Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALTA3A_2_CPCE8 CPC East - Alta Wind 8 Planned 150.00 0.00 SCE Gen
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Planned 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 0.00 SCE Gen
ALTWD_1_QF Altwind Planned 47.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned 820.00 381.00 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Forced 15.80 1.55 SCE Gen
BLKCRK_2_SOLAR1 McCoy Station Forced 250.00 6.20 SCE Gen
BLYTHE_1_SOLAR1 Blythe Solar 1 Project Forced 21.00 0.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDWAY_7_UNIT 3 BROADWAY UNIT 3 Forced 65.00 0.00 SCE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 0.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 1.50 SCE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Forced 40.00 4.00 PGAE North
CALGEN_1_UNITS COSO Finance Partners (Navy 1) Forced 92.20 0.00 SCE Gen
CALPSS_6_SOLAR1 Calipatria Solar Farm Forced 19.90 0.00 SDGE Gen
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Forced 122.00 4.00 PGAE North
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Planned 5.25 1.25 SDGE Gen
CENTRY_6_PL1X4 CENTURY GENERATING PLANT (AGGREGATE) Planned 41.40 14.40 SCE Gen
CHICPK_7_UNIT 1 CHICAGO PARK 1, BEAR RIVER CA Planned 42.00 0.00 PGAE North
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
COLEMN_2_UNIT Coleman Forced 13.00 8.00 PGAE North
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 16.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 15.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Forced 43.00 2.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 42.10 PGAE North
CONTRL_1_CASAD1 Mammoth G1 Forced 10.00 3.70 SCE Gen
CONTRL_1_CASAD3 Mammoth G3 Forced 14.00 5.10 SCE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 8.00 SDGE Gen
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Planned/Forced 125.00 107.00 SCE Gen
DRUM_7_PL1X2 Drum PH 1 Units 1 & 2 Aggregate Planned 26.00 0.00 PGAE North
DRUM_7_PL3X4 Drum PH 1 Units 3 & 4 Aggregate Planned 28.90 0.00 PGAE North
DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 Planned 50.00 0.00 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Planned/Forced 299.99 0.00 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned 250.00 15.00 SCE Gen
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Planned 22.00 0.00 PGAE North
DUTCH2_7_UNIT 1 DUTCH FLAT 2 PH Planned 26.00 0.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Forced 236.80 0.00 SCE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 1.70 SDGE Gen
ELNIDS_2_DODPEV Los Angeles Air Force Base Forced 0.50 0.40 SCE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 7.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 7.68 SCE Gen
ENERSJ_2_WIND ESJ Wind Energy Planned 155.10 0.00 SDGE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Forced 48.71 0.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 2.06 SCE Gen
ETIWND_2_UNIT1 New-Indy Ontario, LLC Planned 33.60 25.60 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned 24.00 24.00 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 0.30 SCE Gen
FAIRHV_6_UNIT FAIRHAVEN POWER CO. Forced 19.90 19.90 PGAE North
FMEADO_7_UNIT FRENCH MEADOWS HYDRO Planned 18.00 0.00 PGAE North
GARLND_2_GASLR Garland B Planned/Forced 180.00 180.00 SCE Gen
GARLND_2_GASLRA Garland A Planned/Forced 20.00 20.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_1_WT3WND Wagner Wind Forced 6.00 0.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 1.50 SCE Gen
GARNET_2_WIND3 San Gorgonio East Planned 12.60 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLNARM_7_UNIT 3 GLEN ARM UNIT 3 Forced 44.83 0.00 SCE Gen
GOLETA_6_ELLWOD ELLWOOD ENERGY SUPPORT FACILITY Forced 54.00 54.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE Forced 49.20 0.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 0.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 0.00 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Planned/Forced 830.00 107.00 SCE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Planned 65.08 0.00 PGAE North
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 6.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 6.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 5.69 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Forced 376.20 26.20 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 6.40 SCE Gen
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Forced 153.90 7.90 PGAE North
KILARC_2_UNIT 1 KILARC HYDRO Forced 3.20 1.60 PGAE North
KNGBRD_2_SOLAR2 Kingbird Solar B Forced 20.00 4.00 SCE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 3.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Planned 180.00 180.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 24.00 SDGE Gen
LASSEN_6_UNITS LASSEN AREA QF AGGREGATION Forced 32.00 0.00 PGAE North
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 36.47 SCE Gen
LGHTHP_6_ICEGEN CARSON COGENERATION Forced 48.00 48.00 SCE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 0.00 SCE Gen
MDFKRL_2_PROJCT MIDDLE FORK AND RALSTON PSP Planned 218.39 0.00 PGAE North
MNDALY_7_UNIT 2 MANDALAY GEN STA. UNIT 2 Forced 215.29 15.29 SCE Gen
MNDOTA_1_SOLAR2 Citizen Solar B Forced 5.00 0.00 SCE Gen
MOJAVW_2_SOLAR Mojave West Forced 20.00 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 7.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOORPK_7_UNITA1 WEME- Simi Valley Landfill Forced 2.49 1.19 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 74.58 SCE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 0.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 0.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 9.90 SCE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Planned 12.00 12.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 29.50 PGAE North
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 7.00 SDGE Gen
OASIS_6_SOLAR2 Oasis Solar Forced 20.00 1.00 SCE Gen
OGROVE_6_PL1X2 Orange Grove Energy Center Forced 96.00 0.86 SDGE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 6.80 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 5.11 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 7.11 SCE Gen
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Forced 775.00 775.00 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 35.68 SDGE Gen
OXBOW_6_DRUM OXBOW HYDRO Planned 6.00 0.00 PGAE North
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 8.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.42 SCE Gen
PANDOL_6_UNIT Covanta Delano, Inc. Planned 49.00 49.00 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.55 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.55 SDGE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Planned 102.67 102.67 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Planned/Forced 102.67 102.67 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Planned 102.67 102.67 SDGE Gen
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 1.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 2.00 PGAE North
POTTER_6_UNITS Potter Valley Planned 10.10 5.30 PGAE North
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Forced 635.00 5.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 0.00 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Planned 359.60 77.60 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 0.00 SCE Gen
REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 Forced 175.00 25.00 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Forced 505.96 0.00 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
ROLLIN_6_UNIT ROLLINS HYDRO Planned 13.50 0.00 PGAE North
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 38.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 38.00 SDGE Gen
RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 Forced 49.00 49.00 SCE Gen
RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 Forced 49.00 49.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Forced 48.35 48.35 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Forced 48.50 48.50 SCE Gen
RVSIDE_6_SPRING SPRINGS GENERATION PROJECT AGGREGATE Forced 36.00 36.00 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 1.84 SCE Gen
SAUGUS_7_CHIQCN Chiquita Canyon Landfill Fac Planned 8.00 0.00 SCE Gen
SAUGUS_7_LOPEZ MM Lopez Energy Planned 6.10 4.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 0.00 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned/Forced 3.93 2.93 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 114.00 SCE Gen
SLSTR1_2_SOLAR1 Solar Star 1 Forced 310.00 310.00 SCE Gen
SLSTR2_2_SOLAR2 Solar Star 2 Forced 276.00 276.00 SCE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Planned 6.50 6.50 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Planned 11.40 11.40 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Planned 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 1.20 SCE Gen
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 8.81 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 8.31 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned/Forced 85.00 6.89 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 7.71 SCE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Forced 16.90 8.65 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Forced 21.68 9.08 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 28.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 37.50 SCE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 1.85 PGAE North
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.40 SCE Gen
VALLEY_7_UNITA1 WM Energy, El Sobrante Landfill Forced 3.74 2.74 SCE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Forced 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 20.50 SCE Gen
VICTOR_1_LVSLR2 Lone Valley Solar Park 2 Forced 20.00 2.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 12.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 21.50 SCE Gen
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Planned 22.00 8.00
ALLGNY_6_HYDRO1 Salmon Creek Hydroelectric Project Forced 0.52 0.52
ASTORA_2_SOLAR1 Astoria 1 Planned/Forced 98.85 98.85
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 128.00
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 47.49 4.99
BEARMT_1_UNIT Bear Mountain Limited Forced 47.49 2.49
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 0.00
BIGSKY_2_SOLAR3 Big Sky Summer Planned/Forced 20.00 0.00
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 22.00
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 3.00
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 2.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 2.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Forced 59.00 15.00
CANTUA_1_SOLAR Cantua Solar Station Planned 20.00 0.00
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 47.49 3.19
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned 10.80 1.30
CLOVER_2_UNIT Clover Creek Planned 0.99 0.00
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 15.99
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 14.61
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 21.66
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 15.35
CORCAN_1_SOLAR2 Corcoran City Planned 11.00 11.00
CRNEVL_6_CRNVA Crane Valley Planned 0.90 0.90
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Planned 3.20 3.20
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Planned 4.20 4.20
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 2.53
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned 880.00 70.00
DEXZEL_1_UNIT Western Power and Steam Cogeneration Forced 20.00 20.00
DIABLO_7_UNIT 1 Diablo Canyon Unit 1 Planned 1150.00 0.00
DIABLO_7_UNIT 2 Diablo Canyon Unit 2 Planned 1150.00 0.00
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 12.00
DONNLS_7_UNIT Donnells Hydro Forced 72.00 3.50
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 2.23
DRACKR_2_SOLAR1 Dracker Solar Unit 1 Forced 110.00 0.00
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 37.70
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 0.00
EXCLSG_1_SOLAR Excelsior Solar Forced 60.00 60.00
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30
FRIANT_6_UNITS FRIANT DAM Forced 25.00 20.00
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Planned/Forced 562.50 27.60
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Planned 74.40 3.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Planned 57.00 6.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Planned 95.00 33.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Planned 70.00 12.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 39.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Planned 60.00 5.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 26.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 24.00
GIFFEN_6_SOLAR Giffen Solar Station Planned 10.00 0.00
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 15.00
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 6.06
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Planned 85.00 0.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Planned 82.00 5.00
GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro Forced 3.75 2.42
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 7.70
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 4.09
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 3.63
HENRTS_1_SOLAR Henrietta Solar Project Planned/Forced 100.00 100.00
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 270.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned/Forced 405.00 36.00
JAKVAL_6_UNITG1 BUENA VISTA Forced 17.84 0.00
KELSO_2_UNITS Mariposa Energy Forced 198.03 1.46
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 2.40
KRNCNY_6_UNIT KERN CANYON Planned 11.50 1.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 9.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 6.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 4.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 19.54
LASSEN_6_AGV1 AGV 1 Planned 1.80 1.80
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 301.98 6.98
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 47.49 5.09
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 561.29 39.29
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 22.78
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 3.99
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 38.16
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 3.29
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Forced 510.00 268.00
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Forced 510.00 18.00
MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 Forced 755.00 15.00
MSTANG_2_SOLAR Mustang Forced 30.00 17.00
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 8.64
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Forced 12.00 12.00
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 3.64
OLDRIV_6_BIOGAS Bidart Old River 1 Forced 2.00 1.01
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Planned 10.62 1.58
PGEB_2_PDRP03 PDR-A PGEB Planned 0.46 0.46
PGF1_2_PDRP01 PDR-F PGF1 Forced 3.85 3.85
PGFG_1_PDRP02 PDR-F PGFG SEL1 Forced 0.20 0.20
PGSB_1_PDRP07 PDR-B PGSB Forced 0.18 0.18
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 10.00
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
PLSNTG_7_LNCLND Lincoln Landfill Power Plant Forced 4.98 1.78
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 6.71
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.20
RUSCTY_2_UNITS Russell City Energy Center Planned 620.00 0.00
SALIRV_2_UNIT SALINAS RIVER COGEN CO. Planned 57.00 57.00
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Planned 92.10 27.10
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 13.31
SCNW_6_PDRP02 PDR-G SCNW Forced 1.00 1.00
SDG1_1_PDRP02 PDR-H SDG1-1 Planned 0.30 0.30
SDG1_1_PDRP03 PDR-H SDG1-2 Planned 0.20 0.20
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 2.43
SISQUC_1_SMARIA Santa Maria II LFG Power Plant Forced 1.42 1.42
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 0.00
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Planned/Forced 53.00 53.00
SNMALF_6_UNITS Sonoma County Landfill Planned 7.50 5.00
SOUTH_2_UNIT SOUTH HYDRO Planned 7.10 7.10
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 29.02
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 24.00
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 0.00
TRNQLT_2_SOLAR Tranquillity Forced 200.00 0.00
TUPMAN_1_BIOGAS ABEC Bidart-Stockale #1 Forced 0.60 0.60
TX-ELK_6_SOLAR1 Castor Planned 1.50 0.58
UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO Forced 3.50 1.00
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 16.00
USWND2_1_WIND1 Golden Hills A Forced 42.96 0.00
USWND2_1_WIND2 Golden Hills B Forced 42.96 1.85
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61
WDFRDF_2_UNITS WEST FORD FLAT AGGREGATE Forced 32.60 32.60
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Planned 18.40 18.40
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 2.50


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 19 20 198.24 51.65
PGAE South 0 1 0.00 0.00
SCE Gen 53 100 3411.28 2070.39
SDGE Gen 9 22 665.42 488.01
60 134 2825.14 1122.30
Total 141 277 7100.08 3732.35


Report Generated on:
07/21/2016 15:15:03 (PPT)
Filtered Parameters:
Date = 07/21/2016
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO
Configurable Parameters:
Time = 3:15PM PPT

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.