Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 11.00 PGAE Gen
AGUCAL_5_SOLAR1 Agua Caliente Solar Planned 290.00 0.00 SDGE Gen
ALAMIT_7_UNIT 6 ALAMITOS GEN STA. UNIT 6 Planned/Forced 495.00 495.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 3.40 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 42.81 SCE Gen
ARLINT_5_SCEDYN Arlington Valley CC Forced 565.00 565.00 EIM ARI
ASTORA_2_SOLAR1 Astoria 1 Planned 100.00 0.00 SCE Gen
AVENAL_6_AVPARK Avenal Park Solar Project Planned 6.00 0.00 PGAE South
AVENAL_6_AVSLR1 Avenal Solar 1 Planned 7.90 0.00 PGAE South
AVENAL_6_AVSLR2 Avenal Solar 2 Planned 7.90 0.00 PGAE South
AVENAL_6_SANDDG Sand Drag Solar Project Planned 19.00 0.00 PGAE Gen
AVENAL_6_SUNCTY Sun City Solar Project Planned 20.00 0.00 PGAE Gen
AVSOLR_2_SOLAR AV SOLAR RANCH 1 Planned 241.50 0.00 SCE Gen
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 146.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 48.08 PGAE South
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 4.21 PGAE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 0.00 PGAE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 785.00 SCE Gen
BIGSKY_2_BSKSR6 Big Sky Solar 6 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR8 Big Sky Solar 8 Forced 20.00 2.50 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 9.30 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 10.30 SCE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Forced 85.00 2.00 PGAE North
BLACK_7_UNIT 2 JAMES B. BLACK 2 Forced 84.10 1.10 PGAE North
BLAST_1_WIND Mountain View IV Wind Forced 49.00 0.00 SCE Gen
BLCKBT_2_STONEY BLACK BUTTE HYDRO Forced 6.20 6.20 PGAE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 16.20 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 9.20 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 3.00 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 8.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 8.50 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 1.60 PGAE Gen
BREGGO_6_SOLAR NRG Borrego Solar One Forced 26.00 23.00 SDGE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 9.00 SCE Gen
BUCKBL_2_PL1X3 Blythe Energy Center Forced 493.63 323.63 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Planned 39.50 39.50 PGAE North
CANTUA_1_SOLAR Cantua Solar Station Planned 20.00 20.00 PGAE South
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Planned 120.00 60.00 PGAE North
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Forced 5.25 5.25 SDGE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 2.07 PGAE Gen
CHICPK_7_UNIT 1 Chicago Park Powerhouse Forced 42.00 0.00 PGAE North
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 0.97 SDGE Gen
CHINO_6_CIMGEN O.L.S. ENERGY COMPANY -- CHINO Planned 27.75 27.75 SCE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Planned 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 0.00 SCE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 1.71 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 1.07 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 7.76 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 1.20 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 20.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 19.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 18.44 PGAE North
COLVIL_7_PL1X2 COLLIERVILLE HYDRO UNIT 1 & 2 AGGREGATE Planned 246.86 16.86 PGAE Gen
CONTRL_1_LUNDY LUNDY Forced 3.00 2.00 SCE Gen
CONTRL_1_POOLE POOLE HYDRO PLANT 1 Planned 10.90 10.90 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Forced 11.94 11.24 SCE Gen
COPMT4_2_SOLAR4 Copper Mountain Solar 4 Planned 92.00 0.00 SCE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Forced 70.40 0.00 PGAE North
CRNEVL_6_CRNVA Crane Valley Forced 0.90 0.00 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20 PGAE Gen
CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN Planned 7.00 7.00 PGAE South
CSLR4S_2_SOLAR Csolar IV South Planned 130.00 0.00 SDGE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 1.13 PGAE South
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 880.00 PGAE Gen
DEVERS_1_SOLAR1 SEPV8 Planned 12.00 0.00 SCE Gen
DEXZEL_1_UNIT Western Power and Steam Cogeneration Forced 20.00 0.00 PGAE Gen
DIABLO_7_UNIT 2 Diablo Canyon Unit 2 Planned 1150.00 1150.00 PGAE South
DINUBA_6_UNIT Dinuba Energy, Inc. Forced 12.00 12.00 PGAE South
DIVSON_6_NSQF DIVISION NAVAL STATION COGEN Planned 47.00 47.00 SDGE Gen
DONNLS_7_UNIT Donnells Hydro Forced 72.00 3.00 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 0.33 PGAE South
DRUM_7_PL1X2 Drum PH 1 Units 1 & 2 Aggregate Planned 26.00 26.00 PGAE North
DRUM_7_PL3X4 Drum PH 1 Units 3 & 4 Aggregate Forced 28.90 0.00 PGAE North
DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 Forced 50.00 0.00 PGAE North
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Forced 22.00 0.00 PGAE North
DUTCH2_7_UNIT 1 DUTCH FLAT 2 PH Forced 26.00 0.00 PGAE North
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 123.00 EIM ARI
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 123.00 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Forced 7.50 0.00 SDGE Gen
ELCAJN_6_UNITA1 Cuyamaca Peak Energy Plant Forced 45.42 0.00 SDGE Gen
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 21.70 PGAE Gen
ENCINA_7_EA2 ENCINA UNIT 2 Forced 104.00 104.00 SDGE Gen
ENCINA_7_EA3 ENCINA UNIT 3 Forced 110.00 110.00 SDGE Gen
ENCINA_7_EA4 ENCINA UNIT 4 Planned 300.00 60.00 SDGE Gen
ENCINA_7_EA5 ENCINA UNIT 5 Planned/Forced 330.00 330.00 SDGE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Forced 48.71 0.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 1.56 SCE Gen
ETIWND_2_RTS010 SPVP010 Fontana RT Solar Forced 1.50 1.00 SCE Gen
ETIWND_2_RTS017 SPVP017 Forced 3.50 1.50 SCE Gen
ETIWND_2_UNIT1 New Indy Ontario Forced 33.60 29.60 SCE Gen
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Planned 94.50 94.50 PGAE South
GANSO_1_WSTBM1 Weststar Dairy Biogas Forced 1.00 0.00 PGAE Gen
GARLND_2_GASLR Garland B Forced 180.00 2.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_DIFWD1 Difwind Forced 7.88 0.00 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned/Forced 11.70 0.50 SCE Gen
GASKW1_2_GW1SR1 Gaskell West 1 Forced 20.00 0.00 SCE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 585.00 17.04 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 0.40 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 2.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 43.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 14.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 38.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 0.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 35.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 22.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00 PGAE South
GLNARM_2_UNIT 5 Glenarm Turbine 5 Planned 65.81 65.81 SCE Gen
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Planned 22.07 22.07 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Planned/Forced 22.30 22.30 SCE Gen
GLNARM_7_UNIT 3 GLEN ARM UNIT 3 Planned 44.83 44.83 SCE Gen
GLNARM_7_UNIT 4 GLEN ARM UNIT 4 Planned 42.42 42.42 SCE Gen
GLOW_6_SOLAR Antelope Power Plant Forced 20.00 0.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 570.00 SCE Gen
GRNLF1_1_UNITS Greenleaf 1 Forced 49.20 0.00 PGAE North
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 3.80 PGAE Gen
GRZZLY_1_BERKLY Berkeley Cogeneration Forced 26.35 0.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Forced 98.46 49.23 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 37.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 37.00 PGAE Gen
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned 144.00 72.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned 144.00 72.00 PGAE South
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.80 PGAE Gen
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.44 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 0.99 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 56.00 SCE Gen
HINSON_6_CARBGN BP WILMINGTON CALCINER Planned 30.00 30.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.80 PGAE Gen
HNTGBH_7_UNIT 1 HUNTINGTON BEACH GEN STA. UNIT 1 Planned 225.75 225.75 SCE Gen
HNTGBH_7_UNIT 2 HUNTINGTON BEACH GEN STA. UNIT 2 Planned 225.80 225.80 SCE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Planned 65.08 16.27 PGAE North
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Forced 97.62 16.27 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 153.10 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 7.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 7.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 5.69 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 12.20 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned/Forced 405.00 295.00 PGAE Gen
INTMNT_3_ANAHEIM Intermountain Power Project Forced 236.00 0.00 SCE Gen
INTMNT_3_PASADENA Intermountain Power Project Planned 107.00 0.00 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
IVANPA_1_UNIT1 Ivanpah 1 Planned 126.00 126.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 0.00 SCE Gen
KELSO_2_UNITS Mariposa Energy Forced 198.03 126.43 PGAE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Forced 11.00 11.00 PGAE North
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.30 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Planned 25.60 25.60 SCE Gen
KINGRV_7_UNIT 1 KINGS RIVER HYDRO UNIT 1 Planned 51.20 51.20 PGAE South
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 3.29 PGAE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 1.00 PGAE South
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 259.80 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 10.20 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 10.15 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 119.54 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 3.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 7.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned/Forced 799.47 0.00 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 0.00 PGAE South
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 3.80 PGAE South
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned 561.29 0.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 18.78 PGAE Gen
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 3.00 SCE Gen
MARCPW_6_SOLAR1 Maricopa West Solar PV Forced 20.00 2.00 PGAE Gen
MERCFL_6_UNIT Merced Falls Powerhouse Planned 3.50 3.50 PGAE South
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 12.16 PGAE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Forced 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Forced 10.00 0.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.49 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 1.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Forced 11.00 11.00 SCE Gen
MONLTS_2_MONWD4 Monolith 4 Forced 4.75 0.00 SCE Gen
MONLTS_2_MONWD5 Monolith 5 Forced 4.04 0.00 SCE Gen
MONLTS_2_MONWD6 Monolith 6 Forced 5.25 0.00 SCE Gen
MONLTS_2_MONWD7 Monolith 7 Forced 4.76 0.00 SCE Gen
MONTPH_7_UNITS MONTICELLO HYDRO AGGREGATE Planned 12.50 1.50 PGAE Gen
MOORPK_6_QF MOORPARK QFS Planned 28.59 0.00 SCE Gen
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Planned 510.00 0.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 9.58 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 9.58 SDGE Gen
MRGT_6_MEF2 Miramar Energy Facility II Planned 47.90 47.90 SDGE Gen
MRGT_6_MMAREF Miramar Energy Facility Planned/Forced 48.00 2.00 SDGE Gen
MSTANG_2_SOLAR3 Mustang 3 Forced 40.00 2.04 PGAE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Planned 46.64 46.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Forced 44.40 0.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 1.98 SCE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Forced 12.00 12.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 43.60 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 3.00 EIM ARI
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 3.00 SDGE Gen
NIMTG_6_NIQF NORTH ISLAND QF Planned 42.70 42.70 SDGE Gen
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Forced 12.00 0.00 PGAE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 3.62 PGAE South
OLDRIV_6_CESDBM Ces Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLDRIV_6_LKVBM1 Lakeview Dairy Biogas Forced 1.00 0.00 PGAE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 1.40 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 0.21 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 1.41 SCE Gen
OTAY_6_UNITB1 OTAY LANDFILL UNITS AGGREGATE Forced 3.00 3.00 SDGE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 3.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 4.02 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.02 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.68 SCE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 81.00 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 112.00 0.80 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 0.00 SDGE Gen
PIT1_7_UNIT 2 PIT PH 1 UNIT 2 Planned 32.00 32.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 39.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 1.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 8.70 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 7.60 PGAE North
PLACVL_1_CHILIB Chili Bar Hydro Planned 8.40 8.40 PGAE Gen
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 3.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.00 PGAE Gen
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Forced 69.00 0.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Forced 68.50 0.00 PGAE North
PTLOMA_6_NTCCGN AEI MCRD STEAM TURBINE Planned 2.58 2.58 SDGE Gen
PTLOMA_6_NTCQF NTC/MCRD COGENERATION Planned 22.30 22.30 SDGE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 215.60 SCE Gen
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Forced 57.00 0.00 PGAE North
RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 Forced 56.90 0.00 PGAE North
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 2.00 SCE Gen
REDOND_7_UNIT 5 REDONDO GEN STA. UNIT 5 Forced 178.87 38.87 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Planned 495.90 495.90 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.70 PGAE Gen
ROLLIN_6_UNIT ROLLINS HYDRO Forced 13.50 0.00 PGAE North
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 8.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 620.00 0.00 PGAE South
SAMPSN_6_KELCO1 KELCO QUALIFYING FACILITY Forced 25.00 7.70 SDGE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 31.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 0.17 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 525.00 0.00 SCE Gen
SBERDO_2_RTS005 SPVP005 Redlands RT Solar Forced 2.50 1.00 SCE Gen
SBERDO_2_RTS013 SPVP013 Forced 3.50 1.00 SCE Gen
SBERDO_2_RTS016 SPVP016 Redlands RT Solar Forced 1.50 1.50 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 3.10 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.23 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 119.01 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 336.04 2.45 PGAE Gen
SEGS_1_SR2SL2 Sunray 2 Forced 20.00 20.00 SCE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 0.43 PGAE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 22.43 PGAE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 3.60 PGAE North
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 1.00 PGAE Gen
SPQUIN_6_SRPCQU Quincy Biomass Planned 22.00 17.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 306.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 10.00 PGAE South
SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE Forced 525.00 525.00 PGAE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 1.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 85.00 0.00 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 85.00 2.44 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 85.00 1.72 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 85.00 1.80 SCE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TENGEN_2_PL1X2 Berry Cogen 42 Forced 40.20 17.50 SCE Gen
TIDWTR_2_UNITS MARTINEZ COGEN LIMITED PARTNERSHIP Planned 114.80 114.80 PGAE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 5.00 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Planned 62.00 31.00 PGAE North
TRNQL8_2_ROJSR1 Tranquillity 8 Rojo Forced 100.00 100.00 PGAE Gen
TRNQL8_2_VERSR1 Tranquillity 8 Verde Planned/Forced 60.00 60.00 PGAE Gen
TRNQLT_2_SOLAR Tranquillity Forced 200.00 4.00 PGAE Gen
TULEWD_1_TULWD1 Tule Wind Forced 127.60 2.30 SDGE Gen
TULLCK_7_UNITS Tullock Hydro Planned 25.90 6.90 PGAE Gen
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 2.00 PGAE Gen
USWND2_1_WIND1 Golden Hills A Planned 42.96 1.79 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 46.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00 PGAE Gen
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Planned 50.61 26.61 PGAE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 24.80 SCE Gen
VESTAL_2_RTS042 SPVP042 Porterville Solar Forced 5.00 1.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 60.00 2.00 SCE Gen
VOLTA_6_BAILCK Bailey Creek Ranch Planned 0.63 0.57 PGAE Gen
WADHAM_6_UNIT Wadham Energy LP Forced 32.00 0.00 PGAE North
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 96.91 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 96.65 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WARNE_2_UNIT WARNE HYDRO AGGREGATE Planned 76.00 36.90 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 11.50 SCE Gen
WISE_1_UNIT 1 Wise Hydro Unit 1 Forced 14.50 0.00 PGAE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 14.70 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 2.00 PGAE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 0.80 PGAE Gen
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
PGSB_1_RDRR01 PGSB_1_RDRR01 Forced 1.36 0.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
EIM ARI 0 3 691.00 565.00
PGAE Gen 25 92 3915.29 2107.22
PGAE North 9 30 513.27 167.50
PGAE South 14 24 1582.62 1444.42
SCE Gen 49 104 4965.98 3004.77
SDGE Gen 11 27 846.13 714.73
0 1 0.00 0.00
Total 108 281 12514.29 8003.64


Report Generated on:
02/15/2018 15:15:00 (PPT)
Filtered Parameters:
Date = 02/16/2018
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.