Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Forced 332.18 332.18 SCE Gen
ALAMIT_7_UNIT 5 ALAMITOS GEN STA. UNIT 5 Forced 497.97 497.97 SCE Gen
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Planned 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 0.00 SCE Gen
ALTWD_1_QF Altwind Planned 47.00 0.00 SCE Gen
ARBWD_6_QF Wind Resource II Forced 19.95 0.66 SCE Gen
AVSOLR_2_SOLAR AV SOLAR RANCH 1 Forced 241.50 241.50 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned 820.00 98.00 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Forced 15.80 2.00 SCE Gen
BLKCRK_2_SOLAR1 McCoy Station Planned/Forced 250.00 0.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 3.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 1.50 SCE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Forced 40.00 4.00 PGAE North
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Planned/Forced 122.00 61.00 PGAE North
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Planned 5.25 5.25 SDGE Gen
CENTRY_6_PL1X4 CENTURY GENERATING PLANT (AGGREGATE) Forced 41.40 23.40 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
COLEMN_2_UNIT Coleman Forced 13.00 8.00 PGAE North
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 14.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 13.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Forced 43.00 2.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 45.80 PGAE North
CONTRL_1_CASAD1 Mammoth G1 Forced 10.00 3.80 SCE Gen
CONTRL_1_CASAD3 Mammoth G3 Forced 14.00 6.70 SCE Gen
CORONS_6_CLRWTR Clearwater Power Plant Forced 28.00 28.00 SCE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Forced 70.40 35.20 PGAE North
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Planned/Forced 50.00 3.00 SDGE Gen
CSLR4S_2_SOLAR Csolar IV South Forced 130.00 52.48 SDGE Gen
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Planned/Forced 125.00 125.00 SCE Gen
DSRTSL_2_SOLAR1 Desert Stateline Forced 299.99 50.99 SCE Gen
DSRTSN_2_SOLAR1 Desert Sunlight 300 Planned 300.00 50.00 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned 250.00 40.00 SCE Gen
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 0.00 SCE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 0.00 SDGE Gen
ELNIDS_2_DODPEV Los Angeles Air Force Base Forced 0.50 0.40 SCE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 4.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 4.68 SCE Gen
ENCINA_7_EA3 ENCINA UNIT 3 Forced 110.00 33.00 SDGE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Forced 48.71 0.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 2.31 SCE Gen
ETIWND_2_UNIT1 New-Indy Ontario, LLC Forced 33.60 25.60 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned 24.00 24.00 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 0.30 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 0.00 SCE Gen
GARNET_2_WIND3 San Gorgonio East Planned 12.60 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLOW_6_SOLAR Antelope Power Plant Forced 20.00 1.00 SCE Gen
GOLETA_6_ELLWOD ELLWOOD ENERGY SUPPORT FACILITY Forced 54.00 54.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE Forced 49.20 0.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 0.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 0.00 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 113.00 SCE Gen
HINSON_6_CARBGN BP WILMINGTON CALCINER Forced 30.00 6.00 SCE Gen
HNTGBH_7_UNIT 1 HUNTINGTON BEACH GEN STA. UNIT 1 Planned 225.75 225.75 SCE Gen
HNTGBH_7_UNIT 2 HUNTINGTON BEACH GEN STA. UNIT 2 Planned 225.80 0.00 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 0.00 PGAE North
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 6.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 6.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 5.69 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Forced 376.20 19.20 SCE Gen
INLDEM_5_UNIT 2 Inland Empire Energy Center, Unit 2 Forced 366.32 366.32 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 9.60 SCE Gen
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Forced 153.90 7.90 PGAE North
KNGBRD_2_SOLAR1 Kingbird Solar A Forced 20.00 20.00 SCE Gen
KNGBRD_2_SOLAR2 Kingbird Solar B Forced 20.00 20.00 SCE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 3.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Planned 180.00 180.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 17.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned/Forced 799.47 26.47 SCE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 4.50 SCE Gen
MNDALY_7_UNIT 2 MANDALAY GEN STA. UNIT 2 Forced 215.29 25.29 SCE Gen
MOJAVW_2_SOLAR Mojave West Planned 20.00 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 7.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOORPK_2_CALABS Calabasas Gas-to-Energy Facility Forced 6.96 3.56 SCE Gen
MOORPK_7_UNITA1 WEME- Simi Valley Landfill Planned 2.49 0.49 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 79.58 SCE Gen
MSOLAR_2_SOLAR1 Mesquite Solar 1 Planned/Forced 165.00 0.00 SCE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 0.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 0.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 1.32 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 26.00 PGAE North
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 6.00 SDGE Gen
NZWIND_6_WDSTR4 Windstream 6042 Forced 6.77 1.04 SCE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 7.00 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 6.51 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 8.61 SCE Gen
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Forced 775.00 775.00 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Planned/Forced 603.68 39.68 SDGE Gen
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 10.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.32 SCE Gen
PALOMR_2_PL1X3 Palomar Energy Center Planned 575.00 0.00 SDGE Gen
PANDOL_6_UNIT Covanta Delano, Inc. Planned 49.00 49.00 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.61 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.61 SDGE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Planned 102.67 102.67 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Planned 102.67 102.67 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Planned 102.67 102.67 SDGE Gen
PIT5_7_PL1X2 PIT PH 5 UNITS 1 & 2 AGGREGATE Planned 82.00 0.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 3.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 3.00 PGAE North
PMPJCK_1_SOLAR1 Pumpjack Solar I Planned 19.48 19.48 SCE Gen
POTTER_6_UNITS Potter Valley Planned 10.10 10.10 PGAE North
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Forced 635.00 25.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 0.00 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Planned 359.60 192.60 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Forced 505.96 0.00 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Forced 495.90 0.00 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 12.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 12.00 SDGE Gen
RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 Forced 49.00 49.00 SCE Gen
RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 Forced 49.00 49.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Forced 48.35 48.35 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Forced 48.50 48.50 SCE Gen
RVSIDE_6_SPRING SPRINGS GENERATION PROJECT AGGREGATE Forced 36.00 36.00 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 1.96 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SAUGUS_7_LOPEZ MM Lopez Energy Planned 6.10 3.80 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 525.00 1.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 525.00 1.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 3.23 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 106.00 SCE Gen
SENTNL_2_CTG8 Sentinel Unit 8 Planned 91.56 0.00 SCE Gen
SLSTR1_2_SOLAR1 Solar Star 1 Forced 310.00 310.00 SCE Gen
SLSTR2_2_SOLAR2 Solar Star 2 Forced 276.00 72.00 SCE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Planned 6.50 6.50 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Planned 11.40 11.40 PGAE North
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 9.63 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 10.32 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned 85.00 8.00 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 9.74 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 28.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 1.00 SCE Gen
TRNSWD_1_QF FPL Energy C Wind Forced 38.97 34.47 SCE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 0.00 PGAE North
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.50 SCE Gen
VALLEY_7_UNITA1 WM Energy, El Sobrante Landfill Planned 3.74 2.09 SCE Gen
VENWD_1_WIND1 Windpark Unlimited 1 Forced 9.43 2.19 SCE Gen
VENWD_1_WIND2 Windpark Unlimited 2 Forced 16.05 2.73 SCE Gen
VENWD_1_WIND3 Painted Hills Windpark Forced 19.04 1.39 SCE Gen
VICTOR_1_LVSLR2 Lone Valley Solar Park 2 Forced 20.00 2.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 12.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 21.50 SCE Gen
WNDSTR_2_WIND Windstar Forced 120.00 2.00 SCE Gen
WSENGY_1_UNIT 1 WHEELABRATOR SHASTA UNITS 1-3 AGGREGATE Forced 63.00 63.00 PGAE North
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Planned 22.00 8.00
ASTORA_2_SOLAR1 Astoria 1 Forced 98.85 0.00
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 128.00
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 47.49 4.99
BEARMT_1_UNIT Bear Mountain Limited Forced 47.49 2.49
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 5.00
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00
BLCKBT_2_STONEY BLACK BUTTE HYDRO Forced 6.20 0.00
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BOWMN_6_UNIT BOWMAN Planned 6.25 6.25
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 19.80
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 1.50
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 4.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 6.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 1.60
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Forced 59.00 15.00
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 1.40
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 47.49 3.59
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned/Forced 10.80 10.80
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 13.99
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 12.61
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 19.67
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 13.33
COLGA1_6_SHELLW COALINGA COGENERATION COMPANY Forced 52.90 52.90
CORRAL_6_SJOAQN Ameresco San Joaquin Planned 4.30 0.00
COWCRK_2_UNIT Cow Creek Hydro Forced 2.00 2.00
CRWCKS_1_SOLAR1 Crow Creek Solar 1 Forced 20.00 0.00
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 2.53
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 625.00
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 12.00
DONNLS_7_UNIT Donnells Hydro Forced 72.00 6.50
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 2.23
DRACKR_2_SOLAR1 Dracker Solar Unit 1 Planned/Forced 110.00 80.00
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 25.80
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 44.70
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 0.00
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Planned 94.50 0.00
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.60 0.00
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30
FRIANT_6_UNITS FRIANT DAM Forced 25.00 20.00
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 562.50 27.70
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Planned 74.40 6.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 5.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Planned 95.00 31.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 13.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 37.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Planned 60.00 0.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 31.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 62.00
GIFFEN_6_SOLAR Giffen Solar Station Planned 10.00 0.00
GILROY_1_UNIT GILROY COGEN AGGREGATE Forced 120.00 10.00
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Forced 3.04 1.04
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 6.33
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Planned 85.00 0.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Planned 82.00 5.00
GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro Forced 3.75 2.47
HALSEY_6_UNIT HALSEY HYDRO Forced 13.50 13.50
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 5.40
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 4.22
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 3.76
HENRTS_1_SOLAR Henrietta Solar Project Planned/Forced 100.00 100.00
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 269.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 31.00
JAKVAL_6_UNITG1 BUENA VISTA Forced 17.84 0.00
KELSO_2_UNITS Mariposa Energy Forced 198.03 1.46
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 2.40
KERNRG_1_UNITS South Belridge Cogen Facility Forced 55.20 33.20
KRNCNY_6_UNIT KERN CANYON Planned 11.50 1.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 9.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 4.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 4.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 19.54
LASSEN_6_AGV1 AGV 1 Planned 1.80 1.80
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 301.98 7.68
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 47.49 4.99
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 561.29 38.29
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 26.98
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 3.99
MENBIO_6_RENEW1 CalRENEW - 1(A) Forced 5.00 0.15
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 27.16
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 3.29
MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 Forced 755.00 15.00
MSTANG_2_SOLAR Mustang Planned 30.00 0.00
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 8.64
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Forced 12.00 12.00
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 0.00
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 0.00
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 3.64
OLDRIV_6_BIOGAS Bidart Old River 1 Forced 2.00 1.01
OLDRV1_6_SOLAR Old River One Forced 20.00 1.12
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 1.58
PGSB_1_PDRP05 PDR-F PGSB SEES Forced 1.35 0.00
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Forced 210.00 45.00
PITTSP_7_UNIT 5 PITTSBURG UNIT 5 Planned 312.00 172.00
PITTSP_7_UNIT 6 PITTSBURG UNIT 6 Planned 317.00 177.00
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
PLSNTG_7_LNCLND Lincoln Landfill Power Plant Forced 4.98 2.18
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 8.57
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.20
RUSCTY_2_UNITS Russell City Energy Center Forced 620.00 0.00
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Planned 92.10 27.10
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 15.31
SCNW_6_PDRP02 PDR-G SCNW Forced 1.00 1.00
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 2.43
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 182.43
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 11.00
SNCLRA_2_UNIT1 New Indy Oxnard Forced 27.80 16.80
SNMALF_6_UNITS Sonoma County Landfill Planned 7.50 5.00
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Planned/Forced 586.02 28.02
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 27.00
SUNSHN_2_LNDFL Sunshine Gas Producers Forced 20.00 11.00
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 0.00
TANHIL_6_SOLART BERRY PETROLEUM COGEN 18 AGGREGATE Planned 17.00 0.00
TRNQLT_2_SOLAR Tranquillity Planned 200.00 200.00
TUPMAN_1_BIOGAS ABEC Bidart-Stockale #1 Forced 0.60 0.60
TX-ELK_6_SOLAR1 Castor Planned 1.50 0.58
UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO Forced 3.50 1.00
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 7.00
USWND2_1_WIND1 Golden Hills A Planned 42.96 1.85
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 3.66
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61
WDFRDF_2_UNITS WEST FORD FLAT AGGREGATE Forced 32.60 32.60
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 13 18 324.09 91.00
PGAE South 0 1 0.00 0.00
SCE Gen 57 102 4631.77 3418.96
SDGE Gen 11 20 717.40 493.26
40 152 3789.84 1126.87
Total 121 293 9463.10 5130.09


Report Generated on:
06/23/2016 15:21:06 (PPT)
Filtered Parameters:
Date = 06/23/2016
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO
Configurable Parameters:
Time = 3:15PM PPT

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.