Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ACACIA_6_SOLAR West Antelope Solar Forced 20.00 20.00 SCE Gen
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 8.00 PGAE Gen
ADOBEE_1_SOLAR Adobe Solar Forced 20.00 0.00 PGAE Gen
AGRICO_6_PL3N5 Fresno Peaker Planned 22.69 22.69 PGAE South
AGRICO_7_UNIT Fresno Cogen Planned 50.60 50.60 PGAE South
ALAMIT_7_UNIT 1 ALAMITOS GEN STA. UNIT 1 Planned/Forced 174.56 174.56 SCE Gen
ALAMIT_7_UNIT 4 ALAMITOS GEN STA. UNIT 4 Planned/Forced 335.67 335.67 SCE Gen
ALAMIT_7_UNIT 5 ALAMITOS GEN STA. UNIT 5 Planned/Forced 497.97 497.97 SCE Gen
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 3.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 0.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 6.90 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 42.81 SCE Gen
ARCOGN_2_UNITS WATSON COGENERATION Planned 416.60 208.60 SCE Gen
ARLINT_5_SCEDYN Arlington Valley CC Forced 565.00 315.00 EIM ARI
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned 820.00 190.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 9.30 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 6.79 SCE Gen
BLAST_1_WIND Mountain View IV Wind Forced 49.00 1.00 SCE Gen
BLCKBT_2_STONEY BLACK BUTTE HYDRO Forced 6.20 6.20 PGAE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 10.80 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 33.00 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 0.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 4.50 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 3.00 SCE Gen
BUCKBL_2_PL1X3 Blythe Energy Center Forced 493.63 0.00 SCE Gen
BUCKCK_7_OAKFLT Oak Flat Forced 1.30 1.30 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 16.50 SCE Gen
BURNYF_2_UNIT 1 Burney Forest Power Forced 31.00 31.00 PGAE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Forced 39.50 3.50 PGAE North
CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE Planned 49.00 49.00 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned 24.00 24.00 PGAE North
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Forced 5.25 5.25 SDGE Gen
CENTER_6_PEAKER Center Peaker Planned/Forced 47.11 47.11 SCE Gen
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 1.06 SDGE Gen
CHINO_6_CIMGEN O.L.S. ENERGY COMPANY -- CHINO Forced 27.75 27.75 SCE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Planned 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 0.00 SCE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COGNAT_1_UNIT Stockton Biomas Planned 48.00 48.00 PGAE Gen
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 11.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 10.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Planned 43.00 43.00 SCE Gen
CONTRL_1_CASAD3 Mammoth G3 Forced 14.00 14.00 SCE Gen
CONTRL_1_LUNDY LUNDY Forced 3.00 1.50 SCE Gen
CONTRL_1_POOLE POOLE HYDRO PLANT 1 Planned 10.90 10.90 SCE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20 PGAE Gen
CROKET_7_UNIT CROCKETT COGEN Planned 240.00 240.00 PGAE North
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 1.13 PGAE South
DEERCR_6_UNIT 1 DEER CREEK Planned 7.00 7.00 PGAE North
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 880.00 PGAE Gen
DEXZEL_1_UNIT Western Power and Steam Cogeneration Planned 20.00 20.00 PGAE Gen
DINUBA_6_UNIT Dinuba Energy, Inc. Forced 12.00 12.00 PGAE South
DIXNLD_1_LNDFL Zero Waste Energy Forced 1.60 0.78 PGAE Gen
DONNLS_7_UNIT Donnells Hydro Forced 72.00 72.00 PGAE Gen
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 14.40 SCE Gen
DSABLA_7_UNIT De Sabla Hydro Planned 18.50 18.50 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Forced 296.19 40.00 SCE Gen
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Planned 22.00 22.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 36.80 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 23.10 EIM ARI
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 23.10 SCE Gen
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Forced 101.50 0.00 PGAE North
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 28.70 PGAE Gen
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 10.50 PGAE South
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Forced 2.56 1.26 SCE Gen
ETIWND_2_RTS010 SPVP010 Fontana RT Solar Forced 1.50 1.00 SCE Gen
ETIWND_2_RTS017 SPVP017 Forced 3.50 1.50 SCE Gen
ETIWND_2_UNIT1 New Indy Ontario Forced 33.60 29.60 SCE Gen
FMEADO_7_UNIT FRENCH MEADOWS HYDRO Planned 16.00 16.00 PGAE North
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 15.50 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 12.00 SCE Gen
GARNET_2_DIFWD1 Difwind Forced 7.88 0.00 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 0.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Forced 11.70 5.40 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GASKW1_2_GW1SR1 Gaskell West 1 Forced 20.00 0.00 SCE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Planned 585.00 585.00 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 0.00 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 9.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 42.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 70.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 40.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 4.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 29.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 19.00 PGAE Gen
GIFFEN_6_SOLAR1 Aspiration Solar G Forced 9.00 2.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 120.00 PGAE South
GILRPP_1_PL1X2 GILROY ENERGY CENTER UNITS 1&2 AGGREGATE Planned 95.20 95.20 PGAE South
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 320.00 SCE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 0.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 6.00 PGAE Gen
GYSRVL_7_WSPRNG Warm Springs Hydro Forced 3.75 3.75 PGAE Gen
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned 144.00 144.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned 144.00 144.00 PGAE South
HATLOS_6_LSCRK Lost Creek 1 & 2 Hydro Conversion Forced 1.70 1.20 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 5.40 PGAE Gen
HAYPRS_6_QFUNTS HAYPRESS HYDRO QF UNITS Forced 14.80 9.80 PGAE North
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Forced 407.00 0.00 PGAE South
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Forced 407.00 407.00 PGAE South
HELMPG_7_UNIT 3 HELMS PUMP-GEN UNIT 3 Forced 404.00 0.00 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Planned/Forced 830.00 332.00 SCE Gen
HINSON_6_LBECH1 Long Beach Unit 1 Planned 65.00 65.00 SCE Gen
HINSON_6_LBECH2 Long Beach Unit 2 Planned 65.00 65.00 SCE Gen
HINSON_6_LBECH3 Long Beach Unit 3 Planned 65.00 65.00 SCE Gen
HINSON_6_LBECH4 Long Beach Unit 4 Planned 65.00 65.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.80 PGAE Gen
HOLGAT_1_BORAX U.S. Borax, Unit 1 Planned 48.20 48.20 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 16.27 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 686.10 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 0.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 0.00 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 0.00 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 24.20 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Planned/Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 40.00 PGAE Gen
INTMNT_3_ANAHEIM Intermountain Power Project Planned 236.00 122.00 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 71.00 SCE Gen
IVANPA_1_UNIT1 Ivanpah 1 Forced 126.00 126.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 6.40 SCE Gen
JAYNE_6_WLSLR Westlands Solar Farm PV 1 Forced 18.00 1.00 PGAE Gen
KELSO_2_UNITS Mariposa Energy Forced 198.03 198.03 PGAE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Forced 11.00 11.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Forced 153.90 13.90 PGAE North
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Forced 153.90 13.90 PGAE South
KERMAN_6_SOLAR1 Fresno Solar South Forced 1.50 0.75 PGAE South
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 0.00 PGAE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 0.00 PGAE South
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 1.70 PGAE Gen
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 259.80 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 259.54 119.54 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 2.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 7.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 557.47 SCE Gen
LITLRK_6_SOLAR2 Palmdale 18 Forced 2.00 1.00 SCE Gen
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Planned 49.70 49.70 PGAE South
LMBEPK_2_UNITA1 Lambie Energy Center, Unit #1 Forced 47.50 5.00 PGAE Gen
LMBEPK_2_UNITA2 Creed Energy Center, Unit #1 Planned 47.60 47.60 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Planned 302.58 302.58 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 1.50 SCE Gen
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 593.16 PGAE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 0.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Forced 11.00 11.00 SCE Gen
MONLTS_2_MONWD4 Monolith 4 Forced 4.75 0.00 SCE Gen
MONLTS_2_MONWD5 Monolith 5 Forced 4.04 0.00 SCE Gen
MONLTS_2_MONWD6 Monolith 6 Forced 5.25 0.00 SCE Gen
MONLTS_2_MONWD7 Monolith 7 Forced 4.76 0.00 SCE Gen
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Planned 510.00 510.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 9.58 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 9.58 SDGE Gen
MSOLAR_2_SOLAR2 Mesquite Solar 2 Forced 100.81 100.81 SDGE Gen
MSTANG_2_SOLAR Mustang Forced 30.00 0.00 PGAE Gen
MSTANG_2_SOLAR3 Mustang 3 Forced 40.00 2.04 PGAE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 36.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Forced 44.40 44.40 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Forced 22.20 22.20 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 22.44 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 1.50 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NCPA_7_GP2UN4 NCPA GEO PLANT 2 UNIT 4 Planned 52.73 52.73 PGAE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 3.80 PGAE South
OLINDA_2_LNDFL2 Brea Power II Forced 28.10 28.10 SCE Gen
ORTGA_6_ME1SL1 Merced 1 Forced 3.00 0.00 PGAE Gen
OTAY_6_PL1X2 Chula Vista Energy Center, LLC Planned 35.50 0.00 SDGE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Planned 603.68 603.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 1.58 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Forced 1.92 1.25 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.68 SCE Gen
PHOENX_1_UNIT PHOENIX PH Planned 2.00 2.00 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 189.00 PGAE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Planned 112.00 0.00 SDGE Gen
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Forced 82.00 42.00 PGAE North
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLAR3 Sierra Solar Greenworks LLC Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Planned 401.00 95.00 PGAE Gen
PNCHVS_2_SOLAR Panoche Valley Solar Forced 240.00 0.00 PGAE Gen
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Planned 635.00 210.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 151.60 SCE Gen
RECTOR_7_TULARE MM Tulare Forced 1.50 0.69 SCE Gen
REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 Planned 175.00 175.00 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Planned 505.96 505.96 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 4.00 SCE Gen
RICHMN_1_CHVSR2 Chevron 8.5 Forced 8.50 0.00 PGAE Gen
RICHMN_1_SOLAR Chevron 2 Forced 2.00 2.00 PGAE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.70 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Forced 140.00 8.00 SCE Gen
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Planned 46.00 46.00 PGAE North
SANDLT_2_SUNITS Mojave Solar Planned 275.00 0.00 SCE Gen
SANLOB_1_LNDFIL Cold Canyon Forced 1.50 1.50 PGAE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 27.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Forced 31.00 8.02 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SAUGUS_6_PTCHGN COUNTY OF LOS ANGELES -- PITCHLE Forced 28.71 18.71 SCE Gen
SBERDO_2_RTS005 SPVP005 Redlands RT Solar Forced 2.50 1.00 SCE Gen
SBERDO_2_RTS016 SPVP016 Redlands RT Solar Forced 1.50 1.50 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 5.35 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.23 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 117.01 SCE Gen
SLRMS3_2_SRMSR1 SILVER RIDGE MOUNT SIGNAL 3 Planned 250.00 250.00 SDGE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 242.43 PGAE Gen
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 0.00 PGAE Gen
SNCLRA_2_UNIT1 New Indy Oxnard Planned 27.80 27.80 SCE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Forced 6.50 6.50 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Planned/Forced 11.40 11.40 PGAE North
SPBURN_2_UNIT 1 Burney Biomass Planned 22.00 22.00 PGAE North
SPIFBD_1_PL1X2 SIERRA PACIFIC IND. (SONORA) Forced 7.50 7.50 PGAE Gen
SPQUIN_6_SRPCQU Quincy Biomass Forced 22.00 0.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STIGCT_2_LODI LODI STIG UNIT Planned 49.90 49.90 PGAE Gen
STOILS_1_UNITS Chevron Richmond Refinery Planned 113.90 0.00 PGAE Gen
SUNSHN_2_LNDFL Sunshine Gas Producers Forced 20.00 6.00 SCE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.00 PGAE South
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 45.00 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Planned 62.00 62.00 PGAE North
TOADTW_6_UNIT TOAD TOWN Planned 1.50 1.50 PGAE North
TRNQLT_2_SOLAR Tranquillity Forced 200.00 108.00 PGAE Gen
TULEWD_1_TULWD1 Tule Wind Forced 127.60 127.60 SDGE Gen
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 4.00 PGAE Gen
USWND2_1_WIND1 Golden Hills A Planned 42.96 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 0.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00 PGAE Gen
VENWD_1_WIND1 Windpark Unlimited 1 Forced 9.43 9.43 SCE Gen
VENWD_1_WIND2 Windpark Unlimited 2 Forced 16.05 16.05 SCE Gen
VENWD_1_WIND3 Painted Hills Windpark Forced 19.04 19.04 SCE Gen
VERNON_6_MALBRG Malburg Generating Station Planned 134.00 134.00 SCE Gen
VESTAL_2_RTS042 SPVP042 Porterville Solar Forced 5.00 1.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Forced 59.00 2.00 SCE Gen
VLCNTR_6_VCSLR2 Valley Center 2 Forced 5.00 1.00 SDGE Gen
VOLTA_2_UNIT 2 Volta Hydro Unit 2 Forced 1.00 1.00 PGAE North
VOLTA_6_BAILCK Bailey Creek Ranch Planned 0.63 0.57 PGAE Gen
WADHAM_6_UNIT Wadham Energy LP Forced 32.00 17.00 PGAE North
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned/Forced 96.65 96.65 SCE Gen
WALNUT_7_WCOVST MM West Covina - ST Unit Planned 6.50 6.50 SCE Gen
WARNE_2_UNIT WARNE HYDRO AGGREGATE Forced 76.00 12.00 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 11.50 SCE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 15.40 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00 PGAE Gen
WNDSTR_2_WIND Windstar Planned 120.00 0.00 SCE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 2.50 PGAE Gen
WSENGY_1_UNIT 1 Wheelabrator Shasta Planned 50.00 50.00 PGAE North
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
EIM ARI 0 3 338.10 0.00
PGAE Gen 26 70 1784.76 2753.67
PGAE North 20 19 133.16 765.70
PGAE South 14 15 58.50 2047.79
SCE Gen 39 107 2653.19 3162.54
SDGE Gen 4 9 25.72 1087.34
Total 103 223 4993.43 9817.04


Report Generated on:
04/18/2018 08:49:21 (PPT)
Filtered Parameters:
Date = 04/17/2018
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.