Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 9.00 PGAE Gen
ADOBEE_1_SOLAR Adobe Solar Forced 20.00 0.00 PGAE Gen
AGRICO_6_PL3N5 Fresno Peaker Forced 22.69 0.00 PGAE South
ALAMIT_7_UNIT 5 ALAMITOS GEN STA. UNIT 5 Forced 497.97 37.97 SCE Gen
ALAMIT_7_UNIT 6 ALAMITOS GEN STA. UNIT 6 Forced 495.00 255.00 SCE Gen
ALLGNY_6_HYDRO1 Salmon Creek Hydroelectric Project Forced 0.52 0.52 PGAE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 23.40 23.40 PGAE South
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Forced 23.50 23.50 PGAE South
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 3.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 12.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 4.50 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 12.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 12.60 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 42.81 SCE Gen
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Forced 33.00 2.00 PGAE South
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 329.00 SCE Gen
BIGSKY_2_BSKSR6 Big Sky Solar 6 Planned 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR7 Big Sky Solar 7 Planned 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR8 Big Sky Solar 8 Planned 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR1 Antelope Big Sky Ranch Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Planned/Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Planned/Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Planned/Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Planned/Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Planned/Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Planned/Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 2.40 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned 15.80 0.00 SCE Gen
BLAST_1_WIND Mountain View IV Wind Planned 49.00 2.00 SCE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 9.00 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 2.30 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 3.00 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Planned 150.00 6.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 0.00 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 1.60 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 0.00 SCE Gen
BUCKBL_2_PL1X3 Blythe Energy Center Forced 493.63 0.00 SCE Gen
BUCKCK_7_OAKFLT Oak Flat Planned 1.30 1.30 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 1.50 SCE Gen
BUCKWD_7_WINTCV Wintec Energy, Ltd. Forced 1.32 1.32 SCE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Forced 39.50 3.50 PGAE North
CANTUA_1_SOLAR Cantua Solar Station Forced 20.00 1.00 PGAE South
CARLS1_2_CARCT1 Carlsbad 1 Planned 422.00 0.00 SDGE Gen
CARLS2_1_CARCT1 Carlsbad 2 Forced 105.50 0.00 SDGE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 0.00 SCE Gen
CHEVMN_2_UNITS CHEVRON U.S.A. UNITS 1 & 2 AGGREGATE Planned 124.87 0.00 SCE Gen
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 1.00 SDGE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Planned 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 0.00 SCE Gen
CHWCHL_1_BIOMAS Chow II Biomass to Energy Forced 10.80 10.80 PGAE South
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COLEMN_2_UNIT Coleman Planned 13.00 13.00 PGAE North
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Forced 176.72 19.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 16.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Forced 43.00 2.00 SCE Gen
CONTRL_1_OXBOW Dixie Valley Geo Forced 60.00 5.00 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Forced 11.94 8.94 SCE Gen
COPMTN_2_CM10 Copper Mountain 10 Forced 10.00 0.00 SCE Gen
COPMTN_2_SOLAR1 Copper Mountain 48 Forced 48.00 0.00 SCE Gen
COVERD_2_HCKHY1 HATCHET CREEK Forced 6.89 6.89 PGAE Gen
COVERD_2_RCKHY1 ROARING CREEK Forced 2.00 2.00 PGAE Gen
CPVERD_2_SOLAR Campo Verde Solar Planned 139.00 0.00 SDGE Gen
CRNEVL_6_CRNVA Crane Valley Planned 0.90 0.90 PGAE Gen
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Planned 3.20 3.20 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 0.00 PGAE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 1.50 PGAE South
DEERCR_6_UNIT 1 DEER CREEK Planned 7.00 7.00 PGAE North
DELAMO_2_SOLRC1 Golden Springs Building C1 Forced 1.16 0.00 SCE Gen
DELAMO_2_SOLRD Golden Solar Building D Forced 1.25 0.00 SCE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 82.00 PGAE Gen
DEVERS_1_SOLAR1 SEPV8 Forced 12.00 0.00 SCE Gen
DEVERS_1_SOLAR2 SEPV9 Forced 9.00 0.00 SCE Gen
DIABLO_7_UNIT 1 Diablo Canyon Unit 1 Forced 1150.00 6.00 PGAE South
DIABLO_7_UNIT 2 Diablo Canyon Unit 2 Forced 1150.00 19.00 PGAE South
DINUBA_6_UNIT Dinuba Energy, Inc. Forced 12.00 12.00 PGAE South
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 14.40 SCE Gen
DSABLA_7_UNIT De Sabla Hydro Forced 18.50 18.50 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Forced 296.19 0.00 SCE Gen
DSRTSN_2_SOLAR1 Desert Sunlight 300 Forced 300.00 0.00 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned 250.00 0.00 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 5.80 PGAE South
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 35.00 EIM ARI
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 35.00 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Planned 7.50 1.25 SDGE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 1.60 SDGE Gen
ELDORO_7_UNIT 1 El Dorado Unit 1 Forced 11.00 11.00 PGAE North
ELDORO_7_UNIT 2 El Dorado Unit 2 Forced 11.00 11.00 PGAE North
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 27.70 PGAE Gen
ELNIDP_6_BIOMAS El Nido Biomass to Energy Forced 10.50 10.50 PGAE South
ENWIND_2_WIND1 Cameron Ridge Forced 47.10 2.60 SCE Gen
ENWIND_2_WIND2 Ridgetop I Forced 38.24 8.44 SCE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Forced 48.71 0.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 2.06 SCE Gen
ETIWND_2_RTS026 SPVP026 Forced 6.00 1.50 SCE Gen
ETIWND_2_UNIT1 New Indy Ontario Forced 33.60 29.60 SCE Gen
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 0.00 PGAE Gen
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30 PGAE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 14.50 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_DIFWD1 Difwind Forced 7.88 0.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 1.50 SCE Gen
GARNET_2_WIND4 Windustries Forced 9.80 0.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 2.40 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 18.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 44.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 17.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 42.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 4.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 27.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 22.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 14.00 PGAE South
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Forced 3.04 1.03 PGAE South
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 3.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 8.00 PGAE Gen
GYSRVL_7_WSPRNG Warm Springs Hydro Forced 3.75 3.75 PGAE Gen
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned 144.00 0.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned 144.00 0.00 PGAE South
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 7.70 PGAE Gen
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Forced 407.00 0.00 PGAE South
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Forced 407.00 0.00 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 75.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned/Forced 4.90 4.90 PGAE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Planned 65.08 0.00 PGAE North
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 16.27 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 308.10 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 7.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 7.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 6.69 SCE Gen
INDVLY_1_UNITS Indian Valley Hydro Forced 3.01 3.01 PGAE North
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 0.00 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 223.00 PGAE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
IVWEST_2_SOLAR1 Imperial Valley West ( Q # 608) Planned 150.00 0.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 4.80 SCE Gen
KANSAS_6_SOLAR RE Kansas South Forced 20.00 0.00 PGAE South
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERNRG_1_UNITS South Belridge Cogen Facility Planned 55.20 0.00 PGAE South
KINGRV_7_UNIT 1 KINGS RIVER HYDRO UNIT 1 Planned 51.20 51.20 PGAE South
KIRKER_7_KELCYN KELLER CANYON LANDFILL GEN FACILICITY Forced 3.56 1.91 PGAE South
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 0.00 PGAE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 0.00 PGAE South
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 0.00 PGAE Gen
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 7.80 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 7.20 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 9.15 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 145.00 15.00 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 3.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 5.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 22.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned/Forced 799.47 309.47 SCE Gen
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned/Forced 561.29 354.29 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 25.38 PGAE Gen
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 69.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 27.75 SCE Gen
MERCED_1_SOLAR1 Mission Solar Forced 1.50 1.50 PGAE Gen
MERCED_1_SOLAR2 Merced Solar Forced 1.50 1.50 PGAE South
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 13.16 PGAE Gen
MIDWY3_2_MDSSR1 Midway South Solar Farm Forced 20.00 0.00 SCE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 0.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned 11.00 11.00 SCE Gen
MONLTS_2_MONWD4 Monolith 4 Forced 4.75 0.00 SCE Gen
MONLTS_2_MONWD5 Monolith 5 Forced 4.04 0.00 SCE Gen
MONLTS_2_MONWD6 Monolith 6 Forced 5.25 0.00 SCE Gen
MONLTS_2_MONWD7 Monolith 7 Forced 4.76 0.00 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 39.58 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 39.58 SDGE Gen
MRGT_6_MEF2 Miramar Energy Facility II Forced 47.90 3.90 SDGE Gen
MRGT_6_MMAREF Miramar Energy Facility Forced 48.00 3.00 SDGE Gen
MSOLAR_2_SOLAR2 Mesquite Solar 2 Forced 100.81 0.00 SDGE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 5.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Planned 44.40 1.80 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned 22.20 1.20 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 0.66 SCE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Planned 12.00 12.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 29.30 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 6.00 EIM ARI
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 6.00 SDGE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 1.88 PGAE South
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Forced 775.00 25.00 SCE Gen
ORTGA_6_ME1SL1 Merced 1 Forced 3.00 0.20 PGAE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 27.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 1.58 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.42 SCE Gen
PALOMR_2_PL1X3 Palomar Energy Center Planned 575.00 0.00 SDGE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.68 SCE Gen
PARDEB_6_UNITS Pardee Power House Forced 30.00 10.00 PGAE Gen
PBLOSM_2_SOLAR PearBlossom Forced 9.50 9.50 SCE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 175.00 PGAE Gen
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Forced 82.00 41.00 PGAE North
PLAINV_6_DSOLAR Western Antelope Dry Ranch Forced 10.00 1.50 SCE Gen
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
PNCHVS_2_SOLAR Panoche Valley Solar Forced 240.00 140.00 PGAE Gen
PNOCHE_1_PL1X2 Panoche Peaker Forced 49.97 0.00 PGAE South
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 128.60 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Planned 6.55 4.30 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned 2.25 2.25 SCE Gen
RECTOR_7_TULARE MM Tulare Forced 1.50 0.69 SCE Gen
REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 Forced 175.00 55.00 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Planned/Forced 505.96 30.96 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Forced 495.90 20.90 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 2.50 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.50 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 12.00 SCE Gen
RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 Forced 49.00 0.00 SCE Gen
RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 Forced 49.00 0.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Forced 48.35 0.00 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Forced 48.50 0.00 SCE Gen
RVSIDE_6_SPRING SPRINGS GENERATION PROJECT AGGREGATE Planned/Forced 36.00 0.00 SCE Gen
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Forced 46.00 12.20 PGAE North
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 33.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 0.42 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SAUGUS_7_CHIQCN Chiquita Canyon Landfill Fac Forced 8.00 0.00 SCE Gen
SBERDO_2_RTS005 SPVP005 Redlands RT Solar Forced 2.50 1.00 SCE Gen
SBERDO_2_RTS016 SPVP016 Redlands RT Solar Forced 1.50 1.10 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 0.00 SCE Gen
SCEC_1_PDRP17 CBP-DO-C-LSCE Forced 3.10 3.10 SCE Gen
SCEC_1_RDRR39 SEP-C-LSCE Forced 44.00 44.00 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 70.01 SCE Gen
SCEN_6_RDRR13 SEP-N-LSCE Forced 11.00 11.00 SCE Gen
SCEW_2_PDRP13 CBP-DO-W-LSEL1 Forced 1.40 1.40 SCE Gen
SCEW_2_PDRP35 CBP-DO-W-LSCE Forced 2.00 2.00 SCE Gen
SCEW_2_RDRR27 SEP-W-LSCE Forced 42.00 42.00 SCE Gen
SCHD_1_RDRR12 SEP-HD-LSCE Forced 3.00 3.00 SCE Gen
SCHNDR_1_FIVPTS Five Points Solar Station Forced 15.00 0.00 PGAE South
SCNW_6_PDRP05 CBP-DO-NW-LSCE Forced 1.10 0.00 SCE Gen
SCNW_6_RDRR11 SEP-NW-LSCE Forced 8.00 8.00 SCE Gen
SLRMS3_2_SRMSR1 SILVER RIDGE MOUNT SIGNAL 3 Planned 250.00 97.00 SDGE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 22.43 PGAE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 0.37 PGAE North
SMRCOS_6_LNDFIL San Marcos Energy Planned 1.50 0.00 SDGE Gen
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 0.00 PGAE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Planned/Forced 6.50 6.50 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Forced 11.40 11.40 PGAE North
SPBURN_7_SNOWMT SPBURN_7_SNOWMT Forced 3.00 3.00 PGAE North
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Planned 7.00 7.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STNRES_1_UNIT Covanta Stanislaus Forced 19.90 11.90 PGAE North
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 38.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 32.00 PGAE South
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 3.30 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 85.00 8.19 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 85.00 6.93 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned/Forced 85.00 6.50 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 85.00 3.64 SCE Gen
S_RITA_6_SOLAR1 Sun Harvest Solar Forced 1.50 0.50 PGAE Gen
TANHIL_6_SOLART Berry Cogen 18 Planned 17.00 0.00 PGAE South
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TERMEX_2_PL1X3 TDM Planned 625.00 16.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 1.00 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Planned 62.00 0.00 PGAE North
TOPAZ_2_SOLAR Topaz Solar Farms Forced 550.00 0.00 PGAE South
TRNQL8_2_AZUSR1 Tranquillity 8 Azul Forced 20.00 2.50 PGAE Gen
TRNQLT_2_SOLAR Tranquillity Planned 200.00 0.00 PGAE Gen
TULEWD_1_TULWD1 Tule Wind Forced 127.60 1.10 SDGE Gen
TWISSL_6_SOLAR Nickel 1 ("NLH1") Forced 1.50 0.70 PGAE Gen
UNVRSY_1_UNIT 1 Berry Cogen 38 - Unit 1 Planned 38.00 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 1.79 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 0.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 2.30 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Planned 1.85 0.00 PGAE North
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 26.61 PGAE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Forced 5.75 5.75 SCE Gen
VERNON_6_MALBRG Malburg Generating Station Planned 134.00 11.00 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 18.30 SCE Gen
VINCNT_2_QF VINCENT QFS Forced 207.00 0.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned/Forced 59.00 59.00 SCE Gen
VOLTA_6_BAILCK Bailey Creek Ranch Planned 0.63 0.57 PGAE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SCE Gen
WARNE_2_UNIT WARNE HYDRO AGGREGATE Forced 76.00 0.00 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 11.50 SCE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 18.40 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 1.00 PGAE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 1.50 PGAE Gen
YUBACT_6_UNITA1 Yuba City Energy Center (Calpine) Planned 47.60 0.00 PGAE North
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
PGF1_2_PDRP34 Sunrun August 2018 Cohort 2 Forced 0.10 0.10


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
EIM ARI 0 2 41.00 0.00
PGAE Gen 22 72 1836.01 163.08
PGAE North 12 20 157.73 137.21
PGAE South 6 35 99.14 170.20
SCE Gen 42 120 1742.48 586.08
SDGE Gen 8 20 232.48 0.00
0 1 0.00 0.10
Total 90 270 4108.84 1056.67


Report Generated on:
08/14/2018 08:30:00 (PPT)
Filtered Parameters:
Date = 08/15/2018
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.