Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 8.00 PGAE Gen
ADOBEE_1_SOLAR Adobe Solar Forced 20.00 0.00 PGAE Gen
AGRICO_6_PL3N5 Fresno Peaker Forced 22.69 22.69 PGAE South
AGRICO_7_UNIT Fresno Cogen Forced 50.60 50.60 PGAE South
AGUCAL_5_SOLAR1 Agua Caliente Solar Forced 290.00 1.00 SDGE Gen
ALLGNY_6_HYDRO1 Salmon Creek Hydroelectric Project Forced 0.52 0.52 PGAE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 23.40 23.40 PGAE South
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 3.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 12.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 1.50 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 1.50 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.35 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 9.75 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 42.81 SCE Gen
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Forced 33.00 2.00 PGAE South
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 119.00 PGAE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 399.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 4.00 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned 15.80 0.00 SCE Gen
BLAST_1_WIND Mountain View IV Wind Planned 49.00 2.00 SCE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 14.40 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 19.50 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 4.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 2.50 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 1.60 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 0.00 SCE Gen
BUCKBL_2_PL1X3 Blythe Energy Center Forced 493.63 0.00 SCE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Forced 39.50 3.50 PGAE North
CANTUA_1_SOLAR Cantua Solar Station Forced 20.00 1.00 PGAE South
CARLS1_2_CARCT1 Carlsbad 1 Planned 422.00 0.00 SDGE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 0.00 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Planned 48.67 0.00 PGAE Gen
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 1.03 SDGE Gen
CHINO_6_CIMGEN Chino Co-Generation Forced 27.75 27.75 SCE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Planned 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 0.00 SCE Gen
CHWCHL_1_BIOMAS Chow II Biomass to Energy Forced 10.80 10.80 PGAE South
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 15.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 14.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Forced 43.00 2.00 SCE Gen
COPMT4_2_SOLAR4 Copper Mountain Solar 4 Forced 92.00 0.00 SCE Gen
COVERD_2_HCKHY1 HATCHET CREEK Forced 6.89 6.89 PGAE Gen
COVERD_2_RCKHY1 ROARING CREEK Forced 2.00 2.00 PGAE Gen
COWCRK_2_UNIT Cow Creek Hydro Forced 2.00 1.00 PGAE Gen
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Planned 3.20 3.20 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20 PGAE Gen
CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN Forced 7.00 0.00 PGAE South
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 1.13 PGAE South
DELAMO_2_SOLRC1 Golden Springs Building C1 Forced 1.16 0.00 SCE Gen
DELAMO_2_SOLRD Golden Solar Building D Forced 1.25 0.00 SCE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned 880.00 0.00 PGAE Gen
DEVERS_1_SOLAR1 SEPV8 Forced 12.00 0.00 SCE Gen
DINUBA_6_UNIT Dinuba Energy, Inc. Forced 12.00 12.00 PGAE South
DONNLS_7_UNIT Donnells Hydro Forced 72.00 7.00 PGAE Gen
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 14.40 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 5.80 PGAE South
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 36.80 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 200.00 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Planned 7.50 2.50 SDGE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 0.00 SDGE Gen
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Forced 101.50 5.50 PGAE North
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 21.70 PGAE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 263.00 SCE Gen
ENWIND_2_WIND1 Cameron Ridge Forced 47.10 2.60 SCE Gen
ENWIND_2_WIND2 Ridgetop I Forced 38.24 8.44 SCE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 1.86 SCE Gen
ETIWND_2_RTS026 SPVP026 Forced 6.00 1.50 SCE Gen
ETIWND_2_UNIT1 New Indy Ontario Forced 33.60 29.60 SCE Gen
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 0.00 PGAE Gen
FORBST_7_UNIT 1 FORBESTOWN HYDRO Forced 37.50 37.50 PGAE North
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30 PGAE Gen
GALE_1_SR3SR3 Sunray 3 Forced 13.80 13.80 SCE Gen
GARNET_1_SOLAR2 Garnet Solar Power Generation Station 1 Forced 4.00 0.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 3.00 SCE Gen
GARNET_2_DIFWD1 Difwind Planned 7.88 0.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 0.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 4.40 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 11.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 45.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 18.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 41.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 4.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 33.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 22.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00 PGAE South
GLNARM_2_UNIT 5 Glenarm Turbine 5 Forced 65.81 12.49 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLNARM_7_UNIT 4 GLEN ARM UNIT 4 Planned 42.42 0.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIFFI_2_LSPDYN Griffith Energy Forced 570.00 320.00 SCE Gen
GRNLF1_1_UNITS Greenleaf 1 Forced 49.20 49.20 PGAE North
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 3.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 9.00 PGAE Gen
GYSRVL_7_WSPRNG Warm Springs Hydro Forced 3.75 3.75 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 7.70 PGAE Gen
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Planned/Forced 407.00 407.00 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 48.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned/Forced 4.90 4.90 PGAE Gen
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 278.10 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 2.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 2.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 1.69 SCE Gen
INDVLY_1_UNITS Indian Valley Hydro Forced 3.01 3.01 PGAE North
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 24.20 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Planned/Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 35.00 PGAE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
IVWEST_2_SOLAR1 Imperial Valley West ( Q # 608) Planned 150.00 0.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 9.60 SCE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Forced 11.00 11.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KNGCTY_6_UNITA1 King City Energy Center, Unit 1 Forced 44.60 44.60 PGAE Gen
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAGBEL_2_STG1 Bell Bandini Commerce Refuse Forced 10.05 10.05 SCE Gen
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 0.00 PGAE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 0.00 PGAE South
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 0.00 PGAE Gen
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 9.80 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 9.20 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 8.15 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 145.00 5.00 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 4.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 12.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 0.00 SCE Gen
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned/Forced 561.29 31.29 PGAE Gen
LODI25_2_UNIT 1 LODI GAS TURBINE Forced 23.80 23.80 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 26.88 PGAE Gen
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 102.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 7.50 SCE Gen
MCARTH_6_FRIVRB Fall River Mills Project B Forced 1.50 1.50 PGAE Gen
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 10.16 PGAE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 0.00 SCE Gen
MOJAVE_1_SIPHON MOJAVE SIPHON POWER PLANT Forced 14.36 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Planned 7.99 7.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned/Forced 11.00 11.00 SCE Gen
MONLTS_2_MONWD4 Monolith 4 Planned 4.75 0.00 SCE Gen
MONLTS_2_MONWD5 Monolith 5 Planned 4.04 0.00 SCE Gen
MONLTS_2_MONWD6 Monolith 6 Planned 5.25 0.00 SCE Gen
MONLTS_2_MONWD7 Monolith 7 Planned 4.76 0.00 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 39.58 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 39.58 SDGE Gen
MSOLAR_2_SOLAR2 Mesquite Solar 2 Planned 100.81 0.00 SDGE Gen
MSOLAR_2_SOLAR3 Mesquite Solar 3, LLC Planned 152.00 0.00 SDGE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 6.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Planned 44.40 3.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned 22.20 0.60 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 2.64 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 29.50 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 5.00 EIM ARI
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 5.00 SDGE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OASIS_6_SOLAR3 Soccer Center Forced 3.00 0.00 SCE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 1.80 PGAE South
OMAR_2_UNIT 4 KERN RIVER COGENERATION CO. UNIT 4 Planned 81.44 0.00 SCE Gen
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Forced 775.00 25.00 SCE Gen
ORTGA_6_ME1SL1 Merced 1 Forced 3.00 0.75 PGAE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Planned/Forced 603.68 6.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 1.58 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.02 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.68 SCE Gen
PGF1_2_RDRR06 RDRR-D PGF1 EDF Forced 1.70 1.70 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 10.00 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 112.00 4.58 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.00 1.02 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 2.72 SDGE Gen
PIT1_6_FRIVRA Fall River Mills Project A Forced 1.50 1.50 PGAE Gen
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Forced 82.00 41.00 PGAE North
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
PNCHVS_2_SOLAR Panoche Valley Solar Forced 240.00 178.00 PGAE Gen
PNOCHE_1_PL1X2 Panoche Peaker Forced 49.97 0.00 PGAE South
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Forced 69.00 69.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Planned 68.50 68.50 PGAE North
PRIMM_2_SOLAR1 Silver State South Forced 250.00 0.00 SCE Gen
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Forced 635.00 210.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 107.60 SCE Gen
RECTOR_7_TULARE MM Tulare Forced 1.50 0.69 SCE Gen
REDBLF_6_UNIT RED BLUFF PEAKER PLANT Forced 44.00 44.00 PGAE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 2.50 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.50 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 14.00 SCE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 34.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 2.78 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SBERDO_2_RTS005 SPVP005 Redlands RT Solar Forced 2.50 1.00 SCE Gen
SBERDO_2_RTS016 SPVP016 Redlands RT Solar Forced 1.50 1.10 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.25 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.43 SCE Gen
SDG1_1_PDRP03 Stater Bros Markets Forced 0.25 0.00 SDGE Gen
SDG1_1_PDRP04 SDG1_1_PDRP04 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP05 SDG1_1_PDRP05 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP06 SDG1_1_PDRP06 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP07 SDG1_1_PDRP07 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP08 SDG1_1_PDRP08 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP09 SDG1_1_PDRP09 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP14 SDG1_1_PDRP14 Planned 1.00 0.00 SDGE Gen
SDG1_1_PDRP15 SDG1_1_PDRP15 Planned 1.00 0.00 SDGE Gen
SGREGY_6_SANGER Algonquin Power Sanger 2 Forced 48.30 0.00 PGAE Gen
SHELRF_1_UNITS SHELL OIL REFINERY AGGREGATE Forced 100.00 0.00 PGAE Gen
SLRMS3_2_SRMSR1 SILVER RIDGE MOUNT SIGNAL 3 Planned 250.00 200.00 SDGE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 84.43 PGAE Gen
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 1.00 PGAE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Planned/Forced 6.50 6.50 PGAE North
SPBURN_7_SNOWMT SPBURN_7_SNOWMT Forced 3.00 3.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 30.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 29.00 PGAE South
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 85.00 7.10 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 85.00 8.28 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 85.00 7.35 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 85.00 7.69 SCE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 10.00 SDGE Gen
TULEWD_1_TULWD1 Tule Wind Forced 127.60 0.00 SDGE Gen
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 5.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 2.30 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 9.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 0.00 PGAE North
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61 PGAE Gen
VERNON_6_MALBRG Malburg Generating Station Planned 134.00 11.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 59.00 4.00 SCE Gen
VOLTA_2_UNIT 2 Volta Hydro Unit 2 Planned 1.00 1.00 PGAE North
VOLTA_6_BAILCK Bailey Creek Ranch Planned 0.63 0.57 PGAE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WDLEAF_7_UNIT 1 WOODLEAF HYDRO Forced 60.00 15.00 PGAE North
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 11.50 SCE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 14.70 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 1.00 PGAE Gen
WNDSTR_2_WIND Windstar Forced 120.00 18.00 SCE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 0.50 PGAE Gen
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
PGCC_1_PDRP02 PGCC_1_PDRP02 Planned 3.00 0.00
PGCC_1_PDRP04 PGCC_1_PDRP04 Planned 1.00 0.00
PGEB_2_PDRP04 PGEB_2_PDRP04 Planned 4.00 0.00
PGEB_2_PDRP05 PGEB_2_PDRP05 Planned 5.00 0.00
PGEB_2_PDRP08 PGEB_2_PDRP08 Planned 1.00 0.00
PGEB_2_PDRP09 PGEB_2_PDRP09 Planned 1.00 0.00
PGEB_2_PDRP10 PGEB_2_PDRP10 Planned 1.00 0.00
PGEB_2_PDRP21 PGEB_2_PDRP21 Planned 0.99 0.00
PGEB_2_PDRP22 PGEB_2_PDRP22 Planned 0.99 0.00
PGEB_2_PDRP23 PGEB_2_PDRP23 Planned 0.99 0.00
PGEB_2_PDRP24 PGEB_2_PDRP24 Planned 0.99 0.00
PGEB_2_PDRP25 PGEB_2_PDRP25 Planned 0.99 0.00
PGEB_2_PDRP26 PGEB_2_PDRP26 Planned 0.99 0.00
PGF1_2_PDRP03 PGF1_2_PDRP03 Planned 2.00 0.00
PGF1_2_PDRP11 PGF1_2_PDRP11 Planned 3.00 0.00
PGF1_2_PDRP16 PGF1_2_PDRP16 Planned 0.99 0.00
PGF1_2_PDRP17 PGF1_2_PDRP17 Planned 0.99 0.00
PGFG_1_PDRP05 PGFG_1_PDRP05 Planned 1.00 0.00
PGHB_6_PDRP02 PGHB_6_PDRP02 Planned 1.00 0.00
PGHB_6_PDRP04 PGHB_6_PDRP04 Planned 0.50 0.00
PGKN_2_PDRP02 PGKN_2_PDRP02 Planned 4.00 0.00
PGKN_2_PDRP06 PGKN_2_PDRP06 Planned 0.99 0.00
PGKN_2_PDRP07 PGKN_2_PDRP07 Planned 0.99 0.00
PGNB_2_PDRP02 PGNB_2_PDRP02 Planned 1.00 0.00
PGNB_2_PDRP03 PGNB_2_PDRP03 Planned 3.00 0.00
PGNC_1_PDRP01 PGNC_1_PDRP01 Planned 1.00 0.00
PGNP_2_PDRP02 PGNP_2_PDRP02 Planned 4.00 0.00
PGNP_2_PDRP08 PGNP_2_PDRP08 Planned 0.99 0.00
PGNP_2_PDRP09 PGNP_2_PDRP09 Planned 0.99 0.00
PGNP_2_PDRP10 PGNP_2_PDRP10 Planned 0.99 0.00
PGP2_2_PDRP05 PGP2_2_PDRP05 Planned 3.00 0.00
PGP2_2_PDRP07 PGP2_2_PDRP07 Planned 1.00 0.00
PGP2_2_PDRP08 PGP2_2_PDRP08 Planned 1.00 0.00
PGSB_1_PDRP04 PGSB_1_PDRP04 Planned 3.00 0.00
PGSB_1_PDRP08 PGSB_1_PDRP08 Planned 4.00 0.00
PGSB_1_PDRP10 PGSB_1_PDRP10 Planned 3.00 0.00
PGSB_1_PDRP17 PGSB_1_PDRP17 Planned 0.50 0.00
PGSB_1_PDRP29 PGSB_1_PDRP29 Planned 0.99 0.00
PGSB_1_PDRP30 PGSB_1_PDRP30 Planned 0.99 0.00
PGSB_1_PDRP31 PGSB_1_PDRP31 Planned 0.99 0.00
PGSF_2_PDRP03 PGSF_2_PDRP03 Planned 2.00 0.00
PGSF_2_PDRP04 PGSF_2_PDRP04 Planned 2.00 0.00
PGSF_2_PDRP08 PGSF_2_PDRP08 Planned 1.00 0.00
PGSF_2_PDRP12 PGSF_2_PDRP12 Planned 1.00 0.00
PGSF_2_PDRP18 PGSF_2_PDRP18 Planned 0.50 0.00
PGSF_2_PDRP19 PGSF_2_PDRP19 Planned 0.99 0.00
PGSI_1_PDRP02 PGSI_1_PDRP02 Planned 4.00 0.00
PGSI_1_PDRP09 PGSI_1_PDRP09 Planned 0.99 0.00
PGST_2_PDRP01 PGST_2_PDRP01 Planned 1.00 0.00
PGZP_2_PDRP02 PGZP_2_PDRP02 Planned 4.00 0.00
PGZP_2_PDRP09 PGZP_2_PDRP09 Planned 0.99 0.00
PGZP_2_PDRP10 PGZP_2_PDRP10 Planned 0.99 0.00
SCEC_1_PDRP30 SCEC_1_PDRP30 Planned 5.00 0.00
SCEC_1_PDRP31 SCEC_1_PDRP31 Planned 5.00 0.00
SCEC_1_PDRP32 SCEC_1_PDRP32 Planned 6.00 0.00
SCEC_1_PDRP42 SCEC_1_PDRP42 Planned 5.00 0.00
SCEC_1_PDRP48 SCEC_1_PDRP48 Planned 0.99 0.00
SCEC_1_PDRP49 SCEC_1_PDRP49 Planned 0.99 0.00
SCEC_1_PDRP50 SCEC_1_PDRP50 Planned 0.99 0.00
SCEC_1_PDRP51 SCEC_1_PDRP51 Planned 0.99 0.00
SCEC_1_PDRP52 SCEC_1_PDRP52 Planned 0.99 0.00
SCEC_1_PDRP53 SCEC_1_PDRP53 Planned 0.99 0.00
SCEC_1_PDRP54 SCEC_1_PDRP54 Planned 0.99 0.00
SCEC_1_PDRP55 SCEC_1_PDRP55 Planned 0.99 0.00
SCEC_1_RDRR39 SEP-C-LSCE Forced 44.00 44.00
SCEN_6_PDRP01 SCEN_6_PDRP01 Planned 3.00 0.00
SCEN_6_PDRP02 SCEN_6_PDRP02 Planned 0.99 0.00
SCEN_6_PDRP27 SCEN_6_PDRP27 Planned 3.00 0.00
SCEN_6_RDRR13 SEP-N-LSCE Forced 11.00 11.00
SCEW_2_PDRP19 SCEW_2_PDRP19 Planned 5.00 0.00
SCEW_2_PDRP20 SCEW_2_PDRP20 Planned 5.00 0.00
SCEW_2_PDRP38 SCEW_2_PDRP38 Planned 6.00 0.00
SCEW_2_PDRP39 SCEW_2_PDRP39 Planned 5.00 0.00
SCEW_2_PDRP40 SCEW_2_PDRP40 Planned 0.99 0.00
SCEW_2_PDRP41 SCEW_2_PDRP41 Planned 0.99 0.00
SCEW_2_PDRP42 SCEW_2_PDRP42 Planned 0.99 0.00
SCEW_2_PDRP43 SCEW_2_PDRP43 Planned 0.99 0.00
SCEW_2_PDRP44 SCEW_2_PDRP44 Planned 0.99 0.00
SCEW_2_PDRP45 SCEW_2_PDRP45 Planned 0.99 0.00
SCEW_2_PDRP46 SCEW_2_PDRP46 Planned 0.99 0.00
SCEW_2_PDRP47 SCEW_2_PDRP47 Planned 0.99 0.00
SCEW_2_PDRP48 SCEW_2_PDRP48 Planned 0.99 0.00
SCEW_2_PDRP49 SCEW_2_PDRP49 Planned 0.99 0.00
SCEW_2_RDRR27 SEP-W-LSCE Forced 42.00 42.00
SCHD_1_PDRP11 SCHD_1_PDRP11 Planned 3.00 0.00
SCHD_1_PDRP12 SCHD_1_PDRP12 Planned 3.00 0.00
SCHD_1_RDRR12 SEP-HD-LSCE Forced 3.00 3.00
SCLD_1_PDRP10 SCLD_1_PDRP10 Planned 1.00 0.00
SCNW_6_PDRP10 SCNW_6_PDRP10 Planned 4.00 0.00
SCNW_6_PDRP11 SCNW_6_PDRP11 Planned 3.00 0.00
SCNW_6_PDRP12 SCNW_6_PDRP12 Planned 3.00 0.00
SCNW_6_RDRR11 SEP-NW-LSCE Forced 8.00 8.00
SDG1_1_PDRP25 SDG1_1_PDRP25 Planned 0.99 0.00
SDG1_1_PDRP26 SDG1_1_PDRP26 Planned 0.99 0.00
SDG1_1_PDRP27 SDG1_1_PDRP27 Planned 0.99 0.00
SDG1_1_PDRP30 SDG1_1_PDRP30 Planned 1.50 0.00
SDG1_1_PDRP31 SDG1_1_PDRP31 Planned 1.50 0.00
SDG1_1_PDRP32 SDG1_1_PDRP32 Planned 1.50 0.00
SDG1_1_PDRP33 SDG1_1_PDRP33 Planned 1.50 0.00
SDG1_1_PDRP34 SDG1_1_PDRP34 Planned 1.50 0.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
EIM ARI 0 1 5.00 0.00
PGAE Gen 15 78 1179.37 381.28
PGAE North 4 20 131.69 282.51
PGAE South 4 24 54.25 563.79
SCE Gen 44 82 1494.45 709.40
SDGE Gen 15 24 298.48 0.00
95 5 0.00 108.00
Total 177 234 3163.24 2044.98


Report Generated on:
06/28/2018 08:32:01 (PPT)
Filtered Parameters:
Date = 06/29/2018
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.