Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Forced 332.18 0.00 SCE Gen
ALAMIT_7_UNIT 4 ALAMITOS GEN STA. UNIT 4 Forced 335.67 0.00 SCE Gen
ALAMO_6_UNIT ALAMO POWER PLANT Planned 17.00 17.00 SCE Gen
ALTA3A_2_CPCE8 CPC East - Alta Wind 8 Planned 150.00 9.00 SCE Gen
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 0.00 SCE Gen
ALTWD_1_QF Altwind Planned 47.00 0.00 SCE Gen
ARCOGN_2_UNITS WATSON COGENERATION Planned 416.60 208.60 SCE Gen
ASTORA_2_SOLAR2 Astoria 2 Planned/Forced 75.00 61.85 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned 820.00 670.00 SCE Gen
BIGSKY_2_SOLAR1 Antelope Big Sky Ranch Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Planned 5.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 4.50 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 14.05 SCE Gen
BLAST_1_WIND Mountain View IV Wind Planned/Forced 49.00 29.52 SCE Gen
BLKCRK_2_SOLAR1 McCoy Station Forced 250.00 2.40 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 0.00 SDGE Gen
BRDWAY_7_UNIT 3 BROADWAY UNIT 3 Planned 65.00 65.00 SCE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 0.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 4.50 SCE Gen
BUCKWD_7_WINTCV Wintec Energy, Ltd. Forced 1.32 0.66 SCE Gen
CAPWD_1_QF Edom Hills Wind Farm Planned 19.55 19.55 SCE Gen
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Forced 120.00 2.00 PGAE North
CENTRY_6_PL1X4 CENTURY GENERATING PLANT (AGGREGATE) Planned 41.40 14.40 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
COLEMN_2_UNIT Coleman Forced 13.00 7.00 PGAE North
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 23.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 22.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Planned 641.00 641.00 PGAE North
CONTRL_1_LUNDY LUNDY Planned/Forced 3.00 1.50 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Planned 11.94 5.50 SCE Gen
COPMT2_2_SOLAR2 CMS2 Planned 155.00 0.00 SCE Gen
COPMT4_2_SOLAR4 Copper Mountain Solar 4 Planned/Forced 92.00 0.00 SCE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Planned 70.40 0.00 PGAE North
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Planned/Forced 50.00 4.00 SDGE Gen
DELAMO_2_SOLAR3 Golden Springs Building G Planned 1.25 0.00 SCE Gen
DELAMO_2_SOLAR4 Golden Springs Building F Planned 1.30 0.00 SCE Gen
DELAMO_2_SOLAR5 Golden Springs Building L Planned 1.00 0.00 SCE Gen
DELAMO_2_SOLAR6 Freeway Springs Planned/Forced 2.00 0.00 SCE Gen
DELSUR_6_CREST Delsur Aggregate Solar Resources Forced 10.00 0.00 SCE Gen
DELSUR_6_SOLAR1 Summer Solar North Forced 6.50 0.00 SCE Gen
DRACKR_2_SOLAR1 Dracker Solar Unit 1 Forced 110.00 8.00 SCE Gen
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Forced 125.00 11.00 SCE Gen
DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 Planned 50.00 50.00 PGAE North
DSABLA_7_UNIT De Sabla Hydro Planned 18.50 0.00 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Planned 296.19 0.00 SCE Gen
DSRTSN_2_SOLAR1 Desert Sunlight 300 Planned 300.00 0.00 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned 250.00 0.00 SCE Gen
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Planned 22.00 0.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 116.80 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 200.00 SCE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 0.00 SDGE Gen
ELCAJN_6_UNITA1 Cuyamaca Peak Energy Plant Planned 45.42 45.42 SDGE Gen
ELDORO_7_UNIT 1 El Dorado Unit 1 Forced 11.00 11.00 PGAE North
ELDORO_7_UNIT 2 El Dorado Unit 2 Forced 11.00 11.00 PGAE North
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Planned 101.50 31.70 PGAE North
ELNIDS_2_DODPEV Los Angeles Air Force Base Forced 0.50 0.40 SCE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 2.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 2.68 SCE Gen
ENCINA_7_EA5 ENCINA UNIT 5 Planned 330.00 330.00 SDGE Gen
ENERSJ_2_WIND ESJ Wind Energy Planned 155.10 0.00 SDGE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Planned 48.71 0.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Planned 48.04 48.04 SDGE Gen
ESCO_6_GLMQF Goal Line Cogen Planned 49.90 49.90 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 1.06 SCE Gen
ETIWND_2_SOLAR2 Rochester Forced 1.00 1.00 SCE Gen
ETIWND_2_SOLAR5 Dulles Planned/Forced 2.00 0.00 SCE Gen
ETIWND_2_UNIT1 New-Indy Ontario, LLC Forced 33.60 25.60 SCE Gen
ETIWND_6_GRPLND Grapeland Peaker Planned/Forced 46.00 46.00 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned 24.00 24.00 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 1.20 SCE Gen
FLOWD_2_WIND1 Cameron Ridge 2 Forced 11.90 0.00 SCE Gen
FORBST_7_UNIT 1 FORBESTOWN HYDRO Planned 37.50 0.00 PGAE North
GARLND_2_GASLR Garland B Planned/Forced 180.00 0.00 SCE Gen
GARLND_2_GASLRA Garland A Planned 20.00 20.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Forced 11.70 3.00 SCE Gen
GARNET_2_WIND3 San Gorgonio East Planned 12.60 0.00 SCE Gen
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Planned 22.07 22.07 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLNARM_7_UNIT 3 GLEN ARM UNIT 3 Planned 44.83 44.83 SCE Gen
GLNARM_7_UNIT 4 GLEN ARM UNIT 4 Planned 42.42 42.42 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 370.00 SCE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Planned 20.00 0.00 PGAE North
GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE Planned 49.20 49.20 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned/Forced 144.00 144.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned/Forced 144.00 144.00 PGAE South
HATCR2_7_UNIT Hat Creek #2 Planned 8.50 8.50 PGAE North
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 80.00 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 16.27 PGAE North
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 1.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Planned/Forced 44.53 44.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Planned/Forced 43.69 43.69 SCE Gen
INDVLY_1_UNITS Indian Valley Hydro Forced 3.01 3.01 PGAE North
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 14.20 SCE Gen
INLDEM_5_UNIT 2 Inland Empire Energy Center, Unit 2 Planned 366.32 9.32 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
IVWEST_2_SOLAR1 Imperial Valley West ( Q # 608) Planned/Forced 150.00 0.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 4.80 SCE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Planned 11.00 0.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Planned/Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Planned/Forced 12.80 12.80 PGAE North
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Planned 153.90 153.90 PGAE North
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Planned/Forced 25.60 12.80 SCE Gen
KILARC_2_UNIT 1 KILARC HYDRO Forced 3.20 1.60 PGAE North
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 0.00 SCE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 2.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Forced 180.00 15.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 17.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 5.47 SCE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 3.00 SCE Gen
MDFKRL_2_PROJCT MIDDLE FORK AND RALSTON PSP Planned/Forced 218.39 218.39 PGAE North
MNDOTA_1_SOLAR2 Citizen Solar B Planned 5.00 1.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOORPK_7_UNITA1 WEME- Simi Valley Landfill Planned 2.49 1.49 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Planned 494.58 494.58 SCE Gen
MSOLAR_2_SOLAR1 Mesquite Solar 1 Forced 165.00 0.00 SCE Gen
MSOLAR_2_SOLAR2 Mesquite Solar 2 Planned 100.00 0.00 SDGE Gen
MSOLAR_2_SOLAR3 Mesquite Solar 3, LLC Forced 152.00 36.52 SDGE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 26.75 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 13.37 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Planned/Forced 22.44 13.52 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 40.90 PGAE North
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 4.00 SDGE Gen
NZWIND_6_WDSTR Windstream 39 Planned 6.20 0.00 SCE Gen
NZWIND_6_WDSTR2 Windstream 6040 Planned 6.90 0.00 SCE Gen
NZWIND_6_WDSTR3 Windstream 6041 Planned 6.00 0.00 SCE Gen
NZWIND_6_WDSTR4 Windstream 6042 Planned 6.77 0.00 SCE Gen
OGROVE_6_PL1X2 Orange Grove Energy Center Planned 96.00 96.00 SDGE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 5.90 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 4.11 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 6.21 SCE Gen
OMAR_2_UNIT 4 KERN RIVER COGENERATION CO. UNIT 4 Planned 81.44 0.00 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 17.68 SDGE Gen
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 9.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.42 SCE Gen
PALOMR_2_PL1X3 Palomar Energy Center Planned 575.00 300.00 SDGE Gen
PANDOL_6_UNIT Covanta Delano, Inc. Planned 49.00 49.00 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.55 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.55 SDGE Gen
PEARBL_2_NSPIN PEARBL_2_NSPIN Planned 151.20 151.20 SCE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 102.67 102.67 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 102.67 102.67 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 102.67 2.67 SDGE Gen
PIT1_7_UNIT 1 PIT PH 1 UNIT 1 Planned 32.00 32.00 PGAE North
PIT1_7_UNIT 2 PIT PH 1 UNIT 2 Planned 32.00 32.00 PGAE North
PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE Planned 95.00 40.00 PGAE North
PIT5_7_PL1X2 PIT PH 5 UNITS 1 & 2 AGGREGATE Planned 82.00 82.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Planned 55.70 55.70 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Planned 54.60 54.60 PGAE North
PLAINV_6_BSOLAR Western Antelope Blue Sky Ranch A Forced 20.00 2.00 SCE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Planned 69.00 0.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Planned/Forced 68.50 0.00 PGAE North
PTLOMA_6_NTCQF NTC/MCRD COGENERATION Planned 22.30 22.30 SDGE Gen
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Planned/Forced 635.00 210.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Planned 359.60 130.60 SCE Gen
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Planned 57.00 57.00 PGAE North
RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 Planned 56.90 56.90 PGAE North
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Planned/Forced 6.55 6.55 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned/Forced 2.25 2.25 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 2.50 SCE Gen
ROLLIN_6_UNIT ROLLINS HYDRO Planned 13.50 13.50 PGAE North
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 4.00 SCE Gen
RSMSLR_6_SOLAR1 Rosamond One Forced 20.00 1.60 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 0.00 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SAUGUS_7_LOPEZ MM Lopez Energy Planned 6.10 4.09 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Planned 525.00 525.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.93 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned/Forced 525.00 166.00 SCE Gen
SLSTR2_2_SOLAR2 Solar Star 2 Forced 276.00 19.50 SCE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Planned 13.00 0.00 PGAE North
SNCLRA_2_UNIT1 New Indy Oxnard Forced 27.80 16.80 SCE Gen
SNDBAR_7_UNIT 1 SAND BAR HYDRO Planned 18.60 18.60 PGAE North
SPBURN_2_UNIT 1 Burney Biomass Planned 22.00 22.00 PGAE North
SPQUIN_6_SRPCQU Quincy Biomass Planned 22.00 18.99 PGAE North
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Planned 7.00 7.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Planned 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Planned/Forced 2.50 2.50 SCE Gen
STANIS_7_UNIT 1 STANISLAUS HYDRO Planned 91.00 91.00 PGAE North
STNRES_1_UNIT Covanta Stanislaus Forced 19.90 11.90 PGAE North
SUNSHN_2_LNDFL Sunshine Gas Producers Forced 20.00 2.00 SCE Gen
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 5.56 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 6.28 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned 85.00 7.04 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 5.67 SCE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TENGEN_2_PL1X2 Berry Cogen 42 Planned 40.20 22.70 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 4.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Planned/Forced 45.00 27.11 SCE Gen
TOADTW_6_UNIT TOAD TOWN Forced 1.50 1.50 PGAE North
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.00 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Forced 5.75 5.75 SCE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Forced 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 18.30 SCE Gen
VICTOR_1_EXSLRA Expressway Solar A Forced 2.00 0.00 SCE Gen
VICTOR_1_EXSLRB Expressway Solar B Forced 2.00 0.00 SCE Gen
VICTOR_1_LVSLR2 Lone Valley Solar Park 2 Forced 20.00 20.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 8.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WDLEAF_7_UNIT 1 WOODLEAF HYDRO Planned 60.00 0.00 PGAE North
WISE_1_UNIT 2 WISE HYDRO UNIT 2 Planned 3.20 3.20 PGAE North
WNDSTR_2_WIND Windstar Planned 120.00 4.00 SCE Gen
ADERA_1_SOLAR1 Adera Solar Forced 20.00 0.00
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 7.00
ADOBEE_1_SOLAR Adobe Solar Forced 20.00 0.00
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Planned 23.80 23.80
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Planned 25.40 25.40
AVENAL_6_SANDDG Sand Drag Solar Project Forced 19.00 0.00
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Planned 33.00 0.00
BALCHS_7_UNIT 2 BALCH 2 PH UNIT 2 Planned 52.50 0.00
BALCHS_7_UNIT 3 BALCH 2 PH UNIT 3 Planned 54.60 0.00
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 128.00
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 47.49 4.99
BEARDS_7_UNIT 1 Beardsley Hydro Planned 11.50 11.50
BEARMT_1_UNIT Bear Mountain Limited Forced 47.49 2.49
BELDEN_7_UNIT 1 BELDEN HYDRO Planned/Forced 119.00 119.00
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 37.00
BLCKBT_2_STONEY BLACK BUTTE HYDRO Forced 6.20 6.20
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 3.60
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 4.60
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 1.50
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 8.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 4.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Planned 59.00 25.00
CAMPFW_7_FARWST CAMP FAR WEST HYDRO Planned 8.00 8.00
CANTUA_1_SOLAR Cantua Solar Station Planned 20.00 0.00
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 1.40
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 47.49 1.59
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned 10.80 3.25
CLOVER_2_UNIT Clover Creek Forced 0.99 0.99
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 9.60
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 8.92
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 15.60
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 9.11
COGNAT_1_UNIT Stockton Biomas Forced 48.00 48.00
COLVIL_7_PL1X2 COLLIERVILLE HYDRO UNIT 1 & 2 AGGREGATE Planned 246.86 120.86
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20
CSCGNR_1_UNIT 1 GIANERA PEAKER UNIT 1 Planned 24.75 24.75
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 1.73
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 38.00
DIABLO_7_UNIT 2 Diablo Canyon Unit 2 Planned 1150.00 0.00
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 12.00
DONNLS_7_UNIT Donnells Hydro Planned 72.00 72.00
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 0.63
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 27.80
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 38.70
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 10.50
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Planned/Forced 94.50 21.50
EXCLSG_1_SOLAR Excelsior Solar Forced 60.00 2.00
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30
GATES_2_SOLAR Gates Solar Station Planned 20.00 0.00
GATES_2_WSOLAR West Gates Solar Station Planned 10.00 0.00
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 562.50 8.43
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 0.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Planned 57.00 2.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Planned 95.00 36.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Planned 70.00 11.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 42.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 0.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 32.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 24.00
GIFFEN_6_SOLAR Giffen Solar Station Planned 10.00 0.00
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00
GILRPP_1_PL1X2 GILROY ENERGY CENTER UNITS 1&2 AGGREGATE Planned 95.40 95.40
GILRPP_1_PL3X4 GILROY ENERGY CENTER, UNIT #3 Planned 46.20 46.20
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00
GUERNS_6_SOLAR Guernsey Solar Station Planned 20.00 0.00
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 1.10
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 85.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 0.00
GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro Forced 3.75 2.58
HALSEY_6_UNIT HALSEY HYDRO Planned 13.50 13.50
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 3.10
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Planned 407.00 0.00
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Planned 407.00 0.00
HELMPG_7_UNIT 3 HELMS PUMP-GEN UNIT 3 Planned 404.00 0.00
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.62
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 1.17
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30
HURON_6_SOLAR Huron Solar Station Planned/Forced 20.00 0.00
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 413.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 110.00
JAKVAL_6_UNITG1 BUENA VISTA Forced 17.84 0.00
KELSO_2_UNITS Mariposa Energy Forced 198.03 1.76
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.40
KINGCO_1_KINGBR Kingsburg Cogen Planned 34.50 34.50
KINGRV_7_UNIT 1 KINGS RIVER HYDRO UNIT 1 Planned 51.20 0.00
KIRKER_7_KELCYN KELLER CANYON LANDFILL GEN FACILICITY Planned 3.56 1.85
KRNCNY_6_UNIT KERN CANYON Planned/Forced 11.50 11.50
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 0.00
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 0.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 0.00
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 11.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 12.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 17.54
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 306.00 0.00
LHILLS_6_SOLAR1 Lost Hills Solar Planned 20.00 0.00
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 47.49 4.29
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned 561.29 0.00
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 302.58
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 0.00
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 8.16
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 2.99
MNDOTA_1_SOLAR1 North Star Solar 1 Planned 60.00 0.00
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Planned/Forced 510.00 510.00
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Forced 510.00 269.00
MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 Forced 755.00 15.00
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 4.64
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Planned 12.00 12.00
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 0.00
OLDRV1_6_SOLAR Old River One Forced 20.00 1.50
ORLND_6_HIGHLI High Line Canal Hydro Planned 0.50 0.50
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Planned 10.62 1.58
PARDEB_6_UNITS Pardee Power House Planned 30.00 20.00
PGEB_2_PDRP03 PDR-A PGEB Planned 0.46 0.46
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 210.00
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
PLACVL_1_CHILIB Chili Bar Hydro Planned 8.40 8.40
PLMSSR_6_HISIER High Sierra Cogeneration Aggregate Forced 6.00 2.99
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Planned 401.00 95.00
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.15
PNOCHE_1_PL1X2 Panoche Peaker Planned 49.97 49.97
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 0.00
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.50
RUSCTY_2_UNITS Russell City Energy Center Forced 620.00 0.00
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 24.10
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 8.26
SCHNDR_1_FIVPTS Five Points Solar Station Planned 15.00 0.00
SCHNDR_1_WSTSDE Westside Solar Station Planned 15.00 0.00
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 0.73
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 209.43
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Planned 53.00 53.00
STOILS_1_UNITS Chevron Richmond Refinery Forced 113.90 113.90
STROUD_6_SOLAR Stroud Solar Station Planned 20.00 0.00
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 24.02
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 15.00
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 0.00
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 8.00
USWND2_1_WIND1 Golden Hills A Planned 42.96 0.06
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.06
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 0.00
VEGA_6_SOLAR1 Vega Solar Forced 20.00 20.00
VOLTA_6_BAILCK Bailey Creek Ranch Forced 0.63 0.63
WEBER_6_FORWRD Forward Forced 4.20 4.20
WISE_1_UNIT 1 Wise Hydro Unit 1 Planned 14.50 14.50
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Planned 18.40 4.60
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 4.00
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Planned 17.10 17.10


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 50 20 2069.35 1842.80
PGAE South 3 2 144.00 144.00
SCE Gen 102 81 4431.25 1954.09
SDGE Gen 14 17 1226.50 797.00
81 115 4713.73 2593.60
Total 250 235 12584.83 7331.49


Report Generated on:
10/25/2016 15:15:13 (PPT)
Filtered Parameters:
Date = 10/26/2016
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.