Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Planned 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 0.00 SCE Gen
ALTWD_1_QF Altwind Planned 47.00 0.00 SCE Gen
ARCOGN_2_UNITS WATSON COGENERATION Planned 416.60 0.00 SCE Gen
ASTORA_2_SOLAR1 Astoria 1 Planned/Forced 98.85 62.98 SCE Gen
ASTORA_2_SOLAR2 Astoria 2 Forced 74.12 62.31 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 493.00 SCE Gen
BIGSKY_2_SOLAR1 Antelope Big Sky Ranch Forced 20.00 1.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 3.90 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 14.05 SCE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Planned 85.00 0.00 PGAE North
BLACK_7_UNIT 2 JAMES B. BLACK 2 Planned 84.10 0.00 PGAE North
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 0.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 1.50 SCE Gen
CABZON_1_WINDA1 Cabazon Wind Project Planned 41.00 0.00 SCE Gen
CENTRY_6_PL1X4 CENTURY GENERATING PLANT (AGGREGATE) Planned 41.40 14.40 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
COLEMN_2_UNIT Coleman Forced 13.00 7.00 PGAE North
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned/Forced 176.72 23.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 22.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 60.73 PGAE North
CONTRL_1_LUNDY LUNDY Planned/Forced 3.00 1.85 SCE Gen
COPMT4_2_SOLAR4 Copper Mountain Solar 4 Forced 92.00 16.30 SCE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 4.00 SDGE Gen
DRACKR_2_SOLAR1 Dracker Solar Unit 1 Planned 110.00 0.00 SCE Gen
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Forced 125.00 26.00 SCE Gen
DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 Planned 50.00 50.00 PGAE North
DSRTSN_2_SOLAR1 Desert Sunlight 300 Forced 300.00 0.00 SCE Gen
ELCAJN_6_UNITA1 Cuyamaca Peak Energy Plant Planned 45.42 45.42 SDGE Gen
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Planned 101.50 0.00 PGAE North
ELNIDS_2_DODPEV Los Angeles Air Force Base Forced 0.50 0.40 SCE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 6.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 6.68 SCE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ESCO_6_GLMQF Goal Line Cogen Planned 49.90 0.00 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 1.06 SCE Gen
ETIWND_2_SOLAR5 Dulles Planned/Forced 2.00 0.00 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned 24.00 24.00 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 0.80 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 1.50 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Forced 11.70 1.50 SCE Gen
GARNET_2_WIND3 San Gorgonio East Planned 12.60 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 345.00 SCE Gen
GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE Forced 49.20 0.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 0.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Forced 144.00 0.00 PGAE South
HATCR2_7_UNIT Hat Creek #2 Planned 8.50 8.50 PGAE North
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 86.00 SCE Gen
HNTGBH_7_UNIT 1 HUNTINGTON BEACH GEN STA. UNIT 1 Forced 225.75 225.75 SCE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 3.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 3.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 2.69 SCE Gen
INDVLY_1_UNITS Indian Valley Hydro Forced 3.01 3.01 PGAE North
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 14.20 SCE Gen
INLDEM_5_UNIT 2 Inland Empire Energy Center, Unit 2 Planned 366.32 9.32 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 6.40 SCE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Planned 11.00 0.00 PGAE North
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 12.80 SCE Gen
KILARC_2_UNIT 1 KILARC HYDRO Planned/Forced 3.20 3.20 PGAE North
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 2.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Forced 180.00 15.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 17.00 SDGE Gen
LASSEN_6_UNITS LASSEN AREA QF AGGREGATION Forced 32.00 32.00 PGAE North
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 5.47 SCE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 1.50 SCE Gen
MIDWD_7_CORAMB CELLC 7.5 MW Tehachapi Project Forced 7.50 1.50 SCE Gen
MOJAVE_1_SIPHON MOJAVE SIPHON POWER PLANT Planned/Forced 12.58 0.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOORPK_6_QF MOORPARK QFS Planned 34.80 34.80 SCE Gen
MOORPK_7_UNITA1 WEME- Simi Valley Landfill Planned 2.49 0.99 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Planned 494.58 494.58 SCE Gen
MSOLAR_2_SOLAR3 Mesquite Solar 3, LLC Forced 152.00 36.52 SDGE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 9.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 4.20 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 0.66 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 55.00 PGAE North
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 4.00 SDGE Gen
NIMTG_6_NIQF NORTH ISLAND QF Forced 42.70 0.00 SDGE Gen
NZWIND_6_WDSTR Windstream 39 Forced 6.20 0.00 SCE Gen
NZWIND_6_WDSTR2 Windstream 6040 Forced 6.90 0.00 SCE Gen
NZWIND_6_WDSTR3 Windstream 6041 Forced 6.00 0.00 SCE Gen
NZWIND_6_WDSTR4 Windstream 6042 Forced 6.77 0.00 SCE Gen
OGROVE_6_PL1X2 Orange Grove Energy Center Forced 96.00 0.86 SDGE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 5.00 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 3.21 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 5.21 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 13.68 SDGE Gen
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 9.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.42 SCE Gen
PANDOL_6_UNIT Covanta Delano, Inc. Planned 49.00 49.00 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.55 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.55 SDGE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 102.67 102.67 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 102.67 102.67 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 102.67 102.67 SDGE Gen
PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE Planned 95.00 40.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Planned 55.70 2.30 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Planned 54.60 4.00 PGAE North
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Planned 69.00 69.00 PGAE North
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 73.60 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Planned/Forced 6.55 2.00 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned/Forced 2.25 2.25 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 4.00 SCE Gen
RSMSLR_6_SOLAR1 Rosamond One Forced 20.00 1.60 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 1.29 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SAUGUS_7_LOPEZ MM Lopez Energy Planned 6.10 4.09 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned/Forced 3.93 2.93 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned/Forced 525.00 111.00 SCE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 0.94 PGAE North
SPQUIN_6_SRPCQU Quincy Biomass Planned 22.00 16.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Planned 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 0.00 SCE Gen
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 5.16 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 3.34 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned 85.00 4.39 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned/Forced 85.00 2.71 SCE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 10.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 0.00 SCE Gen
TOADTW_6_UNIT TOAD TOWN Forced 1.50 1.50 PGAE North
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.60 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Forced 5.75 5.75 SCE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Forced 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Planned/Forced 36.80 36.80 SCE Gen
VESTAL_2_SOLAR1 NICOLIS Forced 20.00 2.00 SCE Gen
VICTOR_1_LVSLR2 Lone Valley Solar Park 2 Forced 20.00 2.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 3.00 SCE Gen
WADHAM_6_UNIT Wadham Energy LP Planned 32.00 32.00 PGAE North
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WARNE_2_UNIT WARNE HYDRO AGGREGATE Planned 76.00 36.90 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 16.50 SCE Gen
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Planned 22.00 7.00
ALLGNY_6_HYDRO1 Salmon Creek Hydroelectric Project Forced 0.52 0.52
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 128.00
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 47.49 4.99
BEARMT_1_UNIT Bear Mountain Limited Forced 47.49 2.49
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 0.00
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00
BLCKBT_2_STONEY BLACK BUTTE HYDRO Planned/Forced 6.20 6.20
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 3.60
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 4.60
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 3.00
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 10.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 2.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Planned/Forced 59.00 34.00
CAMPFW_7_FARWST CAMP FAR WEST HYDRO Planned 8.00 8.00
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 0.05
CEDRCK_6_UNIT Water Wheel Ranch Forced 0.98 0.98
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 47.49 1.69
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned 10.80 3.25
CLOVER_2_UNIT Clover Creek Planned/Forced 0.99 0.99
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 9.60
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 8.92
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 15.60
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 9.11
COGNAT_1_UNIT Stockton Biomas Planned/Forced 48.00 48.00
COWCRK_2_UNIT Cow Creek Hydro Planned 2.00 2.00
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 1.33
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned 880.00 320.00
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 12.00
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 0.33
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 33.70
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 3.39
ESQUON_6_LNDFIL Neal Road Landfill Generating Facility Forced 2.10 2.10
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Forced 94.50 19.50
EXCLSG_1_SOLAR Excelsior Solar Forced 60.00 0.00
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 562.50 8.51
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Planned 74.40 6.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Planned 57.00 6.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Planned 95.00 36.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Planned 70.00 14.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 42.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Planned 60.00 3.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 26.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 24.00
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00
GWFPWR_1_UNITS HANFORD PEAKER PLANT Planned/Forced 98.46 0.73
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Planned 85.00 1.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Planned 82.00 7.00
GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro Forced 3.75 2.50
HALSEY_6_UNIT HALSEY HYDRO Forced 13.50 13.50
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 3.10
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Planned 407.00 407.00
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.44
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 0.99
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 285.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 33.00
JAKVAL_6_UNITG1 BUENA VISTA Forced 17.84 0.00
KELSO_2_UNITS Mariposa Energy Planned 198.03 198.03
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.00
KRNCNY_6_UNIT KERN CANYON Planned 11.50 1.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 1.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 10.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 11.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 16.54
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 306.00 1.90
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Planned/Forced 47.49 4.49
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned 561.29 297.29
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 14.88
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 3.99
MENBIO_6_RENEW1 CalRENEW - 1(A) Forced 5.00 0.00
METEC_2_PL1X3 Metcalf Energy Center Planned/Forced 593.16 13.16
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 3.09
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Forced 510.00 20.00
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Forced 510.00 18.00
MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 Forced 755.00 15.00
MSTANG_2_SOLAR3 Mustang 3 Forced 40.00 0.68
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Planned 46.64 46.64
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Forced 12.00 12.00
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 0.00
OLSEN_2_UNIT OLSEN POWER PARTNERS Planned 5.80 5.80
ORLND_6_HIGHLI High Line Canal Hydro Planned 0.50 0.50
PARDEB_6_UNITS Pardee Power House Planned 30.00 10.00
PGEB_2_PDRP03 PDR-A PGEB Planned 0.46 0.46
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Forced 210.00 0.00
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
PLACVL_1_CHILIB Chili Bar Hydro Planned 8.40 8.40
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.00
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.30
RUSCTY_2_UNITS Russell City Energy Center Forced 620.00 0.00
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Planned 92.10 27.10
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 7.61
SDG1_1_PDRP02 PDR-H SDG1-1 Planned 0.30 0.30
SDG1_1_PDRP03 PDR-H SDG1-2 Forced 0.20 0.20
SGREGY_6_SANGER DYNAMIS COGEN Forced 48.30 48.30
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 0.43
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 209.43
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Planned/Forced 53.00 53.00
SPICER_1_UNITS SPICER HYDRO UNITS 1-3 AGGREGATE Planned 6.00 2.80
STIGCT_2_LODI LODI STIG UNIT Forced 49.90 49.90
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 19.02
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 15.00
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 4.80
TKOPWR_6_HYDRO Bear Creek Hydroelectric Project Planned 2.83 2.83
TRNQLT_2_SOLAR Tranquillity Forced 200.00 2.00
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 8.00
USWND2_1_WIND1 Golden Hills A Planned/Forced 42.96 42.96
USWND2_1_WIND2 Golden Hills B Forced 42.96 42.96
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.66
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61
WEBER_6_FORWRD Forward Forced 4.20 4.20
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Planned 18.40 4.60
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Planned 17.10 17.10


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 14 13 441.37 254.21
PGAE South 0 1 0.00 0.00
SCE Gen 57 71 2522.34 977.00
SDGE Gen 4 22 486.41 353.43
55 103 3689.25 1676.89
Total 130 210 7139.37 3261.53


Report Generated on:
10/01/2016 15:15:00 (PPT)
Filtered Parameters:
Date = 10/02/2016
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.