Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Forced 332.18 19.18 SCE Gen
ALTA4B_2_CPCW6 CPC West - Alta Wind 6 Planned 150.00 6.00 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Planned 42.81 42.81 SCE Gen
AVENAL_6_AVSLR1 Avenal Solar 1 Planned/Forced 7.90 0.00 PGAE South
AVENAL_6_AVSLR2 Avenal Solar 2 Planned/Forced 7.90 0.00 PGAE South
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 47.49 3.49 PGAE South
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned 820.00 462.00 SCE Gen
BIGSKY_2_SOLAR1 Antelope Big Sky Ranch Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned/Forced 13.40 8.40 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 14.05 SCE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Planned/Forced 85.00 0.00 PGAE North
BLACK_7_UNIT 2 JAMES B. BLACK 2 Planned 84.10 0.00 PGAE North
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00 SCE Gen
BLKCRK_2_SOLAR1 McCoy Station Forced 250.00 0.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDWAY_7_UNIT 3 BROADWAY UNIT 3 Forced 65.00 65.00 SCE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 3.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 1.50 SCE Gen
BUCKWD_7_WINTCV Wintec Energy, Ltd. Forced 1.32 0.66 SCE Gen
CENTRY_6_PL1X4 CENTURY GENERATING PLANT (AGGREGATE) Planned 41.40 14.40 SCE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Forced 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned 10.80 3.80 PGAE South
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 2.62 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 1.97 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 8.67 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 2.11 PGAE South
COLEMN_2_UNIT Coleman Forced 13.00 5.00 PGAE North
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 16.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 15.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 7.00 PGAE North
CPVERD_2_SOLAR Campo Verde Solar Forced 139.00 0.00 SDGE Gen
CRELMN_6_RAMON2 Ramona 2 Forced 5.00 2.00 SDGE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Planned/Forced 50.00 25.00 SDGE Gen
CSLR4S_2_SOLAR Csolar IV South Forced 130.00 0.00 SDGE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 2.13 PGAE South
DELAMO_2_SOLAR3 Golden Springs Building G Planned 1.25 0.00 SCE Gen
DELAMO_2_SOLAR4 Golden Springs Building F Forced 1.30 0.00 SCE Gen
DELAMO_2_SOLAR5 Golden Springs Building L Planned 1.00 0.00 SCE Gen
DELAMO_2_SOLAR6 Freeway Springs Planned 2.00 0.00 SCE Gen
DEVERS_1_SEPV05 SEPV 5 Forced 2.00 0.00 SCE Gen
DEVERS_1_SOLAR2 SEPV9 Forced 9.00 0.00 SCE Gen
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 12.00 PGAE South
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 0.13 PGAE South
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Forced 125.00 6.00 SCE Gen
DSRTSL_2_SOLAR1 Desert Stateline Forced 296.19 11.40 SCE Gen
DSRTSN_2_SOLAR1 Desert Sunlight 300 Forced 300.00 0.00 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Forced 250.00 0.00 SCE Gen
ELCAJN_6_UNITA1 Cuyamaca Peak Energy Plant Planned 45.42 45.42 SDGE Gen
ELDORO_7_UNIT 1 El Dorado Unit 1 Forced 11.00 11.00 PGAE North
ELDORO_7_UNIT 2 El Dorado Unit 2 Forced 11.00 11.00 PGAE North
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 2.93 PGAE South
ELNIDS_2_DODPEV Los Angeles Air Force Base Forced 0.50 0.40 SCE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Planned 48.71 48.71 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_CHMPNE Champagne Forced 1.00 0.00 SCE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 0.67 SCE Gen
ETIWND_2_UNIT1 New-Indy Ontario, LLC Forced 33.60 0.00 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned 24.00 24.00 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 1.20 SCE Gen
ETIWND_7_UNIT 3 ETIWANDA GEN STA. UNIT 3 Planned 320.00 320.00 SCE Gen
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Planned/Forced 94.50 12.50 PGAE South
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 5.50 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Forced 11.70 4.50 SCE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 562.50 0.00 PGAE South
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00 PGAE South
GILRPP_1_PL1X2 GILROY ENERGY CENTER UNITS 1&2 AGGREGATE Forced 95.40 0.00 PGAE South
GILRPP_1_PL3X4 GILROY ENERGY CENTER, UNIT #3 Forced 46.20 0.00 PGAE South
GLDFGR_6_SOLAR2 Portal Ridge C Forced 11.40 0.00 SCE Gen
GLNARM_2_UNIT 5 Glenarm Turbine 5 Forced 68.00 13.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLOW_6_SOLAR Antelope Power Plant Forced 20.00 1.00 SCE Gen
GOLETA_6_ELLWOD ELLWOOD ENERGY SUPPORT FACILITY Forced 54.00 0.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 370.00 SCE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Planned 20.00 0.00 PGAE North
GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE Forced 49.20 0.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned/Forced 144.00 72.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned/Forced 144.00 72.00 PGAE South
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Forced 407.00 0.00 PGAE South
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.32 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 0.87 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 47.00 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Forced 97.62 32.54 PGAE North
HURON_6_SOLAR Huron Solar Station Forced 20.00 0.00 PGAE South
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 1.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Planned/Forced 44.53 1.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Planned/Forced 43.69 0.69 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 14.20 SCE Gen
INLDEM_5_UNIT 2 Inland Empire Energy Center, Unit 2 Planned 366.32 9.32 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
IVANPA_1_UNIT1 Ivanpah 1 Forced 123.20 0.00 SCE Gen
IVANPA_1_UNIT3 Ivanpah 3 Forced 133.00 0.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 9.60 SCE Gen
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.30 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 12.80 SCE Gen
KILARC_2_UNIT 1 KILARC HYDRO Forced 3.20 0.00 PGAE North
KIRKER_7_KELCYN KELLER CANYON LANDFILL GEN FACILICITY Planned 3.56 1.85 PGAE South
KRAMER_1_SEGS37 LUZ SOLAR PARTNERS 3-7 AGGREGATE Planned 175.00 60.00 SCE Gen
KRNCNY_6_UNIT KERN CANYON Planned 11.50 1.00 PGAE South
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 0.00 PGAE South
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 0.00 SCE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Planned/Forced 46.10 6.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Planned/Forced 47.98 4.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Forced 180.00 15.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 12.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 13.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 306.00 0.00 PGAE South
LITLRK_6_SEPV01 Gestamp Solar 1 Forced 2.00 0.00 SCE Gen
LITLRK_6_SOLAR1 Lancaster Little Rock C Forced 5.00 0.00 SCE Gen
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 47.49 3.49 PGAE South
MANZNA_2_WIND Manzana Wind Forced 189.00 0.00 SCE Gen
MCSWAN_6_UNITS MC SWAIN HYDRO Planned 10.00 0.00 PGAE South
MERCFL_6_UNIT MERCED FALLS Planned 3.50 0.00 PGAE South
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 2.49 PGAE South
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Forced 510.00 20.00 PGAE South
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Forced 510.00 18.00 PGAE South
MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 Forced 755.00 15.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 4.58 SCE Gen
MSHGTS_6_MMARLF MIRAMAR LANDFILL Forced 5.00 2.30 SDGE Gen
MSOLAR_2_SOLAR2 Mesquite Solar 2 Forced 100.81 1.81 SDGE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 4.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Planned 44.40 0.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned 22.20 0.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Planned/Forced 22.44 1.32 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 1.70 PGAE North
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Planned 57.00 57.00 SDGE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OCTILO_5_WIND Ocotillo Wind Energy Facility Forced 265.00 50.00 SDGE Gen
OGROVE_6_PL1X2 Orange Grove Energy Center Forced 96.00 0.86 SDGE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 3.66 PGAE South
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 0.60 PGAE South
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 0.60 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 0.11 PGAE South
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 0.11 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 1.41 PGAE South
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 1.41 SCE Gen
OROLOM_1_SOLAR1 Oro Loma Solar 1 Planned/Forced 10.00 0.00 PGAE South
OROLOM_1_SOLAR2 Oro Loma Solar 2 Planned/Forced 10.00 0.00 PGAE South
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 8.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Planned 10.62 1.58 PGAE South
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 9.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned/Forced 1.92 1.92 SCE Gen
PAIGES_6_SOLAR Paige Solar Forced 20.00 20.00 PGAE South
PANDOL_6_UNIT Covanta Delano, Inc. Planned 49.00 49.00 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.55 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.55 SDGE Gen
PBLOSM_2_SOLAR PearBlossom Forced 9.50 5.59 SCE Gen
PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE Planned 95.00 40.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 2.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 2.00 PGAE North
PLAINV_6_DSOLAR Western Antelope Dry Ranch Forced 10.00 0.00 SCE Gen
PLAINV_6_NLRSR1 North Lancaster Ranch Planned/Forced 20.00 9.70 SCE Gen
PMDLET_6_SOLAR1 SEPV Palmdale East, LLC Forced 10.00 0.00 SCE Gen
PNOCHE_1_PL1X2 Panoche Peaker Forced 49.97 49.97 PGAE South
PRIMM_2_SOLAR1 Silver State South Forced 250.00 10.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Planned 359.60 75.60 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 1.30 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Forced 2.25 2.25 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Forced 140.00 0.00 SCE Gen
RSMSLR_6_SOLAR1 Rosamond One Forced 20.00 0.00 SCE Gen
RTEDDY_2_SOLAR1 Rosamond West Solar 1 Forced 55.00 33.97 SCE Gen
RTEDDY_2_SOLAR2 Rosamond West Solar 2 Forced 55.00 33.90 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 4.25 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SAUGUS_7_LOPEZ MM Lopez Energy Planned 6.10 4.09 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Planned/Forced 525.00 0.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Planned 525.00 0.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 3.93 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 130.00 SCE Gen
SKERN_6_SOLAR2 SKIC Solar Planned 10.00 4.00 PGAE South
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 0.62 PGAE North
SNCLRA_2_UNIT1 New Indy Oxnard Planned 27.80 16.80 SCE Gen
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Planned 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 8.00 PGAE South
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 2.13 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 2.84 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned 85.00 1.02 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 2.20 SCE Gen
TANHIL_6_SOLART BERRY PETROLEUM COGEN 18 AGGREGATE Planned 17.00 17.00 PGAE South
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 75.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Planned/Forced 45.00 0.00 SCE Gen
TOPAZ_2_SOLAR Topaz Solar Farms Forced 550.00 255.00 PGAE South
ULTPCH_1_UNIT 1 OGDEN POWER PACIFIC (CHINESE STATION) Planned 22.00 22.00 PGAE North
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 0.00 PGAE North
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.00 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Forced 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Planned 36.80 36.80 SCE Gen
VICTOR_1_CREST Victor Aggregate Solar Resources Forced 24.49 0.00 SCE Gen
VICTOR_1_EXSLRA Expressway Solar A Forced 2.00 0.00 SCE Gen
VICTOR_1_EXSLRB Expressway Solar B Forced 2.00 0.00 SCE Gen
VICTOR_1_VDRYFA Victor Dry Farm Ranch A Forced 5.00 0.00 SCE Gen
VICTOR_1_VDRYFB Victor Dry Farm Ranch B Forced 5.00 0.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 4.00 SCE Gen
WADHAM_6_UNIT Wadham Energy LP Forced 32.00 32.00 PGAE North
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WNDSTR_2_WIND Windstar Planned 120.00 4.00 SCE Gen
ADERA_1_SOLAR1 Adera Solar Forced 20.00 0.00
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 7.00
ARLINT_5_SCEDYN Arlington Valley CC Forced 565.00 315.00
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 128.00
BEARMT_1_UNIT Bear Mountain Limited Forced 47.49 2.49
BELDEN_7_UNIT 1 BELDEN HYDRO Planned/Forced 119.00 119.00
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 10.80
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 3.00
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 2.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 4.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00
CALFTN_2_SOLAR California Flats North Forced 130.00 130.00
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 1.40
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 47.49 0.39
CHINO_2_APEBT1 Pomona Energy Storage Forced 20.00 0.00
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COTTLE_2_FRNKNH Frankenheimer Power Plant Forced 5.30 0.00
CSTOGA_6_LNDFIL Clover Flat Land Fill Gas Forced 0.85 0.85
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 30.00
DISCOV_1_CHEVRN CHEVRON USA (EASTRIDGE) Forced 56.20 34.20
DONNLS_7_UNIT Donnells Hydro Forced 72.00 7.00
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 25.70
EXCLSG_1_SOLAR Excelsior Solar Forced 60.00 2.00
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 2.30
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 2.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 10.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 40.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 17.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 43.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 4.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 37.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 28.00
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 3.00
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 0.48
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 0.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 4.00
GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro Forced 3.75 2.46
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 14.60
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 488.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned/Forced 405.00 185.00
JAKVAL_6_UNITG1 BUENA VISTA Forced
KELSO_2_UNITS Mariposa Energy Forced 198.03 0.80
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 0.00
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 259.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 10.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 256.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 11.54
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned/Forced 561.29 0.00
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 12.78
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00
METEC_2_PL1X3 Metcalf Energy Center Planned/Forced 593.16 18.16
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned 42.42 42.42
OLIVEP_1_BATTRY White River 2 BESS Forced 2.00 0.00
PGEB_2_PDRP01 PDR-B PGEB Forced 0.90 0.90
PGEB_2_PDRP03 PDR-A PGEB Planned 0.46 0.46
PGF1_2_PDRP02 PDR-D PGF1 LEDF Forced 1.50 1.50
PGP2_2_PDRP01 PDR-C PGP2 Forced 0.10 0.10
PGSA_2_PDRP02 PDR-D PGSA Forced 1.60 1.60
PGSB_1_PDRP07 PDR-B PGSB Forced 0.18 0.18
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 210.00
PITTSP_7_UNIT 7 PITTSBURG UNIT 7 Planned 530.00 130.00
PLSNTG_7_LNCLND Lincoln Landfill Power Plant Forced 4.98 2.38
PMPJCK_1_RB2SLR Rio Bravo Solar 2 Forced 19.50 0.00
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.00
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.50
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 31.10
SCHD_1_PDRP01 PDR-F SCHD Forced 1.08 1.08
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 0.00
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 0.23
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 0.00
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 0.00
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 7.02
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 8.00
UNVRSY_1_UNIT 1 Berry Cogen 38 - Unit 1 Planned 38.00 8.00
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.06
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 3.00
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
USWPJR_2_UNITS Vasco Wind Forced 78.20 2.30
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61
VEDDER_1_SEKERN TEXACO EXPLORATION & PROD (SE KERN RIVER Forced 39.70 39.70
WESTPT_2_UNIT West Point Hydro Plant Planned 14.00 14.00
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 0.50
WLDWD_1_SOLAR1 Wildwood Solar I Forced 20.00 0.00
WLDWD_1_SOLAR2 Wildwood Solar 2 Forced 15.00 0.00
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 1.00
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 2.50
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Planned 17.10 17.10


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 6 20 281.05 76.00
PGAE South 19 42 560.94 98.97
SCE Gen 62 89 2193.16 699.38
SDGE Gen 7 18 379.70 151.13
24 93 3384.45 1664.14
Total 118 262 6799.30 2689.62


Report Generated on:
12/27/2016 15:15:00 (PPT)
Filtered Parameters:
Date = 12/28/2016
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.