Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
AGRICO_6_PL3N5 Fresno Peaker Planned 22.69 22.69 PGAE South
AGRICO_7_UNIT Fresno Cogen Planned 50.60 50.60 PGAE South
AGUCAL_5_SOLAR1 Agua Caliente Solar Planned 290.00 0.00 SDGE Gen
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Forced 332.18 7.18 SCE Gen
ALAMIT_7_UNIT 4 ALAMITOS GEN STA. UNIT 4 Planned 335.67 335.67 SCE Gen
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 6.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 6.00 SCE Gen
ALTA3A_2_CPCE8 Alta Wind 8 Forced 150.00 30.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 9.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 1.70 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 11.40 SCE Gen
ANAHM_2_CANYN4 CANYON POWER PLANT UNIT 4 Forced 49.40 0.00 SCE Gen
ASTORA_2_SOLAR2 Astoria 2 Planned 75.00 0.00 SCE Gen
ATWELL_1_SOLAR Atwell Island PV Solar Generating Faci. Planned 20.00 20.00 PGAE South
AVENAL_6_AVPARK Avenal Park Solar Project Planned 6.00 0.00 PGAE South
AVENAL_6_AVSLR1 Avenal Solar 1 Planned 7.90 0.00 PGAE South
AVENAL_6_AVSLR2 Avenal Solar 2 Planned 7.90 0.00 PGAE South
BALCHS_7_UNIT 2 BALCH 2 PH UNIT 2 Planned 52.50 52.50 PGAE South
BALCHS_7_UNIT 3 BALCH 2 PH UNIT 3 Planned 54.60 0.00 PGAE South
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 5.08 PGAE South
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned 820.00 94.00 SCE Gen
BIGSKY_2_SOLAR1 Antelope Big Sky Ranch Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Planned/Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Planned/Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Planned/Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Planned/Forced 50.00 0.00 SCE Gen
BIOMAS_1_UNIT 1 WOODLAND BIOMASS Forced 28.80 28.80 PGAE North
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned 13.40 4.40 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 7.80 SCE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Forced 85.00 4.00 PGAE North
BLACK_7_UNIT 2 JAMES B. BLACK 2 Forced 84.10 24.10 PGAE North
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00 SCE Gen
BLYTHE_1_SOLAR2 Blythe Green 1 Forced 20.00 5.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDWAY_7_UNIT 3 BROADWAY UNIT 3 Forced 65.00 65.00 SCE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 9.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
CAPWD_1_QF Edom Hills Wind Farm Forced 19.55 2.55 SCE Gen
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Planned 120.00 120.00 PGAE North
CBRLLO_6_PLSTP1 POINT LOMA SEWAGE TREATMENT PLANT Planned 4.83 4.83 SDGE Gen
CENTER_6_PEAKER Center Peaker Forced 47.00 0.00 SCE Gen
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 0.89 SDGE Gen
CHINO_6_CIMGEN O.L.S. ENERGY COMPANY -- CHINO Planned 27.75 27.75 SCE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Planned 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
CHWCHL_1_BIOMAS Chow II Biomass to Energy Planned 10.80 5.03 PGAE South
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 6.67 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 6.00 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 12.68 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 6.17 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 16.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 15.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 18.14 PGAE North
CONTRL_1_POOLE POOLE HYDRO PLANT 1 Planned 10.90 10.90 SCE Gen
CORONS_6_CLRWTR Clearwater Power Plant Planned 28.00 0.00 SCE Gen
CRELMN_6_RAMON2 Ramona 2 Forced 5.00 1.00 SDGE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Planned/Forced 50.00 25.00 SDGE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 4.53 PGAE South
DEERCR_6_UNIT 1 DEER CREEK Forced 7.00 7.00 PGAE North
DELSUR_6_SOLAR1 Summer Solar North Forced 6.50 2.00 SCE Gen
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 0.00 PGAE South
DIVSON_6_NSQF DIVISION NAVAL STATION COGEN Planned 47.00 47.00 SDGE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 0.93 PGAE South
DRACKR_2_SOLAR1 Dracker Solar Unit 1 Forced 110.00 0.00 SCE Gen
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Forced 125.00 0.00 SCE Gen
DRUM_7_PL1X2 Drum PH 1 Units 1 & 2 Aggregate Planned/Forced 26.00 13.00 PGAE North
DRUM_7_PL3X4 Drum PH 1 Units 3 & 4 Aggregate Forced 28.90 0.00 PGAE North
DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 Forced 50.00 0.00 PGAE North
DSABLA_7_UNIT De Sabla Hydro Planned 18.50 18.50 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Planned 296.19 0.00 SCE Gen
DSRTSN_2_SOLAR1 Desert Sunlight 300 Planned/Forced 300.00 0.00 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned/Forced 250.00 0.00 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Planned 147.80 73.90 PGAE South
DUTCH2_7_UNIT 1 DUTCH FLAT 2 PH Planned 26.00 0.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Forced 236.80 0.00 SCE Gen
EEKTMN_6_SOLAR1 EE K Solar 1 Forced 20.00 1.00 PGAE South
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 0.00 PGAE South
ELNIDS_2_DODPEV Los Angeles Air Force Base Forced 0.50 0.20 SCE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 0.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 0.68 SCE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ESCO_6_GLMQF Goal Line Cogen Forced 49.90 0.00 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 0.00 SCE Gen
ETIWND_2_RTS015 SPVP015 Forced 3.00 1.50 SCE Gen
ETIWND_2_RTS018 SPVP018 Fontana RT Solar Forced 1.50 1.50 SCE Gen
ETIWND_2_UNIT1 New-Indy Ontario, LLC Planned 33.60 28.60 SCE Gen
ETIWND_6_GRPLND Grapeland Peaker Forced 46.00 0.00 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Planned/Forced 24.00 24.00 SCE Gen
ETIWND_7_MIDVLY MN Mid Valley Genco LLC Planned 2.10 2.10 SCE Gen
FMEADO_7_UNIT FRENCH MEADOWS HYDRO Planned/Forced 18.00 18.00 PGAE North
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 13.50 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_WIND1 Phoenix Forced 11.20 11.20 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Forced 11.70 3.00 SCE Gen
GATES_2_SOLAR Gates Solar Station Planned 20.00 0.00 PGAE South
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 562.50 0.04 PGAE South
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00 PGAE South
GLNARM_2_UNIT 5 Glenarm Turbine 5 Forced 68.00 13.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLNARM_7_UNIT 3 GLEN ARM UNIT 3 Forced 44.83 0.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 320.00 SCE Gen
GRNLF1_1_UNITS Greenleaf 1 Planned 49.20 49.20 PGAE North
GRNLF2_1_UNIT GREENLEAF II COGEN Planned 63.75 63.75 PGAE North
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Forced 407.00 0.00 PGAE South
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.58 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 1.13 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 79.00 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 48.81 PGAE North
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Planned 44.00 4.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Planned 44.53 44.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Planned 43.69 6.07 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 0.00 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Planned/Forced 8.00 6.79 PGAE North
INTMNT_3_ANAHEIM Intermountain Power Project Forced 236.00 118.00 SCE Gen
INTMNT_3_PASADENA Intermountain Power Project Forced 107.00 63.00 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 69.00 SCE Gen
IVANPA_1_UNIT1 Ivanpah 1 Forced 123.20 38.20 SCE Gen
IVANPA_1_UNIT2 Ivanpah 2 Forced 133.00 38.00 SCE Gen
IVANPA_1_UNIT3 Ivanpah 3 Forced 133.00 8.00 SCE Gen
IVSLRP_2_SOLAR1 Silver Ridge Mount Signal Forced 200.00 0.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 1.60 SCE Gen
KEARNY_7_KY2 KEARNY GT2 AGGREGATE Planned 59.00 14.00 SDGE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Forced 11.00 11.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Planned 13.00 0.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Planned 13.00 0.00 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.90 PGAE South
KILARC_2_UNIT 1 KILARC HYDRO Forced 3.20 1.83 PGAE North
KINGRV_7_UNIT 1 KINGS RIVER HYDRO UNIT 1 Planned 51.20 51.20 PGAE South
KIRKER_7_KELCYN KELLER CANYON LANDFILL GEN FACILICITY Planned 3.56 1.91 PGAE South
KRNCNY_6_UNIT KERN CANYON Planned/Forced 11.50 11.50 PGAE South
LAGBEL_2_STG1 Bell Bandini Commerce Refuse Planned 10.05 10.05 SCE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 2.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA1_2_UNITA1 LR1 Planned 180.00 180.00 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 7.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 799.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 3.84 PGAE South
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 6.70 PGAE South
MANZNA_2_WIND Manzana Wind Forced 189.00 1.50 SCE Gen
MDFKRL_2_PROJCT MIDDLE FORK AND RALSTON PSP Forced 218.39 88.39 PGAE North
MIDWD_2_WIND2 Coram Energy Forced 3.00 0.00 SCE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Forced 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Forced 10.00 0.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 4.19 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Planned 47.20 47.20 SCE Gen
MNDALY_7_UNIT 1 MANDALAY GEN STA. UNIT 1 Planned 215.00 215.00 SCE Gen
MNDALY_7_UNIT 2 MANDALAY GEN STA. UNIT 2 Planned 215.29 215.29 SCE Gen
MNDALY_7_UNIT 3 MANDALAY GEN STA. UNIT 3 Planned 130.00 130.00 SCE Gen
MOJAVE_1_SIPHON MOJAVE SIPHON POWER PLANT Forced 12.58 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Planned 7.99 7.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOORPK_6_QF MOORPARK QFS Planned 28.59 28.59 SCE Gen
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Forced 510.00 20.00 PGAE South
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Planned 510.00 510.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 14.58 SCE Gen
MRGT_6_MEF2 Miramar Energy Facility II Planned 47.90 47.90 SDGE Gen
MRGT_6_MMAREF Miramar Energy Facility Planned/Forced 48.00 48.00 SDGE Gen
MSOLAR_2_SOLAR1 Mesquite Solar 1 Forced 165.00 0.00 SCE Gen
MSOLAR_2_SOLAR2 Mesquite Solar 2 Forced 100.81 0.00 SDGE Gen
MSOLAR_2_SOLAR3 Mesquite Solar 3, LLC Forced 152.00 0.00 SDGE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 6.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 13.20 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Forced 22.20 3.60 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 9.64 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 2.00 PGAE North
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 2.00 SDGE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 28.00 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned/Forced 3.80 3.80 PGAE South
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 4.10 PGAE South
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 4.10 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 2.21 PGAE South
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 2.21 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 2.11 PGAE South
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 2.11 SCE Gen
ORMOND_7_UNIT 1 ORMOND BEACH GEN STA. UNIT 1 Planned/Forced 741.27 741.27 SCE Gen
OTAY_6_PL1X2 Chula Vista Energy Center, LLC Planned 35.50 35.50 SDGE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Planned 603.68 603.68 SDGE Gen
OXBOW_6_DRUM OXBOW HYDRO Forced 6.00 6.00 PGAE North
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Planned 10.62 1.58 PGAE South
PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) Forced 28.80 23.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 0.00 SCE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 106.00 106.00 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 106.00 0.00 SDGE Gen
PIT3_7_PL1X3 PIT PH 3 UNITS 1, 2 & 3 AGGREGATE Planned/Forced 70.60 46.60 PGAE North
PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE Planned 95.00 41.00 PGAE North
PIT5_7_PL1X2 PIT PH 5 UNITS 1 & 2 AGGREGATE Forced 82.00 82.00 PGAE North
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Forced 82.00 82.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 3.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 4.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 3.70 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 2.60 PGAE North
POTTER_6_UNITS Potter Valley Forced 10.10 4.00 PGAE North
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Planned 635.00 215.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Planned 359.60 95.60 SCE Gen
RDWAY_1_CREST CREST Contracts Forced 6.50 0.00 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Planned/Forced 505.96 505.96 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 1.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Forced 140.00 6.00 SCE Gen
ROSMND_6_SOLAR Lancaster B Planned/Forced 3.00 0.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 620.00 0.00 PGAE South
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Forced 48.50 48.50 SCE Gen
SAMPSN_6_KELCO1 KELCO QUALIFYING FACILITY Forced 25.00 15.70 SDGE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Forced 31.00 1.50 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 0.00 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 525.00 0.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Planned/Forced 525.00 525.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 0.00 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 0.00 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Planned 525.00 170.00 SCE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 2.00 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Forced 11.40 2.10 PGAE North
SPI LI_2_UNIT 1 Lincoln Biomass Planned 17.20 0.00 PGAE North
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Forced 7.00 0.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Planned 6.40 6.40 SCE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Planned/Forced 248.00 11.00 PGAE South
SUNSHN_2_LNDFL Sunshine Gas Producers Forced 20.00 6.00 SCE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 3.57 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned 85.00 4.80 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned 85.00 2.82 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned 85.00 4.18 SCE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TERMEX_2_PL1X3 TDM Planned 625.00 625.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 19.30 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Planned/Forced 62.00 62.00 PGAE North
TOADTW_6_UNIT TOAD TOWN Planned 1.50 1.50 PGAE North
TOPAZ_2_SOLAR Topaz Solar Farms Planned 550.00 0.00 PGAE South
TRNSWD_1_QF FPL Energy C Wind Forced 38.97 30.47 SCE Gen
VALLEY_5_SOLAR2 AP North Lake Solar Forced 20.00 0.00 SCE Gen
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 0.00 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Forced 5.75 5.75 SCE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Forced 5.75 5.75 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Forced 60.00 4.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned/Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WALNUT_7_WCOVST MM West Covina - ST Unit Planned 6.50 6.50 SCE Gen
WARNE_2_UNIT WARNE HYDRO AGGREGATE Planned 76.00 76.00 SCE Gen
WDLEAF_7_UNIT 1 WOODLEAF HYDRO Forced 60.00 20.00 PGAE North
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 11.50 SCE Gen
WNDSTR_2_WIND Windstar Planned 120.00 4.00 SCE Gen
YUBACT_1_SUNSWT YUBA CITY COGEN Forced 49.97 0.00 PGAE North
ADERA_1_SOLAR1 Adera Solar Forced 20.00 20.00
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 8.00
ARLINT_5_SCEDYN Arlington Valley CC Forced 565.00 315.00
AVENAL_6_SANDDG Sand Drag Solar Project Planned 19.00 0.00
AVENAL_6_SUNCTY Sun City Solar Project Planned 20.00 0.00
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 148.00
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 4.21
BELDEN_7_UNIT 1 BELDEN HYDRO Planned/Forced 119.00 119.00
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 0.70
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 7.20
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 6.00
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 8.00
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 8.50
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00
BUCKCK_7_OAKFLT Oak Flat Forced 1.30 1.30
BURNYF_2_UNIT 1 Burney Forest Power Planned 35.70 35.70
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 1.40
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 6.67
CNTRVL_6_UNIT Centerville Forced 6.40 6.40
COGNAT_1_UNIT Stockton Biomas Planned/Forced 48.00 48.00
CONTAN_1_UNIT Graphic Packaging Cogen Planned 27.70 27.70
CORRAL_6_SJOAQN Ameresco San Joaquin Planned 4.30 2.59
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 880.00
DONNLS_7_UNIT Donnells Hydro Forced 72.00 7.00
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 28.70
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 0.00
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 0.40
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 3.00
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 39.00
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 20.00
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 42.00
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 0.00
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 34.00
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 25.00
GRZZLY_1_BERKLY PE - BERKELEY, INC. Planned 32.50 32.50
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 1.02
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 0.00
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Planned/Forced 82.00 82.00
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 7.70
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 933.10
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 13.00
KELSO_2_UNITS Mariposa Energy Forced 198.03 1.76
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 5.80
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Planned 260.20 260.20
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 14.15
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 7.54
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned 561.29 0.00
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 12.78
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00
MARCPW_6_SOLAR1 Maricopa West Solar PV Forced 20.00 20.00
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 0.00
MSTANG_2_SOLAR Mustang Forced 30.00 0.68
MSTANG_2_SOLAR3 Mustang 3 Forced 40.00 0.68
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42
OLIVEP_1_BATTRY White River 2 BESS Forced 2.00 2.00
PHOENX_1_UNIT PHOENIX PH Forced 2.00 0.00
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 0.00
PLMSSR_6_HISIER High Sierra Cogeneration Aggregate Planned 6.00 2.99
PLSNTG_7_LNCLND Lincoln Landfill Power Plant Forced 4.98 1.68
PMPJCK_1_SOLAR2 Rio Bravo Solar 1 Planned 19.50 0.00
PNCHPP_1_PL1X2 Midway Peaking Aggregate Planned/Forced 119.91 0.00
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Planned/Forced 52.01 4.01
REEDLY_6_SOLAR Terzian Planned 1.23 1.23
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.50
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 35.10
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 7.93
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 1.03
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 72.43
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 0.00
SOUTH_2_UNIT SOUTH HYDRO Planned 7.10 7.10
SPIAND_1_ANDSN2 SPI Anderson 2 Planned 27.15 0.00
STOILS_1_UNITS Chevron Richmond Refinery Planned 113.90 113.90
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 20.02
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00
TRNQLT_2_SOLAR Tranquillity Forced 200.00 2.00
UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO Forced 3.50 2.50
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 8.00
USWND2_1_WIND1 Golden Hills A Planned 42.96 1.79
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61
VEDDER_1_SEKERN TEXACO EXPLORATION & PROD (SE KERN RIVER Forced 39.70 36.70
VOLTA_6_BAILCK Bailey Creek Ranch Planned 0.63 0.57
WESTPT_2_UNIT West Point Hydro Plant Planned 14.00 14.00
WISE_1_UNIT 1 Wise Hydro Unit 1 Forced 14.50 0.00
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 0.39
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 3.00
WOODWR_1_HYDRO Quinten Luallen Forced 7.30 7.30
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 2.50
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE North 25 37 942.00 549.75
PGAE South 24 31 945.01 726.82
SCE Gen 76 97 5668.28 4026.87
SDGE Gen 12 19 1773.87 1697.91
35 82 4232.08 3238.55
Total 172 266 13561.24 10239.90


Report Generated on:
04/18/2017 15:15:00 (PPT)
Filtered Parameters:
Date = 04/19/2017
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.