Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 22.00 PGAE Gen
ALLGNY_6_HYDRO1 Salmon Creek Hydroelectric Project Forced 0.52 0.52 PGAE Gen
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 3.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 0.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 7.15 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 35.40 SCE Gen
ARCOGN_2_UNITS WATSON COGENERATION Planned 416.60 208.60 SCE Gen
ARVINN_6_ORION1 Orion 1 Solar Forced 12.00 0.00 PGAE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 228.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 6.08 PGAE South
BEARDS_7_UNIT 1 Beardsley Hydro Planned 11.50 0.00 PGAE Gen
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 5.21 PGAE Gen
BEJNLS_5_BV2SCEDYN Broadview 2 Forced 167.00 15.00 SCE Gen
BEKWJS_5_BV1SCEDYN Broadview 1 Forced 130.00 12.00 SCE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 2.00 PGAE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 420.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned/Forced 13.40 4.00 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Forced 15.80 4.75 SCE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 5.40 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 2.30 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 15.00 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 4.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 2.50 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 0.00 SCE Gen
BUCKCK_7_OAKFLT Oak Flat Forced 1.30 1.30 PGAE Gen
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Forced 59.00 1.75 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
BURNYF_2_UNIT 1 Burney Forest Power Forced 35.70 0.00 PGAE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Forced 39.50 3.50 PGAE North
CALFTN_2_SOLAR California Flats North Planned 130.00 0.00 PGAE Gen
CALGEN_1_UNITS Coso Navy 1 Planned 92.20 0.00 SCE Gen
CALPIN_1_AGNEW Agnews Power Plant Planned 28.00 0.00 PGAE Gen
CAMLOT_2_SOLAR1 Camelot Forced 45.00 1.70 SCE Gen
CAPWD_1_QF Edom Hills Wind Farm Planned 19.55 2.00 SCE Gen
CAYTNO_2_VASCO Vasco Road Forced 4.30 2.15 PGAE Gen
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Forced 5.25 5.25 SDGE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 3.11 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 2.37 PGAE Gen
CHEVCO_6_UNIT 2 AERA ENERGY LLC. (COALINGA) Planned 12.50 0.00 PGAE Gen
CHEVCO_6_UNIT 2 AERA ENERGY LLC. (COALINGA) Planned 12.50 0.00 PGAE South
CHICPK_7_UNIT 1 Chicago Park Powerhouse Planned 42.00 42.00 PGAE North
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 1.05 SDGE Gen
CHINO_6_CIMGEN O.L.S. ENERGY COMPANY -- CHINO Forced 27.75 27.75 SCE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Planned 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 9.60 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 8.92 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 15.60 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 9.11 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 20.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 19.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 18.14 PGAE North
COLVIL_7_PL1X2 COLLIERVILLE HYDRO UNIT 1 & 2 AGGREGATE Planned 246.86 136.86 PGAE Gen
CONTRL_1_LUNDY LUNDY Forced 3.00 2.00 SCE Gen
CONTRL_1_POOLE POOLE HYDRO PLANT 1 Planned 10.90 10.90 SCE Gen
COVERD_2_HCKHY1 HATCHET CREEK Forced 6.89 6.89 PGAE Gen
COVERD_2_RCKHY1 ROARING CREEK Forced 2.00 2.00 PGAE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Planned 70.40 35.20 PGAE North
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Forced 3.20 0.00 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20 PGAE Gen
CROKET_7_UNIT CROCKETT COGEN Planned 240.00 240.00 PGAE North
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 0.00 SDGE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 1.43 PGAE South
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.40 PGAE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 880.00 PGAE Gen
DINUBA_6_UNIT DINUBA GENERATION PROJECT Forced 12.00 0.00 PGAE South
DIXNLD_1_LNDFL Zero Waste Energy Forced 1.60 1.60 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 1.03 PGAE South
DRACKR_2_SOLAR1 Dracker Solar Unit 1 Forced 110.00 3.00 SCE Gen
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Forced 125.00 19.00 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 198.00 SCE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 0.00 SDGE Gen
ELDORO_7_UNIT 1 El Dorado Unit 1 Planned 11.00 11.00 PGAE North
ELDORO_7_UNIT 2 El Dorado Unit 2 Planned 11.00 11.00 PGAE North
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 19.70 PGAE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 0.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 0.68 SCE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned/Forced 2.56 2.06 SCE Gen
ETIWND_2_UNIT1 New-Indy Ontario, LLC Forced 33.60 29.60 SCE Gen
ETIWND_6_GRPLND Grapeland Peaker Forced 47.39 2.00 SCE Gen
EXCLSG_1_SOLAR Excelsior Solar Forced 60.00 4.00 PGAE Gen
FMEADO_7_UNIT FRENCH MEADOWS HYDRO Forced 18.00 8.00 PGAE North
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WIND GARNET WIND ENERGY CENTER Forced 6.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 3.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Forced 11.70 3.00 SCE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Planned 562.50 562.50 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 0.40 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 11.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 43.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 23.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 42.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 2.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 30.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 24.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00 PGAE South
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_ELLWOD ELLWOOD ENERGY SUPPORT FACILITY Forced 54.00 54.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 305.00 SCE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Planned 20.00 20.00 PGAE North
GRNLF1_1_UNITS Greenleaf 1 Forced 49.20 0.00 PGAE North
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GWFPWR_1_UNITS HANFORD PEAKER PLANT Forced 98.46 0.63 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Planned/Forced 85.00 85.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 0.00 PGAE Gen
HALSEY_6_UNIT HALSEY HYDRO Planned/Forced 13.50 13.50 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.80 PGAE Gen
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Planned/Forced 407.00 407.00 PGAE South
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Planned 407.00 407.00 PGAE South
HELMPG_7_UNIT 3 HELMS PUMP-GEN UNIT 3 Planned 404.00 404.00 PGAE South
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.39 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 0.94 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 80.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.30 PGAE Gen
HNTGBH_7_UNIT 2 HUNTINGTON BEACH GEN STA. UNIT 2 Forced 225.80 0.00 SCE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Forced 65.08 32.54 PGAE North
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Forced 97.62 32.54 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 651.10 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 6.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 6.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 5.69 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 0.00 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned/Forced 405.00 280.00 PGAE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
IVANPA_1_UNIT3 Ivanpah 3 Planned 133.00 133.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 3.20 SCE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Forced 11.00 11.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Planned 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Planned 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Planned 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Planned 12.80 12.80 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.60 PGAE South
KERNRG_1_UNITS South Belridge Cogen Facility Forced 55.20 0.00 PGAE South
KILARC_2_UNIT 1 KILARC HYDRO Forced 3.20 1.60 PGAE North
KRNCNY_6_UNIT KERN CANYON Planned/Forced 11.50 11.50 PGAE South
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 0.00 PGAE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 2.26 PGAE South
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 0.00 PGAE Gen
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 22.80 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 13.20 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 12.15 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 119.54 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 3.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LASSEN_6_UNITS Honey Lake Power Forced 30.00 17.99 PGAE North
LEBECS_2_UNITS Pastoria Energy Facility Planned/Forced 799.47 19.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 86.84 PGAE South
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 5.30 PGAE South
LMBEPK_2_UNITA1 Lambie Energy Center, Unit #1 Planned 47.50 0.00 PGAE Gen
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned/Forced 561.29 0.00 PGAE Gen
LODI25_2_UNIT 1 LODI GAS TURBINE Forced 23.80 23.80 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 15.48 PGAE Gen
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 0.00 SCE Gen
MDFKRL_2_PROJCT MIDDLE FORK AND RALSTON PSP Planned/Forced 218.39 218.39 PGAE North
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 13.16 PGAE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Forced 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Forced 10.00 0.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.49 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 0.00 SCE Gen
MNDOTA_1_SOLAR2 Citizen Solar B Forced 5.00 1.00 PGAE Gen
MOJAVW_2_SOLAR Mojave West Forced 20.00 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Planned 7.99 7.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MOORPK_6_QF MOORPARK QFS Planned 28.59 28.59 SCE Gen
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Planned 510.00 510.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 14.58 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 14.58 SDGE Gen
MRGT_6_MEF2 Miramar Energy Facility II Forced 47.90 3.90 SDGE Gen
MRGT_6_MMAREF Miramar Energy Facility Forced 48.00 4.00 SDGE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 19.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 7.20 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 3.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Planned/Forced 22.44 0.00 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 39.20 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 2.00 SDGE Gen
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Planned 12.00 12.00 PGAE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OASIS_6_SOLAR2 Oasis Solar Forced 20.00 2.50 SCE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 3.61 PGAE South
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 3.50 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 2.31 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 2.61 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Planned 603.68 603.68 SDGE Gen
OXBOW_6_DRUM OXBOW HYDRO Planned 6.00 6.00 PGAE North
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 10.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Forced 1.92 1.02 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.68 SCE Gen
PARDEB_6_UNITS Pardee Power House Planned 30.00 10.00 PGAE Gen
PGP2_2_PDRP06 PDR-D PGP2 Forced 0.40 0.00 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned/Forced 210.00 167.00 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 112.00 3.51 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.00 0.18 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 2.80 SDGE Gen
PIT1_7_UNIT 2 PIT PH 1 UNIT 2 Planned 32.00 32.00 PGAE North
PIT5_7_PL1X2 PIT PH 5 UNITS 1 & 2 AGGREGATE Forced 82.00 42.00 PGAE North
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Forced 82.00 82.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Planned/Forced 39.00 39.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Planned/Forced 40.00 7.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 3.70 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 2.60 PGAE North
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 3.00 SCE Gen
PLMSSR_6_HISIER High Sierra Cogeneration Aggregate Planned 6.00 2.99 PGAE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.00 PGAE Gen
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
PTLOMA_6_NTCCGN AEI MCRD STEAM TURBINE Forced 2.58 2.58 SDGE Gen
PTLOMA_6_NTCQF NTC/MCRD COGENERATION Forced 22.30 22.30 SDGE Gen
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Planned 635.00 214.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 115.60 SCE Gen
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Planned 57.00 57.00 PGAE North
RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 Planned 56.90 56.90 PGAE North
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Planned/Forced 6.55 6.55 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned 2.25 2.25 SCE Gen
REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 Forced 175.00 25.00 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
RHONDO_2_QF RIO HONDO QFS Forced 4.98 4.98 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.50 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Forced 140.00 10.00 SCE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Forced 140.00 10.00 SDGE Gen
RUSCTY_2_UNITS Russell City Energy Center Planned 620.00 620.00 PGAE South
RVRVEW_1_UNITA1 Riverview Energy Center (GP Antioch) Planned 48.70 48.70 PGAE Gen
RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 Forced 49.00 0.00 SCE Gen
RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 Forced 49.00 0.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Forced 48.35 0.00 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Forced 48.50 0.00 SCE Gen
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Planned 46.00 34.00 PGAE North
SAMPSN_6_KELCO1 KELCO QUALIFYING FACILITY Forced 25.00 25.00 SDGE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 35.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Forced 31.00 0.60 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 525.00 525.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Planned 525.00 525.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Forced 6.95 5.65 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Forced 3.93 2.03 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 123.01 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 332.28 2.26 PGAE Gen
SENTNL_2_CTG2 Sentinel Unit 2 Forced 92.40 92.40 SCE Gen
SENTNL_2_CTG5 Sentinel Unit 5 Forced 91.83 91.83 SCE Gen
SGREGY_6_SANGER Algonquin Power Sanger 2 Planned 48.30 0.00 PGAE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 1.13 PGAE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 102.43 PGAE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 1.67 PGAE North
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 0.00 PGAE Gen
SNDBAR_7_UNIT 1 SANDBAR Planned 16.20 0.00 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Planned 11.40 7.00 PGAE North
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Planned 7.00 7.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Planned/Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STANIS_7_UNIT 1 STANISLAUS HYDRO Planned 91.00 91.00 PGAE North
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 15.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 13.00 PGAE South
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00 PGAE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 85.00 5.27 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 85.00 2.41 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 85.00 5.53 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 85.00 1.76 SCE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 0.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Planned/Forced 45.00 1.00 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Planned 62.00 31.00 PGAE North
TRNQLT_2_SOLAR Tranquillity Forced 200.00 4.00 PGAE Gen
TRNSWD_1_QF FPL Energy C Wind Forced 38.97 31.47 SCE Gen
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 19.00 PGAE Gen
USWND2_1_WIND1 Golden Hills A Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 2.30 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 1.85 PGAE North
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Planned 50.61 26.61 PGAE Gen
VALLEY_7_BADLND VALLEY_7_BADLND Forced 1.30 1.30 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 17.10 SCE Gen
VICTOR_1_SOLAR3 Adelanto Solar 2 Forced 7.00 0.00 SCE Gen
VICTOR_1_SOLAR4 Adelanto Solar Forced 20.00 0.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Forced 60.00 5.00 SCE Gen
VOLTA_6_BAILCK Bailey Creek Ranch Planned 0.63 0.57 PGAE Gen
WADHAM_6_UNIT Wadham Energy LP Planned/Forced 32.00 32.00 PGAE North
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SCE Gen
WALNUT_6_HILLGEN Puente Hills Forced 47.00 29.00 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 15.50 SCE Gen
WISE_1_UNIT 1 Wise Hydro Unit 1 Planned 14.50 14.50 PGAE Gen
WISE_1_UNIT 2 WISE HYDRO UNIT 2 Planned 3.20 3.20 PGAE North
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Planned/Forced 18.40 0.80 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Planned/Forced 38.00 38.00 PGAE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 1.50 PGAE Gen
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
GYSRVL_7_WSPRNG Warm Springs Hydro Forced 3.75 3.75
LAROA2_2_UNITA1 LR2 Forced 322.00 12.00
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00
MARCPW_6_SOLAR1 Maricopa West Solar PV Forced 20.00 2.00
TWISSL_6_SOLAR Nickel 1 ("NLH1") Forced 1.50 0.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
PGAE Gen 34 98 3932.25 1808.33
PGAE North 27 28 1364.01 995.14
PGAE South 13 26 3144.94 2947.80
SCE Gen 32 126 3939.56 1849.94
SDGE Gen 2 24 712.20 658.81
0 5 17.75 3.75
Total 108 307 13110.71 8263.77


Report Generated on:
10/21/2017 15:15:25 (PPT)
Filtered Parameters:
Date = 10/22/2017
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.