Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ACACIA_6_SOLAR West Antelope Solar Forced 20.00 20.00 SCE Gen
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 8.00 PGAE Gen
ADOBEE_1_SOLAR Adobe Solar Forced 20.00 0.00 PGAE Gen
ALAMIT_7_UNIT 1 ALAMITOS GEN STA. UNIT 1 Planned/Forced 174.56 174.56 SCE Gen
ALHMBR_1_ALHSLR SG Alhambra Forced 50.00 0.00 SDGE Gen
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 3.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 0.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 35.40 SCE Gen
ALTWD_1_QF Altwind Forced 28.84 28.84 SCE Gen
ANAHM_2_CANYN1 CANYON POWER PLANT UNIT 1 Forced 49.40 49.40 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 42.81 SCE Gen
AVSOLR_2_SOLAR AV SOLAR RANCH 1 Planned 241.50 0.00 SCE Gen
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 0.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 6.08 PGAE South
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 4.21 PGAE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 0.00 PGAE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 160.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 85.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 50.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 4.00 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned 15.80 0.00 SCE Gen
BLAST_1_WIND Mountain View IV Wind Planned 49.00 0.00 SCE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BOGUE_1_UNITA1 Feather River Energy Center, Unit #1 Planned 47.60 47.60 PGAE North
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Planned/Forced 51.25 3.25 SDGE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 12.60 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 13.50 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 0.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 4.50 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 9.00 SCE Gen
BUCKBL_2_PL1X3 Blythe Energy Center Forced 493.63 0.00 SCE Gen
BUCKCK_7_OAKFLT Oak Flat Forced 1.30 1.30 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
BURNYF_2_UNIT 1 Burney Forest Power Forced 31.00 0.00 PGAE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Forced 39.50 3.50 PGAE North
CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE Planned 49.00 49.00 PGAE North
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Forced 120.00 0.00 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned 24.00 24.00 PGAE North
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Forced 5.25 5.25 SDGE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 0.00 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 4.17 PGAE Gen
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 1.05 SDGE Gen
CHINO_6_CIMGEN O.L.S. ENERGY COMPANY -- CHINO Forced 27.75 27.75 SCE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Planned 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 0.00 SCE Gen
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00 PGAE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 2.96 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 2.31 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 9.00 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 2.45 PGAE South
COGNAT_1_UNIT Stockton Biomas Planned 48.00 48.00 PGAE Gen
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 11.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 10.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Planned 43.00 43.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 16.91 PGAE North
CONTRL_1_CASAD3 Mammoth G3 Forced 14.00 14.00 SCE Gen
COWCRK_2_UNIT Cow Creek Hydro Planned 2.00 2.00 PGAE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Forced 70.40 0.00 PGAE North
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20 PGAE Gen
CROKET_7_UNIT CROCKETT COGEN Forced 240.00 240.00 PGAE North
CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN Forced 7.00 3.50 PGAE South
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 1.13 PGAE South
CUMBIA_1_SOLAR Columbia Solar Energy II Planned 19.00 0.00 PGAE Gen
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.60 PGAE Gen
DEERCR_6_UNIT 1 DEER CREEK Planned 7.00 7.00 PGAE North
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 880.00 PGAE Gen
DINUBA_6_UNIT Dinuba Energy, Inc. Forced 12.00 12.00 PGAE South
DIXNLD_1_LNDFL Zero Waste Energy Forced 1.60 0.78 PGAE Gen
DONNLS_7_UNIT Donnells Hydro Forced 72.00 7.00 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 0.93 PGAE South
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 14.40 SCE Gen
DSABLA_7_UNIT De Sabla Hydro Planned 18.50 18.50 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Forced 296.19 40.00 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Planned 147.80 147.80 PGAE South
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Planned 22.00 22.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 36.80 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 27.30 EIM ARI
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 27.30 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Forced 7.50 0.00 SDGE Gen
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Forced 101.50 5.50 PGAE North
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 22.70 PGAE Gen
ELNIDP_6_BIOMAS El Nido Biomass to Energy Forced 10.50 10.50 PGAE South
ENERSJ_2_WIND ESJ Wind Energy Forced 155.10 16.50 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ESQUON_6_LNDFIL Neal Road Landfill Generating Facility Forced 2.10 2.10 PGAE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 1.46 SCE Gen
ETIWND_2_RTS010 SPVP010 Fontana RT Solar Forced 1.50 1.00 SCE Gen
ETIWND_2_RTS017 SPVP017 Forced 3.50 1.50 SCE Gen
ETIWND_2_UNIT1 New Indy Ontario Forced 33.60 29.60 SCE Gen
FMEADO_7_UNIT FRENCH MEADOWS HYDRO Planned 16.00 16.00 PGAE North
FORBST_7_UNIT 1 FORBESTOWN HYDRO Forced 37.50 0.00 PGAE North
GANSO_1_WSTBM1 Weststar Dairy Biogas Forced 1.00 0.00 PGAE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 10.50 SCE Gen
GARNET_2_DIFWD1 Difwind Planned 7.88 0.00 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 0.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 0.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 585.00 24.91 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 0.00 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 11.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 44.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 20.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 37.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 4.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 33.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 20.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00 PGAE South
GILRPP_1_PL1X2 GILROY ENERGY CENTER UNITS 1&2 AGGREGATE Forced 95.20 0.00 PGAE South
GILRPP_1_PL3X4 GILROY ENERGY CENTER, UNIT #3 Forced 46.20 0.00 PGAE South
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIDLY_6_SOLAR GRIDLEY MAIN TWO Forced 2.50 0.00 PGAE Gen
GRNLF1_1_UNITS Greenleaf 1 Forced 49.20 0.00 PGAE North
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Forced 3.04 0.00 PGAE South
GWFPWR_1_UNITS Hanford Peaker Plant Forced 98.46 3.50 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 1.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 6.00 PGAE Gen
GYSRVL_7_WSPRNG Warm Springs Hydro Forced 3.75 3.75 PGAE Gen
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned 144.00 144.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned 144.00 144.00 PGAE South
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.80 PGAE Gen
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Forced 407.00 0.00 PGAE South
HELMPG_7_UNIT 3 HELMS PUMP-GEN UNIT 3 Forced 404.00 0.00 PGAE South
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 2.82 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 2.36 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Planned 830.00 830.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 2.80 PGAE Gen
HOLGAT_1_BORAX U.S. Borax, Unit 1 Planned 48.20 48.20 SCE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Planned 65.08 16.27 PGAE North
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Forced 97.62 16.27 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 681.10 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 2.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 2.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 1.69 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 0.00 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Planned/Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 30.00 PGAE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
IVANPA_1_UNIT3 Ivanpah 3 Forced 133.00 0.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 6.40 SCE Gen
JAYNE_6_WLSLR Westlands Solar Farm PV 1 Forced 18.00 1.00 PGAE Gen
KELSO_2_UNITS Mariposa Energy Forced 198.03 198.03 PGAE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Forced 11.00 11.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Forced 153.90 7.90 PGAE North
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Forced 153.90 7.90 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.90 PGAE South
KERNRG_1_UNITS South Belridge Cogen Facility Forced 55.20 10.20 PGAE South
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 0.00 PGAE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 1.66 PGAE South
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 1.66 PGAE Gen
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 259.80 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 8.20 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 7.15 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 145.00 5.00 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Planned/Forced 46.10 2.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Planned/Forced 47.98 4.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 27.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned/Forced 799.47 323.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 3.84 PGAE South
LITLRK_6_SOLAR1 Lancaster Little Rock C Forced 5.00 1.00 SCE Gen
LITLRK_6_SOLAR2 Palmdale 18 Forced 2.00 1.00 SCE Gen
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 6.70 PGAE South
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned 561.29 0.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 13.18 PGAE Gen
LOWGAP_7_QFUNTS Matthews Dam Hydro Forced 1.35 1.35 PGAE North
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 3.00 SCE Gen
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 7.16 PGAE Gen
MIDWD_6_WNDLND Windland Refresh 1 Forced 7.45 0.00 SCE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.49 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 0.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Forced 11.00 11.00 SCE Gen
MONLTS_2_MONWD4 Monolith 4 Planned 4.75 0.00 SCE Gen
MONLTS_2_MONWD5 Monolith 5 Planned 4.04 0.00 SCE Gen
MONLTS_2_MONWD6 Monolith 6 Planned 5.25 0.00 SCE Gen
MONLTS_2_MONWD7 Monolith 7 Planned 4.76 0.00 SCE Gen
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Forced 510.00 0.00 PGAE South
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Planned 510.00 510.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Planned 494.58 494.58 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Planned 494.58 494.58 SDGE Gen
MSHGTS_6_MMARLF MIRAMAR LANDFILL Forced 5.00 0.00 SDGE Gen
MSOLAR_2_SOLAR2 Mesquite Solar 2 Forced 100.81 0.00 SDGE Gen
MSTANG_2_SOLAR3 Mustang 3 Forced 40.00 2.04 PGAE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 3.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 4.20 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 0.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 1.98 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 29.00 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Planned 57.00 0.00 EIM ARI
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Planned 57.00 0.00 SDGE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OASIS_6_SOLAR2 Oasis Solar Forced 20.00 1.50 SCE Gen
OASIS_6_SOLAR3 Soccer Center Forced 3.00 0.00 SCE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 0.60 PGAE South
OLDRIV_6_LKVBM1 Lakeview Dairy Biogas Forced 1.00 0.00 PGAE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 3.40 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 2.31 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 2.51 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 5.68 SDGE Gen
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 0.92 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.68 SCE Gen
PEABDY_2_LNDFL1 Potrero Hills Energy Producers Forced 8.00 0.00 PGAE South
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 60.00 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 112.00 1.21 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 0.09 SDGE Gen
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Planned/Forced 82.00 82.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 4.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 5.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 4.70 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 3.60 PGAE North
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLAR3 Sierra Solar Greenworks LLC Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 95.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.00 PGAE Gen
PNCHVS_2_SOLAR Panoche Valley Solar Forced 240.00 178.00 PGAE Gen
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Forced 69.00 0.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Forced 68.50 0.00 PGAE North
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Planned 635.00 210.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 115.60 SCE Gen
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Forced 57.00 0.00 PGAE North
RECTOR_7_TULARE MM Tulare Forced 1.50 0.69 SCE Gen
REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 Planned 175.00 175.00 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
RICHMN_1_CHVSR2 Chevron 8.5 Forced 8.50 0.00 PGAE Gen
RICHMN_1_SOLAR Chevron 2 Forced 2.00 0.00 PGAE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.50 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 8.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Planned 620.00 620.00 PGAE South
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Planned 46.00 16.00 PGAE North
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 29.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 2.22 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SAUGUS_6_PTCHGN COUNTY OF LOS ANGELES -- PITCHLE Forced 28.71 0.00 SCE Gen
SBERDO_2_RTS005 SPVP005 Redlands RT Solar Forced 2.50 1.00 SCE Gen
SBERDO_2_RTS016 SPVP016 Redlands RT Solar Forced 1.50 1.50 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 5.75 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.43 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 74.01 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Planned 336.04 336.04 PGAE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 1.03 PGAE Gen
SLRMS3_2_SRMSR1 SILVER RIDGE MOUNT SIGNAL 3 Planned 250.00 250.00 SDGE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 116.43 PGAE Gen
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 0.00 PGAE Gen
SNCLRA_2_HOWLNG Houwelings Nurseries Oxnard, Inc Forced 13.00 0.00 SCE Gen
SNCLRA_2_UNIT1 New Indy Oxnard Planned 27.80 27.80 SCE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Forced 6.50 6.50 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Planned/Forced 11.40 11.40 PGAE North
SPQUIN_6_SRPCQU Quincy Biomass Forced 22.00 0.00 PGAE North
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Forced 7.00 0.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STIGCT_2_LODI LODI STIG UNIT Planned 49.90 49.90 PGAE Gen
STROUD_6_SOLAR Stroud Solar Station Forced 20.00 2.00 PGAE South
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 29.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 17.00 PGAE South
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 85.00 2.12 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 85.00 5.72 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 85.00 3.17 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 85.00 5.10 SCE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 0.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 0.00 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Planned 62.00 62.00 PGAE North
TOADTW_6_UNIT TOAD TOWN Planned 1.50 1.50 PGAE North
TRNQL8_2_AZUSR1 Tranquillity 8 Azul Forced 20.00 0.00 PGAE Gen
TRNQLT_2_SOLAR Tranquillity Forced 200.00 6.00 PGAE Gen
TRNSWD_1_QF FPL Energy C Wind Forced 38.97 28.97 SCE Gen
TULEWD_1_TULWD1 Tule Wind Forced 127.60 127.60 SDGE Gen
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 3.00 PGAE Gen
USWND2_1_WIND1 Golden Hills A Planned 42.96 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 1.83 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 0.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 3.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 0.00 PGAE North
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61 PGAE Gen
VEAVST_1_SOLAR Community Solar Planned 14.40 14.40 SCE Gen
VERNON_6_MALBRG Malburg Generating Station Planned 134.00 134.00 SCE Gen
VESTAL_2_RTS042 SPVP042 Porterville Solar Forced 5.00 0.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 59.00 2.00 SCE Gen
VOLTA_6_BAILCK Bailey Creek Ranch Planned 0.63 0.57 PGAE Gen
VSTAES_6_VESBT1 Vista Energy Storage Forced 40.00 40.00 SDGE Gen
WADHAM_6_UNIT Wadham Energy LP Forced 32.00 0.00 PGAE North
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WARNE_2_UNIT WARNE HYDRO AGGREGATE Forced 76.00 12.00 SCE Gen
WEBER_6_FORWRD Forward Forced 4.20 4.20 PGAE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 16.50 SCE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 15.40 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00 PGAE Gen
WNDSTR_2_WIND Windstar Planned 120.00 0.00 SCE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 0.00 PGAE Gen
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
SCEC_1_PDRP45 PDR-F SCEC SEES Forced 0.80 0.80
SCEN_6_PDRP25 PDR-F SCEN SEES Forced 0.35 0.35
SCEW_2_PDRP30 PDR-F SCEW SEES Forced 0.40 0.40
SISQUC_1_SMARIA Santa Maria II LFG Power Plant Forced 1.42 1.42


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
EIM ARI 1 1 27.30 0.00
PGAE Gen 19 88 1570.05 1898.24
PGAE North 18 40 157.84 777.65
PGAE South 8 38 124.68 1481.60
SCE Gen 47 87 1259.18 2604.84
SDGE Gen 6 18 61.90 917.43
0 4 0.00 2.97
Total 99 276 3200.95 7682.73


Report Generated on:
05/01/2018 09:46:16 (PPT)
Filtered Parameters:
Date = 05/01/2018
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.