Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ALAMIT_7_UNIT 1 ALAMITOS GEN STA. UNIT 1 Forced 174.56 174.56 SCE Gen
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Planned/Forced 332.18 332.18 SCE Gen
ALTA3A_2_CPCE8 Alta Wind 8 Forced 150.00 9.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 13.45 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 21.15 SCE Gen
ARBWD_6_QF Wind Resource II Forced 19.95 0.00 SCE Gen
ASTORA_2_SOLAR1 Astoria 1 Planned 100.00 0.00 SCE Gen
ASTORA_2_SOLAR2 Astoria 2 Planned 75.00 0.00 SCE Gen
AVSOLR_2_SOLAR AV SOLAR RANCH 1 Planned 241.50 0.00 SCE Gen
BALCHS_7_UNIT 2 BALCH 2 PH UNIT 2 Planned 52.50 52.50 PGAE South
BALCHS_7_UNIT 3 BALCH 2 PH UNIT 3 Planned 54.60 54.60 PGAE South
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 4.58 PGAE South
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned 820.00 217.00 SCE Gen
BIGSKY_2_SOLAR1 Antelope Big Sky Ranch Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned/Forced 13.40 4.40 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 7.80 SCE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Forced 85.00 0.00 PGAE North
BLACK_7_UNIT 2 JAMES B. BLACK 2 Forced 84.10 39.10 PGAE North
BLAST_1_WIND Mountain View IV Wind Planned 49.00 21.03 SCE Gen
BLKCRK_2_SOLAR1 McCoy Station Forced 250.00 3.60 SCE Gen
BLYTHE_1_SOLAR2 Blythe Green 1 Planned 20.00 0.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDWAY_7_UNIT 3 BROADWAY UNIT 3 Forced 65.00 65.00 SCE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 0.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
CAPWD_1_QF Edom Hills Wind Farm Forced 19.55 4.55 SCE Gen
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Planned 120.00 60.00 PGAE North
CENTER_6_PEAKER Center Peaker Forced 47.00 0.00 SCE Gen
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 0.89 SDGE Gen
CHILLS_7_UNITA1 GAS RECOVERY SYS. (SYCAMORE CANYON) Forced 2.00 2.00 SDGE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Planned 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned 10.80 0.40 PGAE South
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 3.63 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 2.98 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 9.67 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 3.13 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 0.00 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 15.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Planned 641.00 641.00 PGAE North
COPMT4_2_SOLAR4 Copper Mountain Solar 4 Forced 92.00 2.00 SCE Gen
CORONS_6_CLRWTR Clearwater Power Plant Planned 28.00 28.00 SCE Gen
CRELMN_6_RAMON2 Ramona 2 Forced 5.00 1.00 SDGE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Planned/Forced 50.00 25.00 SDGE Gen
CSLR4S_2_SOLAR Csolar IV South Planned 130.00 0.00 SDGE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 4.53 PGAE South
DEERCR_6_UNIT 1 DEER CREEK Forced 7.00 7.00 PGAE North
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 0.00 PGAE South
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 0.33 PGAE South
DRACKR_2_SOLAR1 Dracker Solar Unit 1 Planned 110.00 0.00 SCE Gen
DRUM_7_PL3X4 Drum PH 1 Units 3 & 4 Aggregate Planned 28.90 12.90 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Planned 296.19 0.00 SCE Gen
DSRTSN_2_SOLAR1 Desert Sunlight 300 Planned 300.00 0.00 SCE Gen
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Planned 22.00 22.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 0.00 SCE Gen
ELCAJN_6_UNITA1 Cuyamaca Peak Energy Plant Planned 45.42 45.42 SDGE Gen
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 0.20 PGAE South
ELNIDS_2_DODPEV Los Angeles Air Force Base Forced 0.50 0.20 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 263.68 SCE Gen
ENCINA_7_EA2 ENCINA UNIT 2 Planned 104.00 0.00 SDGE Gen
ENCINA_7_EA3 ENCINA UNIT 3 Planned 110.00 110.00 SDGE Gen
ENCINA_7_EA4 ENCINA UNIT 4 Planned 300.00 300.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.00 SDGE Gen
ESCO_6_GLMQF Goal Line Cogen Planned/Forced 49.90 49.90 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 0.00 SCE Gen
ETIWND_2_UNIT1 New-Indy Ontario, LLC Forced 33.60 28.60 SCE Gen
ETIWND_6_GRPLND Grapeland Peaker Planned 46.00 46.00 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned 24.00 24.00 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 2.10 SCE Gen
GARNET_1_SOLAR2 Garnet Solar Power Generation Station 1 Forced 4.00 0.50 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 1.50 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 3.45 SCE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 562.50 0.08 PGAE South
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00 PGAE South
GLNARM_2_UNIT 5 Glenarm Turbine 5 Forced 68.00 13.00 SCE Gen
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Planned/Forced 22.07 22.07 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLNARM_7_UNIT 3 GLEN ARM UNIT 3 Planned 44.83 44.83 SCE Gen
GLNARM_7_UNIT 4 GLEN ARM UNIT 4 Planned 42.42 42.42 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 320.00 SCE Gen
GRNLF1_1_UNITS Greenleaf 1 Forced 49.20 0.00 PGAE North
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Planned 3.04 1.03 PGAE South
HARBGN_7_UNITS HARBOR COGEN COMBINED CYCLE Planned 109.01 109.01 SCE Gen
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Forced 407.00 0.00 PGAE South
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.33 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 0.88 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 64.00 SCE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Planned 65.08 0.00 PGAE North
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Planned 44.00 44.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Planned 44.53 44.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Planned 43.69 43.69 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 0.00 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Planned 8.00 5.50 PGAE North
INTMNT_3_ANAHEIM Intermountain Power Project Forced 236.00 120.00 SCE Gen
INTMNT_3_PASADENA Intermountain Power Project Forced 107.00 68.00 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
IVANPA_1_UNIT2 Ivanpah 2 Planned 133.00 133.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 19.20 SCE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Forced 11.00 11.00 PGAE North
KERNFT_1_UNITS KERN FRONT LIMITED Planned/Forced 52.40 1.40 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Planned 25.60 6.60 SCE Gen
KILARC_2_UNIT 1 KILARC HYDRO Forced 3.20 1.83 PGAE North
KIRKER_7_KELCYN KELLER CANYON LANDFILL GEN FACILICITY Planned 3.56 0.00 PGAE South
KRNCNY_6_UNIT KERN CANYON Planned/Forced 11.50 11.50 PGAE South
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 1.16 PGAE South
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 2.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Forced 180.00 10.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 2.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 254.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 3.84 PGAE South
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 5.70 PGAE South
MANZNA_2_WIND Manzana Wind Forced 189.00 1.50 SCE Gen
MDFKRL_2_PROJCT MIDDLE FORK AND RALSTON PSP Forced 218.39 58.39 PGAE North
MERCFL_6_UNIT Merced Falls Powerhouse Forced 3.50 3.50 PGAE South
MIRLOM_2_MLBBTA Mira Loma BESS A Forced 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Forced 10.00 0.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 3.99 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 47.20 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Planned 7.99 7.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Forced 510.00 20.00 PGAE South
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Planned/Forced 510.00 510.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 9.58 SCE Gen
MSHGTS_6_MMARLF MIRAMAR LANDFILL Forced 5.00 2.30 SDGE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Planned/Forced 46.64 46.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Planned 44.40 19.10 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned 22.20 9.50 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Planned 22.44 3.96 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 2.00 PGAE North
NIMTG_6_NIQF NORTH ISLAND QF Planned 42.70 42.70 SDGE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 2 OAKLAND STATION C GT UNIT 2 Planned 55.00 55.00 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OCTILO_5_WIND Ocotillo Wind Energy Facility Forced 265.00 16.00 SDGE Gen
OGROVE_6_PL1X2 Orange Grove Energy Center Forced 96.00 0.86 SDGE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 0.00 PGAE South
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 2.80 PGAE South
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 2.80 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 1.01 PGAE South
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 1.01 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 1.91 PGAE South
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 1.91 SCE Gen
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Planned/Forced 775.00 775.00 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 3.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Planned 10.62 0.00 PGAE South
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 14.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.32 SCE Gen
PAIGES_6_SOLAR Paige Solar Planned 20.00 0.00 PGAE South
PALOMR_2_PL1X3 Palomar Energy Center Planned 575.00 575.00 SDGE Gen
PBLOSM_2_SOLAR PearBlossom Forced 9.50 0.00 SCE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 106.00 106.00 SDGE Gen
PIT1_7_UNIT 2 PIT PH 1 UNIT 2 Planned 32.00 32.00 PGAE North
PIT3_7_PL1X3 PIT PH 3 UNITS 1, 2 & 3 AGGREGATE Planned 70.60 70.60 PGAE North
PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE Planned 95.00 40.00 PGAE North
PIT5_7_PL1X2 PIT PH 5 UNITS 1 & 2 AGGREGATE Forced 82.00 82.00 PGAE North
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Forced 82.00 82.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 3.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 4.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 3.70 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 2.60 PGAE North
PMDLET_6_SOLAR1 SEPV Palmdale East, LLC Forced 10.00 1.00 SCE Gen
PMPJCK_1_SOLAR1 Pumpjack Solar I Forced 19.48 0.00 SCE Gen
POTTER_6_UNITS Potter Valley Forced 10.10 4.00 PGAE North
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Planned 359.60 61.60 SCE Gen
RDWAY_1_CREST CREST Contracts Forced 6.50 0.00 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 4.55 SCE Gen
REDOND_7_UNIT 5 REDONDO GEN STA. UNIT 5 Planned 178.87 178.87 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 0.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Forced 48.35 0.00 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Forced 48.50 0.00 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 1.34 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Planned 525.00 0.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Planned 525.00 0.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 3.85 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 0.00 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 144.00 SCE Gen
SENTNL_2_CTG5 Sentinel Unit 5 Planned 91.83 91.83 SCE Gen
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Forced 11.40 3.40 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Planned 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 11.00 PGAE South
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 3.93 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 0.00 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 85.00 3.49 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 4.63 SCE Gen
TANHIL_6_SOLART BERRY PETROLEUM COGEN 18 AGGREGATE Forced 17.00 15.00 PGAE South
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TERMEX_2_PL1X3 TDM Planned/Forced 625.00 6.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Planned 45.00 19.32 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Forced 62.00 62.00 PGAE North
TORTLA_1_SOLAR Longboat Solar Forced 20.00 0.00 SCE Gen
ULTRCK_2_UNIT Rio Bravo Rocklin Forced 28.80 28.80 PGAE North
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 0.00 PGAE North
VALLEY_5_SOLAR2 AP North Lake Solar Forced 20.00 0.00 SCE Gen
VERNON_6_MALBRG Malburg Generating Station Planned 134.00 134.00 SCE Gen
VESTAL_2_WELLHD Wellhead Power Delano Planned 49.00 49.00 SCE Gen
VICTOR_1_EXSLRA Expressway Solar A Forced 2.00 0.00 SCE Gen
VICTOR_1_EXSLRB Expressway Solar B Forced 2.00 0.00 SCE Gen
VICTOR_1_SOLAR3 Adelanto Solar 2 Forced 7.00 0.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 2.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 96.65 SCE Gen
WDLEAF_7_UNIT 1 WOODLEAF HYDRO Forced 60.00 30.00 PGAE North
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 11.50 SCE Gen
WISE_1_UNIT 2 WISE HYDRO UNIT 2 Forced 3.20 3.20 PGAE North
WNDSTR_2_WIND Windstar Planned/Forced 120.00 34.00 SCE Gen
ADERA_1_SOLAR1 Adera Solar Forced 20.00 0.00
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 8.00
ADOBEE_1_SOLAR Adobe Solar Planned 20.00 0.00
ARLINT_5_SCEDYN Arlington Valley CC Forced 565.00 315.00
BASICE_2_UNITS CALPINE AMERICAN I COGEN. Planned 135.00 135.00
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 210.00
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 4.21
BEJNLS_5_BV2SCEDYN Broadview 2 Forced 167.00 46.25
BEKWJS_5_BV1SCEDYN Broadview 1 Forced 130.00 0.00
BELDEN_7_UNIT 1 BELDEN HYDRO Planned/Forced 119.00 119.00
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.00
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 25.20
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 3.00
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 8.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 6.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 1.40
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 1.87
CLRKRD_6_LIMESD Lime Saddle Hydro Planned 2.00 2.00
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
CORRAL_6_SJOAQN Ameresco San Joaquin Forced 4.30 4.30
COWCRK_2_UNIT Cow Creek Hydro Planned 2.00 2.00
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Forced 3.20 3.20
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 880.00
DISCOV_1_CHEVRN CHEVRON USA (EASTRIDGE) Forced 56.20 34.20
DIXNLD_1_LNDFL Zero Waste Energy Forced 1.60 0.60
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 21.70
EXCLSG_1_SOLAR Excelsior Solar Forced 60.00 2.00
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 1.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Planned/Forced 57.00 57.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 34.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Planned/Forced 70.00 70.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Planned/Forced 85.00 85.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 0.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 24.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 22.00
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 0.51
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 0.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 4.00
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 58.30
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 266.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 54.00
JAYNE_6_WLSLR Westlands Solar Farm PV 1 Forced 18.00 1.00
KELSO_2_UNITS Mariposa Energy Forced 198.03 3.90
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 2.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 12.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 12.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 4.54
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned 561.29 0.00
LODI25_2_UNIT 1 LODI GAS TURBINE Planned 25.30 25.30
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 16.38
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00
METEC_2_PL1X3 Metcalf Energy Center Planned/Forced 593.16 593.16
MSTANG_2_SOLAR Mustang Forced 30.00 1.36
MSTANG_2_SOLAR4 Mustang 4 Forced 30.00 0.68
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Planned/Forced 42.42 42.42
NCPA_7_GP2UN4 NCPA GEO PLANT 2 UNIT 4 Planned 52.73 52.73
OASIS_6_CREST CREST Contracts Forced 13.50 1.50
OLIVEP_1_BATTRY White River 2 BESS Forced 2.00 0.00
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 0.00
PLMSSR_6_HISIER High Sierra Cogeneration Aggregate Forced 6.00 2.99
PNCHPP_1_PL1X2 Midway Peaking Aggregate Planned 119.91 64.32
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.20
ROSMND_6_SOLAR Lancaster B Planned 3.00 0.00
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 31.10
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Planned/Forced 332.28 1.98
SIERRA_1_UNITS HIGH SIERRA LIMITED Planned 52.43 52.43
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 172.43
SMPRIP_1_SMPSON Ripon Cogeneration Unit 1 Planned 46.05 46.05
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 0.00
SOUTH_2_UNIT SOUTH HYDRO Planned 7.10 7.10
STOILS_1_UNITS Chevron Richmond Refinery Planned 113.90 113.90
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 8.02
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
TIDWTR_2_UNITS MARTINEZ COGEN LIMITED PARTNERSHIP Planned/Forced 114.80 114.80
TRNQLT_2_SOLAR Tranquillity Forced 200.00 0.00
UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO Forced 3.50 3.50
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 8.00
UNVRSY_1_UNIT 1 Berry Cogen 38 - Unit 1 Planned 38.00 38.00
USWND2_1_WIND1 Golden Hills A Planned 42.96 0.00
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61
VOLTA_6_BAILCK Bailey Creek Ranch Planned 0.63 0.57
WESTVALL_7_UNIT 5 West Valley Unit 5 Forced 40.00 40.00
WISE_1_UNIT 1 Wise Hydro Unit 1 Forced 14.50 14.50
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 0.39
WLDWD_1_SOLAR1 Wildwood Solar I Forced 20.00 0.00
WLDWD_1_SOLAR2 Wildwood Solar 2 Forced 15.00 0.00
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 2.00
WOLFSK_1_UNITA1 Wolfskill Energy Center, Unit #1 Planned 46.90 46.90
WOODWR_1_HYDRO Quinten Luallen Forced 7.30 7.30
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 2.50
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 11 27 1342.49 1041.60
PGAE South 18 31 839.62 738.27
SCE Gen 84 76 4506.32 2940.58
SDGE Gen 11 27 1309.08 1231.02
43 93 4663.86 3144.19
Total 167 254 12661.37 9095.66


Report Generated on:
03/06/2017 15:15:12 (PPT)
Filtered Parameters:
Date = 03/07/2017
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.