Resource ID |
Resource Name
|
Outage Type
|
Capacity (MW)
|
Curtailed (MW)
|
Zone Name
|
ADLIN_1_UNITS |
GEYSERS AIDLIN AGGREGATE |
Forced |
22.00 |
9.00 |
PGAE Gen |
ADOBEE_1_SOLAR |
Adobe Solar |
Forced |
20.00 |
0.00 |
PGAE Gen |
ALAMIT_7_UNIT 4 |
ALAMITOS GEN STA. UNIT 4 |
Forced |
335.67 |
0.00 |
SCE Gen |
ALAMIT_7_UNIT 5 |
ALAMITOS GEN STA. UNIT 5 |
Forced |
497.97 |
27.97 |
SCE Gen |
ALAMIT_7_UNIT 6 |
ALAMITOS GEN STA. UNIT 6 |
Forced |
495.00 |
35.00 |
SCE Gen |
ALLGNY_6_HYDRO1 |
Salmon Creek Hydroelectric Project |
Forced |
0.52 |
0.52 |
PGAE Gen |
ALMEGT_1_UNIT 1 |
ALAMEDA GT UNIT 1 |
Forced |
23.40 |
23.40 |
PGAE South |
ALTA4B_2_CPCW6 |
Mustang Hills |
Planned |
150.00 |
6.00 |
SCE Gen |
ANAHM_7_CT |
ANAHEIM COMBUSTION TURBINE |
Forced |
42.81 |
42.81 |
SCE Gen |
BALCHS_7_UNIT 1 |
BALCH 1 PH UNIT 1 |
Forced |
33.00 |
2.00 |
PGAE South |
BARRE_6_PEAKER |
Barre Peaker |
Forced |
47.00 |
0.00 |
SCE Gen |
BIGCRK_2_EXESWD |
BIG CREEK HYDRO PROJECT PSP |
Planned |
820.00 |
149.00 |
SCE Gen |
BIGSKY_2_BSKSR6 |
Big Sky Solar 6 |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR2 |
Big Sky Solar 4 |
Forced |
40.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR3 |
Big Sky Summer |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR4 |
Western Antelope Blue Sky Ranch B |
Forced |
20.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR5 |
Big Sky Solar 2 |
Forced |
5.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR6 |
Solverde 1 |
Forced |
85.00 |
0.00 |
SCE Gen |
BIGSKY_2_SOLAR7 |
Big Sky Solar 1 |
Forced |
50.00 |
0.00 |
SCE Gen |
BISHOP_1_ALAMO |
BISHOP CREEK PLANT 2 AND 6 |
Forced |
13.40 |
2.40 |
SCE Gen |
BISHOP_1_UNITS |
BISHOP CREEK PLANT 3 AND 4 |
Planned |
15.80 |
0.00 |
SCE Gen |
BLAST_1_WIND |
Mountain View IV Wind |
Planned |
49.00 |
2.00 |
SCE Gen |
BLULKE_6_BLUELK |
Blue Lake Power |
Forced |
12.00 |
12.00 |
PGAE Gen |
BRDSLD_2_HIWIND |
High Winds Energy Center |
Forced |
162.00 |
10.80 |
PGAE Gen |
BRDSLD_2_SHILO1 |
Shiloh I Wind Project |
Forced |
150.00 |
21.00 |
PGAE Gen |
BRDSLD_2_SHILO2 |
SHILOH WIND PROJECT 2 |
Planned |
150.00 |
8.00 |
PGAE Gen |
BUCKWD_1_QF |
Buckwind Re-powering project |
Forced |
16.50 |
3.00 |
SCE Gen |
BUCKWD_7_WINTCV |
Wintec Energy, Ltd. |
Forced |
1.32 |
1.32 |
SCE Gen |
BUTTVL_7_UNIT 1 |
BUTT VALLEY HYDRO |
Forced |
39.50 |
3.50 |
PGAE North |
CANTUA_1_SOLAR |
Cantua Solar Station |
Forced |
20.00 |
1.00 |
PGAE South |
CARLS1_2_CARCT1 |
Carlsbad 1 |
Planned |
422.00 |
0.00 |
SDGE Gen |
CENTER_6_PEAKER |
Center Peaker |
Forced |
47.11 |
0.00 |
SCE Gen |
CHINO_6_SMPPAP |
AltaGas Pomona Energy |
Planned |
44.00 |
44.00 |
SCE Gen |
CHINO_7_MILIKN |
MN Milliken Genco LLC |
Forced |
1.90 |
0.00 |
SCE Gen |
CHWCHL_1_BIOMAS |
Chow II Biomass to Energy |
Forced |
10.80 |
10.80 |
PGAE South |
CNTRVL_6_UNIT |
Centerville |
Forced |
6.40 |
6.40 |
PGAE Gen |
COLGAT_7_UNIT 1 |
Colgate Powerhouse Unit 1 |
Forced |
176.72 |
19.72 |
PGAE North |
COLGAT_7_UNIT 2 |
Colgate Powerhouse Unit 2 |
Forced |
175.67 |
16.67 |
PGAE North |
COLTON_6_AGUAM1 |
AGUA MANSA UNIT 1 (CITY OF COLTON) |
Forced |
43.00 |
2.00 |
SCE Gen |
CONTRL_1_OXBOW |
Dixie Valley Geo |
Forced |
60.00 |
5.00 |
SCE Gen |
COPMTN_2_SOLAR1 |
Copper Mountain 48 |
Forced |
48.00 |
0.00 |
SCE Gen |
COVERD_2_HCKHY1 |
HATCHET CREEK |
Forced |
6.89 |
6.89 |
PGAE Gen |
COVERD_2_RCKHY1 |
ROARING CREEK |
Forced |
2.00 |
2.00 |
PGAE Gen |
CRNEVL_6_SJQN 2 |
SAN JOAQUIN 2 |
Planned |
3.20 |
3.20 |
PGAE Gen |
CRNEVL_6_SJQN 3 |
SAN JOAQUIN 3 |
Forced |
4.20 |
0.00 |
PGAE Gen |
DELAMO_2_SOLAR1 |
Golden Springs Building H |
Forced |
1.50 |
0.00 |
SCE Gen |
DELAMO_2_SOLAR2 |
Golden Springs Building M |
Forced |
1.75 |
0.00 |
SCE Gen |
DELAMO_2_SOLRC1 |
Golden Springs Building C1 |
Forced |
1.16 |
0.00 |
SCE Gen |
DELAMO_2_SOLRD |
Golden Solar Building D |
Forced |
1.25 |
0.00 |
SCE Gen |
DELTA_2_PL1X4 |
DELTA ENERGY CENTER AGGREGATE |
Forced |
880.00 |
90.00 |
PGAE Gen |
DEVERS_1_SOLAR1 |
SEPV8 |
Forced |
12.00 |
0.00 |
SCE Gen |
DINUBA_6_UNIT |
Dinuba Energy, Inc. |
Forced |
12.00 |
12.00 |
PGAE South |
DISCOV_1_CHEVRN |
CHEVRON USA (EASTRIDGE) |
Forced |
48.80 |
27.80 |
PGAE Gen |
DREWS_6_PL1X4 |
Drews Generating Plant |
Forced |
41.40 |
14.40 |
SCE Gen |
DUANE_1_PL1X3 |
DONALD VON RAESFELD POWER PROJECT |
Forced |
147.80 |
5.80 |
PGAE South |
ELKCRK_6_STONYG |
STONEY GORGE HYDRO AGGREGATE |
Forced |
4.90 |
4.90 |
PGAE Gen |
ENWIND_2_WIND1 |
Cameron Ridge |
Forced |
47.10 |
2.60 |
SCE Gen |
ENWIND_2_WIND2 |
Ridgetop I |
Forced |
38.24 |
8.44 |
SCE Gen |
ETIWND_2_RTS026 |
SPVP026 |
Forced |
6.00 |
1.50 |
SCE Gen |
FAIRHV_6_UNIT |
FAIRHAVEN POWER CO. |
Forced |
18.75 |
18.75 |
PGAE North |
FORBST_7_UNIT 1 |
FORBESTOWN HYDRO |
Forced |
37.50 |
37.50 |
PGAE North |
FORKBU_6_UNIT |
HYPOWER, INC. (FORKS OF BUTTE) |
Forced |
14.30 |
14.30 |
PGAE Gen |
GARNET_1_UNITS |
GARNET GREEN POWER PROJECT AGGREGATE |
Forced |
16.50 |
0.00 |
SCE Gen |
GARNET_1_WINDS |
Garnet Winds Aggregation |
Forced |
22.50 |
4.50 |
SCE Gen |
GARNET_2_DIFWD1 |
Difwind |
Forced |
7.88 |
0.00 |
SCE Gen |
GARNET_2_WIND2 |
Karen Avenue Wind Farm |
Planned |
11.70 |
1.50 |
SCE Gen |
GARNET_2_WPMWD6 |
WINTEC PALM |
Forced |
5.93 |
5.93 |
SCE Gen |
GENESI_2_STG |
Genesis Station |
Forced |
250.00 |
0.00 |
SCE Gen |
GEYS11_7_UNIT11 |
GEYSERS UNIT 11 (HEALDSBURG) |
Forced |
74.40 |
3.40 |
PGAE Gen |
GEYS12_7_UNIT12 |
GEYSERS UNIT 12 (HEALDSBURG) |
Forced |
57.00 |
18.00 |
PGAE Gen |
GEYS13_7_UNIT13 |
GEYSERS UNIT 13 (HEALDSBURG) |
Forced |
95.00 |
45.00 |
PGAE Gen |
GEYS14_7_UNIT14 |
GEYSERS UNIT 14 (HEALDSBURG) |
Forced |
70.00 |
16.00 |
PGAE Gen |
GEYS16_7_UNIT16 |
GEYSERS UNIT 16 (HEALDSBURG) |
Forced |
85.00 |
43.00 |
PGAE Gen |
GEYS17_7_UNIT17 |
GEYSERS UNIT 17 (HEALDSBURG) |
Forced |
60.00 |
3.00 |
PGAE Gen |
GEYS18_7_UNIT18 |
GEYSERS UNIT 18 (HEALDSBURG) |
Forced |
72.00 |
27.00 |
PGAE Gen |
GEYS20_7_UNIT20 |
GEYSERS UNIT 20 (HEALDSBURG) |
Forced |
62.00 |
22.00 |
PGAE Gen |
GLNARM_7_UNIT 2 |
GLEN ARM UNIT 2 |
Forced |
22.30 |
22.30 |
SCE Gen |
GOLETA_6_EXGEN |
EXXON COMPANY USA |
Forced |
48.20 |
48.20 |
SCE Gen |
GRNVLY_7_SCLAND |
SANTA CRUZ LANDFILL GENERATING PLANT |
Forced |
3.04 |
1.03 |
PGAE South |
GRSCRK_6_BGCKWW |
BIG CREEK WATER WORKS - CEDAR FLAT |
Forced |
5.00 |
5.00 |
PGAE Gen |
GYS5X6_7_UNITS |
GEYSERS UNITS 5 & 6 AGGREGATE |
Forced |
85.00 |
4.00 |
PGAE Gen |
GYS7X8_7_UNITS |
GEYSERS UNITS 7 & 8 AGGREGATE |
Forced |
82.00 |
7.00 |
PGAE Gen |
HELMPG_7_UNIT 1 |
HELMS PUMP-GEN UNIT 1 |
Forced |
407.00 |
0.00 |
PGAE South |
HMLTBR_6_UNITS |
HAMILTON BRANCH PH (AGGREGATE) |
Planned/Forced |
4.90 |
4.90 |
PGAE Gen |
HYTTHM_2_UNITS |
HYATT-THERMALITO PUMP-GEN (AGGREGATE) |
Planned |
933.10 |
117.10 |
PGAE Gen |
INDIGO_1_UNIT 1 |
INDIGO PEAKER UNIT 1 |
Forced |
44.00 |
7.00 |
SCE Gen |
INDIGO_1_UNIT 2 |
INDIGO PEAKER UNIT 2 |
Forced |
44.53 |
7.53 |
SCE Gen |
INDIGO_1_UNIT 3 |
INDIGO PEAKER UNIT 3 |
Forced |
43.69 |
6.69 |
SCE Gen |
INDVLY_1_UNITS |
Indian Valley Hydro |
Forced |
3.01 |
3.01 |
PGAE North |
INSKIP_2_UNIT |
INSKIP HYDRO |
Forced |
8.00 |
8.00 |
PGAE North |
INTKEP_2_UNITS |
CCSF Hetch_Hetchy Hydro Aggregate |
Forced |
405.00 |
153.00 |
PGAE Gen |
INTMNT_3_RIVERSIDE |
IPPDYN |
Forced |
137.00 |
1.00 |
SCE Gen |
KERKH1_7_UNIT 1 |
KERKHOFF PH 1 UNIT #1 |
Forced |
13.00 |
13.00 |
PGAE North |
KERKH1_7_UNIT 1 |
KERKHOFF PH 1 UNIT #1 |
Forced |
13.00 |
13.00 |
PGAE South |
KERKH1_7_UNIT 3 |
KERKHOFF PH 1 UNIT #3 |
Forced |
12.80 |
12.80 |
PGAE North |
KERKH1_7_UNIT 3 |
KERKHOFF PH 1 UNIT #3 |
Forced |
12.80 |
12.80 |
PGAE South |
KRNCNY_6_UNIT |
KERN CANYON |
Forced |
11.50 |
11.50 |
PGAE South |
LAMONT_1_SOLAR3 |
Woodmere Solar Farm |
Forced |
14.99 |
0.00 |
PGAE Gen |
LAMONT_1_SOLAR4 |
Hayworth Solar Farm |
Forced |
26.66 |
0.00 |
PGAE South |
LAMONT_1_SOLAR5 |
Redcrest Solar Farm |
Forced |
16.66 |
0.00 |
PGAE Gen |
LAPAC_6_UNIT |
LOUISIANA PACIFIC SAMOA |
Forced |
20.00 |
20.00 |
PGAE Gen |
LAPLMA_2_UNIT 1 |
La Paloma Generating Plant Unit #1 |
Forced |
259.80 |
10.80 |
PGAE Gen |
LAPLMA_2_UNIT 2 |
La Paloma Generating Plant Unit #2 |
Forced |
260.20 |
10.20 |
PGAE Gen |
LAPLMA_2_UNIT 3 |
La Paloma Generating Plant Unit #3 |
Forced |
256.15 |
12.15 |
PGAE Gen |
LAPLMA_2_UNIT 4 |
LA PALOMA GENERATING PLANT, UNIT #4 |
Forced |
145.00 |
15.00 |
PGAE Gen |
LARKSP_6_UNIT 1 |
LARKSPUR PEAKER UNIT 1 |
Forced |
46.10 |
3.10 |
SDGE Gen |
LARKSP_6_UNIT 2 |
LARKSPUR PEAKER UNIT 2 |
Forced |
47.98 |
5.98 |
SDGE Gen |
LAROA2_2_UNITA1 |
LR2 |
Forced |
322.00 |
22.00 |
SDGE Gen |
MALAGA_1_PL1X2 |
Malaga Power Aggregate |
Forced |
96.00 |
8.00 |
PGAE Gen |
MALCHQ_7_UNIT 1 |
MALACHA HYDRO L.P. |
Forced |
32.50 |
0.00 |
PGAE Gen |
MALIN_5_GCPDDYN |
Grant County Hydro Facilities |
Forced |
125.00 |
62.00 |
PGAE Gen |
MANZNA_2_WIND |
Manzana Wind |
Forced |
189.00 |
26.25 |
SCE Gen |
MERCFL_6_UNIT |
Merced Falls Powerhouse |
Forced |
3.50 |
1.00 |
PGAE South |
MIDWY3_2_MDSSR1 |
Midway South Solar Farm |
Forced |
20.00 |
15.00 |
SCE Gen |
MNDALY_6_MCGRTH |
McGrath Beach Peaker |
Forced |
47.20 |
0.00 |
SCE Gen |
MONLTH_6_BOREL |
BOREL HYDRO UNITS 1-3 AGGREGATE |
Planned |
11.00 |
11.00 |
SCE Gen |
MONLTS_2_MONWD4 |
Monolith 4 |
Forced |
4.75 |
0.00 |
SCE Gen |
MONLTS_2_MONWD5 |
Monolith 5 |
Forced |
4.04 |
0.00 |
SCE Gen |
MONLTS_2_MONWD6 |
Monolith 6 |
Forced |
5.25 |
0.00 |
SCE Gen |
MONLTS_2_MONWD7 |
Monolith 7 |
Forced |
4.76 |
0.00 |
SCE Gen |
MTNPOS_1_UNIT |
MT.POSO COGENERATION CO. |
Forced |
46.64 |
7.64 |
PGAE South |
MTWIND_1_UNIT 1 |
Mountain View Power Project I |
Planned |
44.40 |
3.00 |
SCE Gen |
MTWIND_1_UNIT 2 |
Mountain View Power Project II |
Planned |
22.20 |
1.80 |
SCE Gen |
MTWIND_1_UNIT 3 |
Mountain View Power Project III |
Forced |
22.44 |
1.98 |
SCE Gen |
NAROW1_2_UNIT |
NARROWS PH 1 UNIT |
Planned |
12.00 |
12.00 |
PGAE North |
NAROW2_2_UNIT |
Narrows Powerhouse Unit 2 |
Forced |
55.00 |
28.20 |
PGAE North |
NCPA_7_GP2UN3 |
NCPA GEO PLANT 2 UNIT 3 |
Forced |
42.42 |
42.42 |
PGAE Gen |
OAK C_7_UNIT 1 |
OAKLAND STATION C GT UNIT 1 |
Forced |
55.00 |
1.50 |
PGAE South |
OAK C_7_UNIT 3 |
OAKLAND STATION C GT UNIT 3 |
Forced |
55.00 |
28.00 |
PGAE South |
ORMOND_7_UNIT 2 |
ORMOND BEACH GEN STA. UNIT 2 |
Forced |
775.00 |
775.00 |
SCE Gen |
ORTGA_6_ME1SL1 |
Merced 1 |
Forced |
3.00 |
0.20 |
PGAE Gen |
OXMTN_6_LNDFIL |
Ox Mountain Landfill Generating Plant |
Forced |
10.62 |
1.02 |
PGAE South |
PACLUM_6_UNIT |
Humboldt Redwood |
Forced |
28.80 |
6.80 |
PGAE North |
PADUA_2_ONTARO |
ONTARIO/SIERRA HYDRO PSP |
Planned |
1.92 |
1.42 |
SCE Gen |
PANSEA_1_PANARO |
Mesa Wind Project |
Planned |
30.00 |
21.68 |
SCE Gen |
PARDEB_6_UNITS |
Pardee Power House |
Forced |
30.00 |
30.00 |
PGAE Gen |
PLAINV_6_DSOLAR |
Western Antelope Dry Ranch |
Forced |
10.00 |
1.50 |
SCE Gen |
PLAINV_6_NLRSR1 |
North Lancaster Ranch |
Forced |
20.00 |
0.00 |
SCE Gen |
PLAINV_6_SOLARC |
Central Antelope Dry Ranch C |
Forced |
20.00 |
0.00 |
SCE Gen |
PNCHVS_2_SOLAR |
Panoche Valley Solar |
Forced |
240.00 |
178.00 |
PGAE Gen |
POTTER_6_UNITS |
Potter Valley |
Forced |
10.10 |
10.10 |
PGAE North |
PWEST_1_UNIT |
PACIFIC WEST 1 WIND GENERATION |
Forced |
2.10 |
2.10 |
SCE Gen |
RAMON_2_SCEDYN |
RAMON_2_SCEDYN |
Forced |
359.60 |
134.60 |
SCE Gen |
RECTOR_2_KAWEAH |
KAWEAH PH 2 & 3 PSP AGGREGATE |
Planned |
6.55 |
4.99 |
SCE Gen |
RECTOR_2_KAWH 1 |
KAWEAH PH 1 UNIT 1 |
Planned |
2.25 |
2.25 |
SCE Gen |
RECTOR_7_TULARE |
MM Tulare |
Forced |
1.50 |
0.69 |
SCE Gen |
REDOND_7_UNIT 6 |
REDONDO GEN STA. UNIT 6 |
Forced |
175.00 |
55.00 |
SCE Gen |
REDOND_7_UNIT 7 |
REDONDO GEN STA. UNIT 7 |
Forced |
505.96 |
505.96 |
SCE Gen |
REDOND_7_UNIT 8 |
REDONDO GEN STA. UNIT 8 |
Forced |
495.90 |
495.90 |
SCE Gen |
RENWD_1_QF |
Renwind re-powering project |
Forced |
10.00 |
1.00 |
SCE Gen |
RICHMN_7_BAYENV |
BAY ENVIRONMENTAL (NOVE POWER) |
Forced |
2.50 |
2.50 |
PGAE Gen |
ROSMDW_2_WIND1 |
Pacific Wind - Phase 1 |
Planned |
140.00 |
44.00 |
SCE Gen |
SALTSP_7_UNITS |
SALT SPRINGS HYDRO AGGREGATE |
Forced |
46.00 |
12.20 |
PGAE North |
SANTFG_7_UNITS |
GEYSERS CALISTOGA AGGREGATE |
Forced |
92.10 |
34.10 |
PGAE Gen |
SANWD_1_QF |
San Gorgonio Farms Wind Farm |
Planned |
31.00 |
0.40 |
SCE Gen |
SAUGUS_2_TOLAND |
Toland Landfill gas to Energy Project |
Forced |
1.57 |
1.57 |
SCE Gen |
SBERDO_2_RTS005 |
SPVP005 Redlands RT Solar |
Forced |
2.50 |
1.00 |
SCE Gen |
SBERDO_2_RTS016 |
SPVP016 Redlands RT Solar |
Forced |
1.50 |
1.10 |
SCE Gen |
SCHNDR_1_FIVPTS |
Five Points Solar Station |
Forced |
15.00 |
0.00 |
PGAE South |
SKERN_6_SOLAR2 |
SKIC Solar |
Forced |
10.00 |
1.70 |
PGAE South |
SLRMS3_2_SRMSR1 |
SILVER RIDGE MOUNT SIGNAL 3 |
Planned |
250.00 |
140.00 |
SDGE Gen |
SLUISP_2_UNITS |
SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) |
Planned |
374.43 |
22.43 |
PGAE Gen |
SLYCRK_1_UNIT 1 |
SLY CREEK HYDRO |
Forced |
13.00 |
0.00 |
PGAE North |
SMUDGO_7_UNIT 1 |
SONOMA POWER PLANT |
Forced |
53.00 |
6.00 |
PGAE Gen |
SPAULD_6_UNIT 3 |
SPAULDING HYDRO PH 3 UNIT |
Planned/Forced |
6.50 |
6.50 |
PGAE North |
SPAULD_6_UNIT12 |
SPAULDING HYDRO PH 1 & 2 AGGREGATE |
Forced |
11.40 |
9.70 |
PGAE North |
SPBURN_7_SNOWMT |
SPBURN_7_SNOWMT |
Forced |
3.00 |
3.00 |
PGAE North |
SPRGAP_1_UNIT 1 |
SPRING GAP HYDRO |
Planned |
7.00 |
7.00 |
PGAE North |
SPRGVL_2_TULE |
TULE RIVER HYDRO PLANT (PG&E) |
Forced |
6.40 |
6.40 |
SCE Gen |
SPRGVL_2_TULESC |
TULE RIVER HYDRO PLANT (SCE) |
Forced |
2.50 |
2.50 |
SCE Gen |
SUNSHN_2_LNDFL |
Sunshine Gas Producers |
Forced |
20.00 |
2.50 |
SCE Gen |
SWIFT_1_NAS |
YERBA BUENA BATTERY |
Forced |
4.80 |
2.10 |
PGAE South |
S_RITA_6_SOLAR1 |
Sun Harvest Solar |
Forced |
1.50 |
0.50 |
PGAE Gen |
TIFFNY_1_DILLON |
TIFFNY_1_DILLON |
Forced |
45.00 |
1.00 |
SCE Gen |
TWISSL_6_SOLAR |
Nickel 1 ("NLH1") |
Forced |
1.50 |
0.70 |
PGAE Gen |
USWND2_1_WIND2 |
Golden Hills B |
Forced |
42.96 |
0.00 |
PGAE Gen |
USWND2_1_WIND3 |
Golden Hills C |
Forced |
46.00 |
0.00 |
PGAE Gen |
USWNDR_2_SMUD |
SOLANO WIND FARM |
Forced |
102.18 |
0.00 |
PGAE Gen |
USWNDR_2_SMUD2 |
Solano Wind Project Phase 3 |
Forced |
127.80 |
0.00 |
PGAE Gen |
VERNON_6_GONZL2 |
H. Gonzales Unit #2 |
Forced |
5.75 |
5.75 |
SCE Gen |
VERNON_6_MALBRG |
Malburg Generating Station |
Planned |
134.00 |
11.00 |
SCE Gen |
VESTAL_2_KERN |
KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE |
Forced |
36.80 |
18.30 |
SCE Gen |
VINCNT_2_WESTWD |
Oasis Power Plant |
Planned |
59.00 |
2.00 |
SCE Gen |
VSTAES_6_VESBT1 |
Vista Energy Storage |
Forced |
39.90 |
1.40 |
SDGE Gen |
WARNE_2_UNIT |
WARNE HYDRO AGGREGATE |
Forced |
76.00 |
0.00 |
SCE Gen |
WDLEAF_7_UNIT 1 |
WOODLEAF HYDRO |
Forced |
60.00 |
15.00 |
PGAE North |
WHEATL_6_LNDFIL |
G2 ENERGY, OSTROM ROAD LLC |
Forced |
3.55 |
1.55 |
PGAE Gen |
WHTWTR_1_WINDA1 |
Whitewater Hill Wind Project |
Forced |
61.50 |
0.00 |
SCE Gen |
WISHON_6_UNITS |
Wishon/San Joaquin #1-A AGGREGATE |
Planned/Forced |
18.40 |
0.00 |
PGAE Gen |
WNDMAS_2_UNIT 1 |
BUENA VISTA ENERGY, LLC |
Forced |
38.00 |
1.00 |
PGAE Gen |
WRGHTP_7_AMENGY |
SMALL QF AGGREGATION - LOS BANOS |
Forced |
2.50 |
1.50 |
PGAE Gen |
WSENGY_1_UNIT 1 |
Wheelabrator Shasta |
Forced |
50.00 |
27.99 |
PGAE North |
ZOND_6_UNIT |
ZOND WINDSYSTEMS INC. |
Forced |
17.10 |
17.10 |
PGAE Gen |
Report Generated on:08/02/2018 08:31:00 (PPT)
Filtered Parameters:
Date = 07/30/2018
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO
System conditions are dynamic and may change, affecting the accuracy of this report.
This report includes all outages, curtailments and temporary operating constraints
reflecting normal operations that are effective at the time of the report.
Because outages may overlap or may not all be simultaneously in effect at the time of this report,
Other real-time reports may indicate a different total outage/curtailment than this report.
This report reflects the best available data at the date and time of the report.
It is a snapshot of conditions existing at the time the report was posted. This report is
initiated once daily 1515 Pacific Time.
The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.