Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ACACIA_6_SOLAR West Antelope Solar Forced 20.00 12.00 SCE Gen
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 9.00 PGAE Gen
ADOBEE_1_SOLAR Adobe Solar Forced 20.00 0.00 PGAE Gen
ALAMIT_7_UNIT 5 ALAMITOS GEN STA. UNIT 5 Forced 497.97 17.97 SCE Gen
ALAMIT_7_UNIT 6 ALAMITOS GEN STA. UNIT 6 Forced 495.00 70.00 SCE Gen
ALAMO_6_UNIT ALAMO POWER PLANT Planned 17.00 17.00 SCE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 23.40 23.40 PGAE South
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 9.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 3.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 9.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned/Forced 150.00 0.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 15.45 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 42.81 SCE Gen
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Forced 33.00 2.00 PGAE South
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 428.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 9.08 PGAE South
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 5.21 PGAE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 119.00 PGAE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 387.00 SCE Gen
BIGSKY_2_BSKSR6 Big Sky Solar 6 Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 4.00 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned 15.80 0.00 SCE Gen
BLAST_1_WIND Mountain View IV Wind Forced 49.00 0.00 SCE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 18.00 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 27.00 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 2.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 0.00 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 3.00 SCE Gen
BUCKBL_2_PL1X3 Blythe Energy Center Forced 493.63 23.63 SCE Gen
BUCKCK_7_OAKFLT Oak Flat Forced 1.30 1.30 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 16.50 SCE Gen
BUCKWD_7_WINTCV Wintec Energy, Ltd. Forced 1.32 1.32 SCE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Forced 39.50 3.50 PGAE North
CAMLOT_2_SOLAR1 Camelot Forced 45.00 0.00 SCE Gen
CAMLOT_2_SOLAR2 Columbia Two Forced 15.00 0.00 SCE Gen
CANTUA_1_SOLAR Cantua Solar Station Forced 20.00 1.00 PGAE South
CARLS1_2_CARCT1 Carlsbad 1 Planned 422.00 0.00 SDGE Gen
CARLS2_1_CARCT1 Carlsbad 2 Forced 105.50 0.00 SDGE Gen
CENTER_2_TECNG1 TECHNICAST Planned 0.99 0.99 SCE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 0.00 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 5.67 PGAE Gen
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 1.03 SDGE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Planned 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 0.00 SCE Gen
CHWCHL_1_BIOMAS Chow II Biomass to Energy Forced 10.80 10.80 PGAE South
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 8.60 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 7.87 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 14.90 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 8.88 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 15.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 14.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Forced 43.00 2.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 37.19 PGAE North
CONTRL_1_CASAD1 Mammoth G1 Forced 10.00 4.30 SCE Gen
CONTRL_1_OXBOW Dixie Valley Geo Forced 60.00 5.00 SCE Gen
COPMTN_2_SOLAR1 Copper Mountain 48 Forced 48.00 0.00 SCE Gen
COVERD_2_HCKHY1 HATCHET CREEK Forced 6.89 6.89 PGAE Gen
COVERD_2_RCKHY1 ROARING CREEK Forced 2.00 2.00 PGAE Gen
COWCRK_2_UNIT Cow Creek Hydro Forced 2.00 1.00 PGAE Gen
CRNEVL_6_CRNVA Crane Valley Forced 0.90 0.90 PGAE Gen
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Planned 3.20 3.20 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 0.00 PGAE Gen
CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN Planned 7.00 7.00 PGAE South
CSTRVL_7_PL1X2 Marina Land Fill Gas Planned 4.53 1.13 PGAE South
DEADCK_1_UNIT DEADCK_1_UNIT Planned 2.00 2.00 PGAE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 103.00 PGAE Gen
DIABLO_7_UNIT 2 Diablo Canyon Unit 2 Forced 1150.00 17.20 PGAE South
DINUBA_6_UNIT Dinuba Energy, Inc. Forced 12.00 12.00 PGAE South
DIXNLD_1_LNDFL Zero Waste Energy Forced 1.60 0.79 PGAE Gen
DONNLS_7_UNIT Donnells Hydro Forced 72.00 7.00 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 2.13 PGAE South
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 14.40 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 5.80 PGAE South
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 36.80 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 143.00 EIM ARI
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 143.00 SCE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 0.00 SDGE Gen
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 32.70 PGAE Gen
ENWIND_2_WIND1 Cameron Ridge Forced 47.10 2.60 SCE Gen
ENWIND_2_WIND2 Ridgetop I Forced 38.24 8.44 SCE Gen
ESCNDO_6_EB3BT3 Escondido BESS 3 Planned 10.00 2.50 SDGE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Forced 48.71 0.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 2.06 SCE Gen
ETIWND_2_RTS026 SPVP026 Forced 6.00 1.50 SCE Gen
ETIWND_2_UNIT1 New Indy Ontario Forced 33.60 29.60 SCE Gen
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 0.00 PGAE Gen
FLOWD_2_WIND1 Cameron Ridge 2 Forced 11.90 0.00 SCE Gen
FORBST_7_UNIT 1 FORBESTOWN HYDRO Planned/Forced 37.50 37.50 PGAE North
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30 PGAE Gen
GANSO_1_WSTBM1 Weststar Dairy Biogas Forced 1.00 0.00 PGAE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 1.50 SCE Gen
GARNET_1_WT3WND Wagner Wind Forced 6.00 6.00 SCE Gen
GARNET_2_DIFWD1 Difwind Forced 7.88 0.00 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 0.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 585.00 42.52 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 3.40 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 16.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 45.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 15.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 42.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 1.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 33.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 22.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00 PGAE South
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_ELLWOD ELLWOOD ENERGY SUPPORT FACILITY Forced 54.00 0.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRNLF1_1_UNITS Greenleaf 1 Forced 49.20 0.00 PGAE North
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Forced 3.04 0.00 PGAE South
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Forced 98.46 7.12 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 5.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 11.00 PGAE Gen
GYSRVL_7_WSPRNG Warm Springs Hydro Forced 3.75 3.75 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 8.00 PGAE Gen
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Forced 407.00 0.00 PGAE South
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Forced 407.00 0.00 PGAE South
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 4.61 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 4.16 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 66.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned/Forced 4.90 4.90 PGAE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Forced 65.08 0.00 PGAE North
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Forced 97.62 0.00 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 403.10 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 7.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 7.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 6.69 SCE Gen
INDVLY_1_UNITS Indian Valley Hydro Forced 3.01 3.01 PGAE North
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 24.20 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 60.00 PGAE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
IVANPA_1_UNIT1 Ivanpah 1 Forced 126.00 126.00 SCE Gen
IVANPA_1_UNIT3 Ivanpah 3 Forced 133.00 133.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 12.80 SCE Gen
KELSO_2_UNITS Mariposa Energy Forced 198.03 1.76 PGAE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Forced 11.00 11.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 3.10 PGAE South
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 1.69 PGAE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 0.00 PGAE South
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 1.66 PGAE Gen
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 12.80 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 12.20 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 11.15 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 145.00 5.00 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 3.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 5.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 7.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 32.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 4.84 PGAE South
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 7.20 PGAE South
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned/Forced 561.29 0.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 27.38 PGAE Gen
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 125.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 19.50 SCE Gen
MERCFL_6_UNIT Merced Falls Powerhouse Forced 3.50 1.00 PGAE South
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 35.16 PGAE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.99 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 1.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned 11.00 11.00 SCE Gen
MONLTS_2_MONWD4 Monolith 4 Forced 4.75 0.00 SCE Gen
MONLTS_2_MONWD5 Monolith 5 Forced 4.04 0.00 SCE Gen
MONLTS_2_MONWD6 Monolith 6 Forced 5.25 0.00 SCE Gen
MONLTS_2_MONWD7 Monolith 7 Forced 4.76 0.00 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 39.58 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 39.58 SDGE Gen
MRGT_6_MEF2 Miramar Energy Facility II Forced 47.90 3.90 SDGE Gen
MRGT_6_MMAREF Miramar Energy Facility Forced 48.00 3.00 SDGE Gen
MSHGTS_6_MMARLF MIRAMAR LANDFILL Forced 5.00 3.00 SDGE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 46.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Forced 44.40 3.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Forced 22.20 0.60 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 1.98 SCE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Planned 12.00 12.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 27.90 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 6.00 EIM ARI
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 6.00 SDGE Gen
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Forced 12.00 8.98 PGAE Gen
OASIS_6_SOLAR2 Oasis Solar Forced 20.00 1.00 SCE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 1.70 PGAE South
OLDRV1_6_SOLAR Old River One Forced 20.00 1.50 PGAE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 5.00 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 3.91 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 4.21 SCE Gen
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Forced 775.00 25.00 SCE Gen
ORTGA_6_ME1SL1 Merced 1 Forced 3.00 0.13 PGAE Gen
OSO_6_NSPIN OSO_6_NSPIN Planned 70.80 70.80 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 25.68 SDGE Gen
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 19.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.42 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.68 SCE Gen
PARDEB_6_UNITS Pardee Power House Forced 30.00 10.00 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 94.00 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 111.30 7.70 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.70 5.59 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 7.09 SDGE Gen
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 4.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 5.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 4.70 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 3.60 PGAE North
PLAINV_6_DSOLAR Western Antelope Dry Ranch Forced 10.00 1.50 SCE Gen
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLAR3 Sierra Solar Greenworks LLC Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 6.39 PGAE Gen
PNCHVS_2_SOLAR Panoche Valley Solar Forced 240.00 178.00 PGAE Gen
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Forced 69.00 69.00 PGAE North
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 204.60 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 4.99 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned 2.25 2.25 SCE Gen
RECTOR_7_TULARE MM Tulare Forced 1.50 0.69 SCE Gen
REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 Forced 175.00 55.00 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Forced 505.96 255.96 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Forced 495.90 20.90 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 1.00 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.50 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 16.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 620.50 0.50 PGAE South
RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 Forced 49.00 0.00 SCE Gen
RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 Forced 49.00 0.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Forced 48.35 0.00 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Forced 48.50 0.00 SCE Gen
RVSIDE_6_SPRING SPRINGS GENERATION PROJECT AGGREGATE Forced 36.00 0.00 SCE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 36.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 1.60 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SBERDO_2_RTS005 SPVP005 Redlands RT Solar Forced 2.50 1.00 SCE Gen
SBERDO_2_RTS016 SPVP016 Redlands RT Solar Forced 1.50 1.10 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.45 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 3.93 SCE Gen
SCEC_1_RDRR39 SEP-C-LSCE Forced 44.00 44.00 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 70.01 SCE Gen
SCEN_6_RDRR13 SEP-N-LSCE Forced 11.00 11.00 SCE Gen
SCEW_2_RDRR27 SEP-W-LSCE Forced 42.00 42.00 SCE Gen
SCHD_1_RDRR12 SEP-HD-LSCE Forced 3.00 3.00 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 336.04 20.28 PGAE Gen
SCNW_6_RDRR11 SEP-NW-LSCE Forced 8.00 8.00 SCE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 2.23 PGAE Gen
SLRMS3_2_SRMSR1 SILVER RIDGE MOUNT SIGNAL 3 Planned 250.00 250.00 SDGE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 22.43 PGAE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Planned/Forced 13.00 13.00 PGAE North
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 2.00 PGAE Gen
SNCLRA_2_HOWLNG Houwelings Nurseries Oxnard, Inc Forced 13.00 8.78 SCE Gen
SOUTH_2_UNIT SOUTH HYDRO Planned 7.10 0.00 PGAE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Planned/Forced 6.50 6.50 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Forced 11.40 9.70 PGAE North
SPBURN_7_SNOWMT SPBURN_7_SNOWMT Forced 3.00 3.00 PGAE North
SPIFBD_1_PL1X2 SIERRA PACIFIC IND. (SONORA) Forced 7.50 7.50 PGAE Gen
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Forced 7.00 7.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 36.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 29.00 PGAE South
SUNSHN_2_LNDFL Sunshine Gas Producers Forced 20.00 3.00 SCE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 85.00 7.86 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 85.00 9.04 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 85.00 7.63 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 85.00 8.44 SCE Gen
S_RITA_6_SOLAR1 Sun Harvest Solar Forced 1.50 0.50 PGAE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 16.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 0.00 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Forced 62.00 25.00 PGAE North
TULEWD_1_TULWD1 Tule Wind Forced 127.60 2.30 SDGE Gen
TWISSL_6_SOLAR Nickel 1 ("NLH1") Forced 1.50 0.70 PGAE Gen
ULTPCH_1_UNIT 1 Pacific Ultrapower Chinese Station Forced 18.00 18.00 PGAE North
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 3.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 2.30 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 21.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 2.30 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 0.00 PGAE North
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61 PGAE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Forced 5.75 5.75 SCE Gen
VERNON_6_MALBRG Malburg Generating Station Planned 134.00 11.00 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 36.80 SCE Gen
VICTOR_1_CREST Victor Aggregate Solar Resources Forced 24.49 0.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 59.00 2.00 SCE Gen
VOLTA_6_BAILCK Bailey Creek Ranch Planned 0.63 0.57 PGAE Gen
VSTAES_6_VESBT1 Vista Energy Storage Forced 39.90 0.00 SDGE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Planned 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Planned 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned/Forced 96.65 96.65 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned 96.65 0.00 SCE Gen
WDLEAF_7_UNIT 1 WOODLEAF HYDRO Planned/Forced 60.00 60.00 PGAE North
WESTVALL_7_UNIT 2 West Valley Unit 2 Forced 40.00 40.00 EIM PAC
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 11.50 SCE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Planned/Forced 18.40 0.00 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00 PGAE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 0.50 PGAE Gen
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
EIM ARI 0 2 149.00 0.00
EIM PAC 0 1 0.00 40.00
PGAE Gen 22 92 1455.34 829.06
PGAE North 5 30 170.78 273.81
PGAE South 5 33 186.01 137.14
SCE Gen 32 120 1814.21 1012.80
SDGE Gen 3 21 142.74 250.00
Total 67 299 3918.08 2542.81


Report Generated on:
07/16/2018 08:30:00 (PPT)
Filtered Parameters:
Date = 07/15/2018
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.