forced 47.49 1.49
BELDEN_7_UNIT 1 BELDEN HYDRO Planned/Forced 119.00 119.00
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 12.60
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 6.00
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 0.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 4.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 1.60
BUCKCK_7_OAKFLT Oak Flat Planned/Forced 1.30 1.30
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Planned/Forced 59.00 10.00
CALPIN_1_AGNEW Agnews Power Plant Planned 28.00 28.00
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 1.40
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 47.49 2.59
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned 10.80 1.30
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COCOPP_2_CTG1 Marsh Landing 1 Planned/Forced 204.20 6.67
COCOPP_2_CTG2 Marsh Landing 2 Planned/Forced 202.70 6.00
COCOPP_2_CTG3 Marsh Landing 3 Planned/Forced 208.96 12.68
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 6.17
COLPIN_6_COLLNS COLLINS PINE Forced 13.80 13.80
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned/Forced 4.53 3.53
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 41.00
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 12.00
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 2.13
DRACKR_2_SOLAR1 Dracker Solar Unit 1 Planned/Forced 110.00 22.22
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Planned 147.80 147.80
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned/Forced 551.70 20.70
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 0.10
ELNIDS_2_DODPEV Los Angeles Air Force Base Forced 0.50 0.40
ETIWND_2_UNIT1 New-Indy Ontario, LLC Forced 33.60 25.60
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Forced 94.50 21.50
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.60 0.00
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Planned 562.50 562.50
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Planned 74.40 4.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Planned/Forced 57.00 57.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Planned 95.00 6.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 5.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 85.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Planned 60.00 0.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 72.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 62.00
GILRPP_1_PL1X2 GILROY ENERGY CENTER UNITS 1&2 AGGREGATE Planned 95.40 95.40
GONZLS_6_UNIT Johnson Canyon Landfill Planned 1.42 0.00
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 320.00
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 3.00
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 2.73
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Planned 85.00 0.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Planned 82.00 3.00
GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro Forced 3.75 2.62
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.80
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Planned 407.00 0.00
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Forced 407.00 0.00
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 2.44
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 1.98
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 343.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 27.00
INTMNT_3_ANAHEIM Intermountain Power Project Forced 236.00 120.00
INTMNT_3_PASADENA Intermountain Power Project Forced 107.00 54.00
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 70.00
JAKVAL_6_UNITG1 BUENA VISTA Forced 17.84 0.00
KELSO_2_UNITS Mariposa Energy Forced 198.03 2.03
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.80
KNGBRD_2_SOLAR2 Kingbird Solar B Planned/Forced 20.00 2.00
KRNCNY_6_UNIT KERN CANYON Planned 11.50 1.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 6.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 260.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 0.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Planned 259.54 259.54
LASSEN_6_AGV1 AGV 1 Planned 1.80 1.80
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 294.00 0.00
LHILLS_6_SOLAR1 Lost Hills Solar Forced 20.00 20.00
LITLRK_6_SOLAR4 Little Rock Pham Solar Forced 3.00 0.00
LIVEOK_6_SOLAR Harris Forced 1.25 0.00
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 47.49 1.99
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 561.29 0.00
LODI25_2_UNIT 1 LODI GAS TURBINE Planned 25.30 25.30
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 17.48
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 3.99
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 30.16
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 2.49
MONLTH_6_BATTRY Tehachapi Storage Project Forced 8.00 0.00
MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 Forced 755.00 15.00
MRLSDS_6_SOLAR1 Morelos Solar Forced 15.00 2.50
MSTANG_2_SOLAR3 Mustang 3 Forced 40.00 0.00
MSTANG_2_SOLAR4 Mustang 4 Planned/Forced 30.00 30.00
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 11.64
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
NCPA_7_GP2UN4 NCPA GEO PLANT 2 UNIT 4 Planned 52.73 52.73
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 0.00
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 0.00
OASIS_6_SOLAR2 Oasis Solar Forced 20.00 1.50
OLDRIV_6_BIOGAS Bidart Old River 1 Forced 2.00 1.01
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Planned 10.62 0.00
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 133.50
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Planned 401.00 95.00
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 3.35
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Planned 635.00 211.00
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.00
RUSCTY_2_UNITS Russell City Energy Center Forced 620.00 0.00
SANLOB_1_LNDFIL Cold Canyon Forced 1.50 1.50
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Planned 92.10 23.10
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 205.00
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 11.93
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 2.33
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 118.43
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 15.00
SNCLRA_2_UNIT1 New Indy Oxnard Forced 27.80 16.80
SNMALF_6_UNITS Sonoma County Landfill Planned 7.50 3.50
SPIAND_1_ANDSN2 SPI Anderson 2 Forced 27.15 27.15
SPICER_1_UNITS SPICER HYDRO UNITS 1-3 AGGREGATE Planned 6.00 2.80
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 20.02
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 18.00
SUNSHN_2_LNDFL Sunshine Gas Producers Forced 20.00 6.00
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
TRNQLT_2_SOLAR Tranquillity Planned 200.00 200.00
TUPMAN_1_BIOGAS ABEC Bidart-Stockale #1 Forced 0.60 0.60
USWND2_1_WIND1 Golden Hills A Planned 42.96 0.00
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.06
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 3.00
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61
WDFRDF_2_UNITS WEST FORD FLAT AGGREGATE Forced 32.60 32.60
WESTPT_2_UNIT West Point Hydro Plant Planned 14.00 14.00
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 18 10 819.16 558.80
SCE Gen 59 74 4000.43 2933.31
SDGE Gen 4 17 1501.14 1430.18
61 136 5354.56 2886.54
Total 142 237 11675.29 7808.83


Report Generated on:
04/20/2016 15:15:04 (PPT)
Filtered Parameters:
Date = 04/20/2016
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO
Configurable Parameters:
Time = 3:15PM PPT

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.