Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 0.00 SCE Gen
ALTWD_1_QF Altwind Planned 47.00 0.00 SCE Gen
ASTORA_2_SOLAR1 Astoria 1 Forced 98.85 98.85 SCE Gen
ASTORA_2_SOLAR2 Astoria 2 Forced 74.12 74.12 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 3.90 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 13.05 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 1.50 SCE Gen
CENTRY_6_PL1X4 CENTURY GENERATING PLANT (AGGREGATE) Planned 41.40 14.40 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
COLEMN_2_UNIT Coleman Forced 13.00 7.00 PGAE North
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 22.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 19.67 PGAE North
CONTRL_1_LUNDY LUNDY Forced 3.00 1.85 SCE Gen
COPMT4_2_SOLAR4 Copper Mountain Solar 4 Forced 92.00 92.00 SCE Gen
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Forced 125.00 0.00 SCE Gen
DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 Planned 50.00 50.00 PGAE North
ELNIDS_2_DODPEV Los Angeles Air Force Base Forced 0.50 0.40 SCE Gen
ETIWND_2_SOLAR5 Dulles Forced 2.00 0.20 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned 24.00 24.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_WIND3 San Gorgonio East Planned 12.60 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 0.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 0.00 PGAE South
HATCR2_7_UNIT Hat Creek #2 Planned 8.50 8.50 PGAE North
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 3.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 3.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 2.69 SCE Gen
INDVLY_1_UNITS Indian Valley Hydro Forced 3.01 3.01 PGAE North
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 12.80 SCE Gen
KILARC_2_UNIT 1 KILARC HYDRO Forced 3.20 1.60 PGAE North
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 2.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 17.00 SDGE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 3.00 SCE Gen
MIDWD_7_CORAMB CELLC 7.5 MW Tehachapi Project Forced 7.50 1.50 SCE Gen
MOJAVE_1_SIPHON MOJAVE SIPHON POWER PLANT Forced 12.58 0.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MSOLAR_2_SOLAR3 Mesquite Solar 3, LLC Forced 152.00 152.00 SDGE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 55.00 PGAE North
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 9.80 PGAE North
PANDOL_6_UNIT Covanta Delano, Inc. Planned 49.00 49.00 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.55 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.55 SDGE Gen
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Planned 55.70 2.30 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Planned 54.60 4.00 PGAE North
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Planned 69.00 69.00 PGAE North
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Forced 635.00 5.00 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Planned/Forced 6.55 2.00 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Forced 2.25 2.25 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
RSMSLR_6_SOLAR1 Rosamond One Forced 20.00 0.00 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 111.00 SCE Gen
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Planned 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 0.00 SCE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 18.00 SCE Gen
TOADTW_6_UNIT TOAD TOWN Forced 1.50 1.50 PGAE North
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.60 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Forced 5.75 5.75 SCE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Forced 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Planned/Forced 36.80 36.80 SCE Gen
VICTOR_1_LVSLR2 Lone Valley Solar Park 2 Forced 20.00 2.00 SCE Gen
WARNE_2_UNIT WARNE HYDRO AGGREGATE Planned 76.00 36.90 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 16.50 SCE Gen
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Planned 22.00 7.00
ALLGNY_6_HYDRO1 Salmon Creek Hydroelectric Project Forced 0.52 0.52
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 0.00
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 1.80
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 4.60
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 0.00
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Planned/Forced 59.00 34.00
CAMPFW_7_FARWST CAMP FAR WEST HYDRO Planned 8.00 8.00
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 0.05
CLOVER_2_UNIT Clover Creek Forced 0.99 0.99
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COGNAT_1_UNIT Stockton Biomas Forced 48.00 13.00
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 12.00
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90
ESQUON_6_LNDFIL Neal Road Landfill Generating Facility Forced 2.10 2.10
EXCLSG_1_SOLAR Excelsior Solar Forced 60.00 60.00
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Planned 74.40 7.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Planned 57.00 10.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Planned 95.00 36.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Planned 70.00 16.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 43.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Planned 60.00 4.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 28.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 27.00
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Planned 85.00 2.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Planned 82.00 8.00
GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro Forced 3.75 2.50
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 403.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 73.00
JAKVAL_6_UNITG1 BUENA VISTA Forced 17.84 0.00
KRNCNY_6_UNIT KERN CANYON Planned 11.50 1.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
MENBIO_6_RENEW1 CalRENEW - 1(A) Forced 5.00 5.00
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Forced 510.00 20.00
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Forced 510.00 18.00
MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 Forced 755.00 15.00
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 28.00
PARDEB_6_UNITS Pardee Power House Planned 30.00 10.00
PGEB_2_PDRP03 PDR-A PGEB Planned 0.46 0.46
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Forced 210.00 210.00
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.30
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Planned 92.10 32.10
SDG1_1_PDRP02 PDR-H SDG1-1 Planned 0.30 0.30
SDG1_1_PDRP03 PDR-H SDG1-2 Forced 0.20 0.20
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 262.43
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.06
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.66
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
WEBER_6_FORWRD Forward Forced 4.20 4.20
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Planned 18.40 4.60
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Planned 17.10 17.10


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 5 9 254.10 187.01
PGAE South 0 1 0.00 0.00
SCE Gen 14 40 756.26 479.89
SDGE Gen 1 4 197.63 152.00
24 44 2202.69 953.89
Total 44 98 3410.68 1772.79


Report Generated on:
10/07/2016 09:41:55 (PPT)
Filtered Parameters:
Date = 09/29/2016
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.