Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 9.00 PGAE Gen
ADOBEE_1_SOLAR Adobe Solar Forced 20.00 0.00 PGAE Gen
AGRICO_6_PL3N5 Fresno Peaker Forced 22.69 0.00 PGAE South
ALAMIT_7_UNIT 5 ALAMITOS GEN STA. UNIT 5 Forced 497.97 37.97 SCE Gen
ALAMIT_7_UNIT 6 ALAMITOS GEN STA. UNIT 6 Forced 495.00 255.00 SCE Gen
ALLGNY_6_HYDRO1 Salmon Creek Hydroelectric Project Forced 0.52 0.52 PGAE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 23.40 23.40 PGAE South
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Forced 23.50 23.50 PGAE South
ALT6DN_2_WIND7 Pinyon Pines 1 Forced 168.00 3.00 SCE Gen
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 3.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 6.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 6.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 2.05 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 24.00 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 42.81 SCE Gen
ANZA_6_SOLAR1 Seville Solar One Planned 20.00 0.00 SDGE Gen
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Forced 33.00 2.00 PGAE South
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 428.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 12.08 PGAE South
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 5.21 PGAE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Planned 119.00 0.00 PGAE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 320.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 2.40 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned 15.80 0.00 SCE Gen
BKRFLD_2_SOLAR1 Bakersfield 111 Forced 1.38 0.00 PGAE Gen
BLAST_1_WIND Mountain View IV Wind Planned 49.00 2.00 SCE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BOWMN_6_HYDRO NID Hydro Bowman Powerhouse Planned 3.60 0.00 PGAE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 14.40 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 4.60 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 2.30 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 3.00 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 6.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 4.10 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 6.00 SCE Gen
BUCKBL_2_PL1X3 Blythe Energy Center Forced 493.63 0.00 SCE Gen
BUCKCK_7_OAKFLT Oak Flat Planned 1.30 0.00 PGAE Gen
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Planned 57.25 0.00 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 3.00 SCE Gen
BUCKWD_7_WINTCV Wintec Energy, Ltd. Forced 1.32 1.32 SCE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Planned/Forced 39.50 3.50 PGAE North
CALFTN_2_SOLAR California Flats North Planned 130.00 0.00 PGAE Gen
CANTUA_1_SOLAR Cantua Solar Station Forced 20.00 1.00 PGAE South
CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE Planned 49.00 0.00 PGAE North
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Planned 120.00 0.00 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned 24.00 0.00 PGAE North
CARLS1_2_CARCT1 Carlsbad 1 Planned 422.00 0.00 SDGE Gen
CARLS2_1_CARCT1 Carlsbad 2 Forced 105.50 0.00 SDGE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 0.00 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 5.67 PGAE Gen
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 1.00 SDGE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Planned 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 0.00 SCE Gen
CHWCHL_1_BIOMAS Chow II Biomass to Energy Forced 10.80 10.80 PGAE South
CLOVER_2_UNIT Clover Creek Forced 0.99 0.99 PGAE Gen
CLRKRD_6_LIMESD Lime Saddle Hydro Planned 2.00 0.00 PGAE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 6.53 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 5.81 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 12.85 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 6.81 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned/Forced 176.72 19.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Planned/Forced 175.67 16.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Forced 43.00 2.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 18.14 PGAE North
CONTRL_1_CASAD1 Mammoth G1 Forced 10.00 3.60 SCE Gen
CONTRL_1_OXBOW Dixie Valley Geo Forced 60.00 5.00 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Forced 11.94 8.94 SCE Gen
COPMTN_2_SOLAR1 Copper Mountain 48 Forced 48.00 0.00 SCE Gen
COVERD_2_HCKHY1 HATCHET CREEK Forced 6.89 6.89 PGAE Gen
COVERD_2_RCKHY1 ROARING CREEK Forced 2.00 2.00 PGAE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Planned 70.40 0.00 PGAE North
CRNEVL_6_CRNVA Crane Valley Planned 0.90 0.90 PGAE Gen
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Planned 3.20 3.20 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Planned/Forced 4.20 4.20 PGAE Gen
CSLR4S_2_SOLAR Csolar IV South Planned 130.00 0.00 SDGE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 1.50 PGAE South
DELAMO_2_SOLRC1 Golden Springs Building C1 Forced 1.16 0.00 SCE Gen
DELAMO_2_SOLRD Golden Solar Building D Forced 1.25 0.00 SCE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 82.00 PGAE Gen
DEVERS_1_SOLAR2 SEPV9 Forced 9.00 0.00 SCE Gen
DIABLO_7_UNIT 1 Diablo Canyon Unit 1 Forced 1150.00 20.00 PGAE South
DIABLO_7_UNIT 2 Diablo Canyon Unit 2 Forced 1150.00 36.00 PGAE South
DINUBA_6_UNIT Dinuba Energy, Inc. Forced 12.00 12.00 PGAE South
DISCOV_1_CHEVRN CHEVRON USA (EASTRIDGE) Forced 48.80 27.80 PGAE Gen
DIXNLD_1_LNDFL Zero Waste Energy Forced 1.60 0.60 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 4.23 PGAE South
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 14.40 SCE Gen
DSABLA_7_UNIT De Sabla Hydro Planned 18.50 0.00 PGAE North
DSRTSN_2_SOLAR1 Desert Sunlight 300 Planned 300.00 0.00 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned 250.00 0.00 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 5.80 PGAE South
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 236.80 36.80 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 85.00 EIM ARI
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 85.00 SCE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 1.80 SDGE Gen
ELDORO_7_UNIT 1 El Dorado Unit 1 Forced 11.00 11.00 PGAE North
ELDORO_7_UNIT 2 El Dorado Unit 2 Forced 11.00 11.00 PGAE North
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Planned 93.00 61.30 PGAE North
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned/Forced 551.70 28.70 PGAE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 263.68 SCE Gen
ENWIND_2_WIND1 Cameron Ridge Forced 47.10 2.60 SCE Gen
ENWIND_2_WIND2 Ridgetop I Forced 38.24 8.44 SCE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Forced 48.71 1.50 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 2.06 SCE Gen
ETIWND_2_RTS026 SPVP026 Forced 6.00 1.50 SCE Gen
ETIWND_2_UNIT1 New Indy Ontario Forced 33.60 29.60 SCE Gen
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 0.00 PGAE Gen
FMEADO_6_HELLHL FMEADO_6_HELLHL Planned 0.60 0.00 PGAE North
FMEADO_7_UNIT FRENCH MEADOWS HYDRO Planned 16.00 0.00 PGAE North
FORBST_7_UNIT 1 FORBESTOWN HYDRO Planned 37.50 0.00 PGAE North
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30 PGAE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 0.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_1_WT3WND Wagner Wind Forced 6.00 0.00 SCE Gen
GARNET_2_DIFWD1 Difwind Planned 7.88 0.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 0.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATES_2_SOLAR Gates Solar Station Planned 20.00 0.00 PGAE South
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 585.00 36.87 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 4.40 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 18.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 44.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 19.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 41.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 3.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 27.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 22.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 14.00 PGAE South
GLDFGR_6_SOLAR2 Portal Ridge C Forced 11.40 11.40 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GOLETA_6_TAJIGS GOLETA_6_TAJIGS Planned 2.84 0.00 SCE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Planned 20.00 0.00 PGAE North
GRNLF1_1_UNITS Greenleaf 1 Forced 49.20 0.00 PGAE North
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Forced 98.46 3.80 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 40.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 3.00 PGAE Gen
GYSRVL_7_WSPRNG Warm Springs Hydro Forced 3.75 3.75 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 7.70 PGAE Gen
HAYPRS_6_QFUNTS HAYPRESS HYDRO QF UNITS Planned 14.80 0.00 PGAE North
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Planned/Forced 407.00 0.00 PGAE South
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 2.96 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 2.51 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 70.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned/Forced 4.90 4.90 PGAE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Planned 65.08 0.00 PGAE North
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 16.27 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 308.10 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 7.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 7.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 6.69 SCE Gen
INDVLY_1_UNITS Indian Valley Hydro Forced 3.01 3.01 PGAE North
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 24.20 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 153.00 PGAE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 1.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 6.40 SCE Gen
KELSO_2_UNITS Mariposa Energy Forced 198.03 3.85 PGAE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Planned 11.00 0.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 4.40 PGAE South
KIRKER_7_KELCYN KELLER CANYON LANDFILL GEN FACILICITY Forced 3.56 1.85 PGAE South
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 0.00 PGAE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 0.00 PGAE South
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 0.00 PGAE Gen
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 5.80 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 5.20 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 7.15 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 145.00 15.00 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 3.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 5.98 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 35.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 4.84 PGAE South
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 7.20 PGAE South
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned 561.29 0.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 23.28 PGAE Gen
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 62.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 28.50 SCE Gen
MERCED_1_SOLAR1 Mission Solar Forced 1.50 1.50 PGAE Gen
MERCED_1_SOLAR2 Merced Solar Forced 1.50 1.50 PGAE South
MERCFL_6_UNIT Merced Falls Powerhouse Forced 3.50 1.00 PGAE South
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 22.16 PGAE Gen
MIDWY3_2_MDSSR1 Midway South Solar Farm Forced 20.00 0.00 SCE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.99 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 0.00 SCE Gen
MNDOTA_1_SOLAR1 North Star Solar 1 Planned 60.00 0.00 PGAE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned 11.00 11.00 SCE Gen
MONLTS_2_MONWD4 Monolith 4 Planned 4.75 0.00 SCE Gen
MONLTS_2_MONWD5 Monolith 5 Planned 4.04 0.00 SCE Gen
MONLTS_2_MONWD6 Monolith 6 Planned 5.25 0.00 SCE Gen
MONLTS_2_MONWD7 Monolith 7 Planned 4.76 0.00 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 39.58 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 39.58 SDGE Gen
MRGT_6_MEF2 Miramar Energy Facility II Forced 47.90 3.90 SDGE Gen
MRGT_6_MMAREF Miramar Energy Facility Forced 48.00 3.00 SDGE Gen
MSHGTS_6_MMARLF MIRAMAR LANDFILL Planned 5.00 0.00 SDGE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 4.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Planned 44.40 1.80 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned 22.20 1.20 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 1.32 SCE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Planned 12.00 12.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 32.50 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Planned 12.00 12.00 PGAE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OASIS_6_SOLAR2 Oasis Solar Forced 20.00 1.00 SCE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 2.20 PGAE South
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 2.00 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 2.91 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 2.51 SCE Gen
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Forced 775.00 25.00 SCE Gen
ORTGA_6_ME1SL1 Merced 1 Forced 3.00 0.20 PGAE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 24.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 1.58 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.42 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.68 SCE Gen
PARDEB_6_UNITS Pardee Power House Forced 30.00 30.00 PGAE Gen
PBLOSM_2_SOLAR PearBlossom Forced 9.50 9.50 SCE Gen
PGCC_1_PDRP04 PGCC_1_PDRP04 Planned 1.00 0.00 PGAE Gen
PGCC_1_PDRP08 PGCC_1_PDRP08 Planned 0.99 0.00 PGAE Gen
PGCC_1_PDRP12 PGCC_1_PDRP12 Planned 0.99 0.00 PGAE Gen
PGCC_1_PDRP13 PGCC_1_PDRP13 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP05 PGEB_2_PDRP05 Planned 5.00 0.00 PGAE Gen
PGEB_2_PDRP08 PGEB_2_PDRP08 Planned 1.00 0.00 PGAE Gen
PGEB_2_PDRP09 PGEB_2_PDRP09 Planned 1.00 0.00 PGAE Gen
PGEB_2_PDRP10 PGEB_2_PDRP10 Planned 1.00 0.00 PGAE Gen
PGEB_2_PDRP21 PGEB_2_PDRP21 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP22 PGEB_2_PDRP22 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP23 PGEB_2_PDRP23 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP24 PGEB_2_PDRP24 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP25 PGEB_2_PDRP25 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP26 PGEB_2_PDRP26 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP27 PGEB_2_PDRP27 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP28 PGEB_2_PDRP28 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP29 PGEB_2_PDRP29 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP30 PGEB_2_PDRP30 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP31 PGEB_2_PDRP31 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP34 PGEB_2_PDRP34 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP35 PGEB_2_PDRP35 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP36 PGEB_2_PDRP36 Planned 0.99 0.00 PGAE Gen
PGEB_2_PDRP37 PGEB_2_PDRP37 Planned 0.99 0.00 PGAE Gen
PGF1_2_PDRP03 PGF1_2_PDRP03 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP11 PGF1_2_PDRP11 Planned 3.00 0.00 PGAE Gen
PGF1_2_PDRP16 PGF1_2_PDRP16 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP17 PGF1_2_PDRP17 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP18 PGF1_2_PDRP18 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP19 PGF1_2_PDRP19 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP20 PGF1_2_PDRP20 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP21 PGF1_2_PDRP21 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP24 PGF1_2_PDRP24 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP25 PGF1_2_PDRP25 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP26 PGF1_2_PDRP26 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP27 PGF1_2_PDRP27 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP28 PGF1_2_PDRP28 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP29 PGF1_2_PDRP29 Planned 2.00 0.00 PGAE Gen
PGF1_2_PDRP30 PGF1_2_PDRP30 Planned 2.00 0.00 PGAE Gen
PGFG_1_PDRP05 PGFG_1_PDRP05 Planned 1.00 0.00 PGAE Gen
PGFG_1_PDRP13 PGFG_1_PDRP13 Planned 0.99 0.00 PGAE Gen
PGFG_1_PDRP14 PGFG_1_PDRP14 Planned 0.99 0.00 PGAE Gen
PGFG_1_PDRP15 PGFG_1_PDRP15 Planned 0.99 0.00 PGAE Gen
PGHB_6_PDRP02 PGHB_6_PDRP02 Planned 1.00 0.00 PGAE Gen
PGHB_6_PDRP04 PGHB_6_PDRP04 Planned 0.50 0.00 PGAE Gen
PGHB_6_PDRP05 PGHB_6_PDRP05 Planned 0.99 0.00 PGAE Gen
PGHB_6_PDRP06 PGHB_6_PDRP06 Planned 0.99 0.00 PGAE Gen
PGKN_2_PDRP06 PGKN_2_PDRP06 Planned 2.00 0.00 PGAE Gen
PGKN_2_PDRP07 PGKN_2_PDRP07 Planned 2.00 0.00 PGAE Gen
PGKN_2_PDRP08 PGKN_2_PDRP08 Planned 2.00 0.00 PGAE Gen
PGKN_2_PDRP09 PGKN_2_PDRP09 Planned 2.00 0.00 PGAE Gen
PGNB_2_PDRP02 PGNB_2_PDRP02 Planned 1.00 0.00 PGAE Gen
PGNB_2_PDRP12 PGNB_2_PDRP12 Planned 0.99 0.00 PGAE Gen
PGNB_2_PDRP15 PGNB_2_PDRP15 Planned 0.99 0.00 PGAE Gen
PGNC_1_PDRP01 PGNC_1_PDRP01 Planned 1.00 0.00 PGAE Gen
PGNC_1_PDRP04 PGNC_1_PDRP04 Planned 0.99 0.00 PGAE Gen
PGNC_1_PDRP05 PGNC_1_PDRP05 Planned 0.99 0.00 PGAE Gen
PGNP_2_PDRP08 PGNP_2_PDRP08 Planned 2.00 0.00 PGAE Gen
PGNP_2_PDRP09 PGNP_2_PDRP09 Planned 2.00 0.00 PGAE Gen
PGNP_2_PDRP10 PGNP_2_PDRP10 Planned 2.00 0.00 PGAE Gen
PGNP_2_PDRP11 PGNP_2_PDRP11 Planned 2.00 0.00 PGAE Gen
PGNP_2_PDRP16 PGNP_2_PDRP16 Planned 2.00 0.00 PGAE Gen
PGNP_2_PDRP17 PGNP_2_PDRP17 Planned 2.00 0.00 PGAE Gen
PGNP_2_PDRP18 PGNP_2_PDRP18 Planned 2.00 0.00 PGAE Gen
PGP2_2_PDRP07 PGP2_2_PDRP07 Planned 1.00 0.00 PGAE Gen
PGP2_2_PDRP08 PGP2_2_PDRP08 Planned 1.00 0.00 PGAE Gen
PGP2_2_PDRP22 PGP2_2_PDRP22 Planned 0.99 0.00 PGAE Gen
PGP2_2_PDRP23 PGP2_2_PDRP23 Planned 0.99 0.00 PGAE Gen
PGP2_2_PDRP24 PGP2_2_PDRP24 Planned 0.99 0.00 PGAE Gen
PGP2_2_PDRP25 PGP2_2_PDRP25 Planned 0.99 0.00 PGAE Gen
PGP2_2_PDRP26 PGP2_2_PDRP26 Planned 0.99 0.00 PGAE Gen
PGP2_2_PDRP28 PGP2_2_PDRP28 Planned 0.99 0.00 PGAE Gen
PGP2_2_PDRP29 PGP2_2_PDRP29 Planned 0.99 0.00 PGAE Gen
PGP2_2_PDRP30 PGP2_2_PDRP30 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP04 PGSB_1_PDRP04 Planned 3.00 0.00 PGAE Gen
PGSB_1_PDRP08 PGSB_1_PDRP08 Planned 4.00 0.00 PGAE Gen
PGSB_1_PDRP17 PGSB_1_PDRP17 Planned 0.50 0.00 PGAE Gen
PGSB_1_PDRP29 PGSB_1_PDRP29 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP30 PGSB_1_PDRP30 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP31 PGSB_1_PDRP31 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP32 PGSB_1_PDRP32 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP33 PGSB_1_PDRP33 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP34 PGSB_1_PDRP34 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP35 PGSB_1_PDRP35 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP36 PGSB_1_PDRP36 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP42 PGSB_1_PDRP42 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP43 PGSB_1_PDRP43 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP44 PGSB_1_PDRP44 Planned 0.99 0.00 PGAE Gen
PGSB_1_PDRP45 PGSB_1_PDRP45 Planned 0.99 0.00 PGAE Gen
PGSF_2_PDRP04 PGSF_2_PDRP04 Planned 2.00 0.00 PGAE Gen
PGSF_2_PDRP08 PGSF_2_PDRP08 Planned 1.00 0.00 PGAE Gen
PGSF_2_PDRP12 PGSF_2_PDRP12 Planned 1.00 0.00 PGAE Gen
PGSF_2_PDRP18 PGSF_2_PDRP18 Planned 0.50 0.00 PGAE Gen
PGSF_2_PDRP19 PGSF_2_PDRP19 Planned 0.99 0.00 PGAE Gen
PGSF_2_PDRP20 PGSF_2_PDRP20 Planned 0.99 0.00 PGAE Gen
PGSF_2_PDRP21 PGSF_2_PDRP21 Planned 0.99 0.00 PGAE Gen
PGSF_2_PDRP22 PGSF_2_PDRP22 Planned 0.99 0.00 PGAE Gen
PGSF_2_PDRP23 PGSF_2_PDRP23 Planned 0.99 0.00 PGAE Gen
PGSF_2_PDRP26 PGSF_2_PDRP26 Planned 0.99 0.00 PGAE Gen
PGSF_2_PDRP27 PGSF_2_PDRP27 Planned 0.99 0.00 PGAE Gen
PGSF_2_PDRP28 PGSF_2_PDRP28 Planned 0.99 0.00 PGAE Gen
PGSF_2_PDRP29 PGSF_2_PDRP29 Planned 0.99 0.00 PGAE Gen
PGSI_1_PDRP09 PGSI_1_PDRP09 Planned 0.99 0.00 PGAE Gen
PGSI_1_PDRP11 PGSI_1_PDRP11 Planned 0.99 0.00 PGAE Gen
PGSI_1_PDRP12 PGSI_1_PDRP12 Planned 0.99 0.00 PGAE Gen
PGSI_1_PDRP15 PGSI_1_PDRP15 Planned 0.99 0.00 PGAE Gen
PGSI_1_PDRP16 PGSI_1_PDRP16 Planned 0.99 0.00 PGAE Gen
PGSI_1_PDRP17 PGSI_1_PDRP17 Planned 0.99 0.00 PGAE Gen
PGST_2_PDRP01 PGST_2_PDRP01 Planned 1.00 0.00 PGAE Gen
PGST_2_PDRP07 PGST_2_PDRP07 Planned 0.99 0.00 PGAE Gen
PGST_2_PDRP08 PGST_2_PDRP08 Planned 0.99 0.00 PGAE Gen
PGST_2_PDRP09 PGST_2_PDRP09 Planned 0.99 0.00 PGAE Gen
PGST_2_PDRP10 PGST_2_PDRP10 Planned 0.99 0.00 PGAE Gen
PGST_2_PDRP11 PGST_2_PDRP11 Planned 0.99 0.00 PGAE Gen
PGZP_2_PDRP02 PGZP_2_PDRP02 Planned 4.00 0.00 PGAE Gen
PGZP_2_PDRP07 PGZP_2_PDRP07 Planned 0.99 0.00 PGAE Gen
PGZP_2_PDRP08 PGZP_2_PDRP08 Planned 0.99 0.00 PGAE Gen
PGZP_2_PDRP09 PGZP_2_PDRP09 Planned 0.99 0.00 PGAE Gen
PGZP_2_PDRP10 PGZP_2_PDRP10 Planned 0.99 0.00 PGAE Gen
PGZP_2_PDRP11 PGZP_2_PDRP11 Planned 0.99 0.00 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 184.00 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 111.30 7.74 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.70 5.64 SDGE Gen
PLAINV_6_DSOLAR Western Antelope Dry Ranch Forced 10.00 1.50 SCE Gen
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 5.37 PGAE Gen
PNCHVS_2_SOLAR Panoche Valley Solar Forced 240.00 140.00 PGAE Gen
PNOCHE_1_PL1X2 Panoche Peaker Forced 49.97 0.00 PGAE South
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Planned 69.00 0.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Planned 68.50 0.00 PGAE North
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 133.60 SCE Gen
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Planned 57.00 0.00 PGAE North
RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 Planned 56.90 0.00 PGAE North
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Planned 6.55 4.30 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned 2.25 2.25 SCE Gen
RECTOR_7_TULARE MM Tulare Forced 1.50 0.69 SCE Gen
REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 Forced 175.00 55.00 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Forced 505.96 30.96 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Planned/Forced 495.90 20.90 SCE Gen
REEDLY_6_SOLAR Terzian Forced 1.23 0.00 PGAE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 2.50 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.50 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 4.00 SCE Gen
RTREE_2_WIND2 Rising Tree 2 Forced 19.80 0.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 620.50 23.10 PGAE South
RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 Forced 49.00 49.00 SCE Gen
RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 Forced 49.00 0.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Forced 48.35 0.00 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Forced 48.50 0.00 SCE Gen
RVSIDE_6_SPRING SPRINGS GENERATION PROJECT AGGREGATE Forced 36.00 0.00 SCE Gen
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Planned/Forced 46.00 12.00 PGAE North
SANDLT_2_SUNITS Mojave Solar Forced 275.00 40.00 SCE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 33.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 1.60 SCE Gen
SAUGUS_2_TOLAND Toland Landfill gas to Energy Project Forced 1.57 1.57 SCE Gen
SAUGUS_7_CHIQCN Chiquita Canyon Landfill Fac Forced 8.00 0.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 525.00 275.00 SCE Gen
SBERDO_2_RTS005 SPVP005 Redlands RT Solar Forced 2.50 1.00 SCE Gen
SBERDO_2_RTS016 SPVP016 Redlands RT Solar Forced 1.50 1.10 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.73 SCE Gen
SCEC_1_PDRP05 SCEC_1_PDRP05 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP06 SCEC_1_PDRP06 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP07 SCEC_1_PDRP07 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP08 SCEC_1_PDRP08 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP09 SCEC_1_PDRP09 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP10 SCEC_1_PDRP10 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP11 SCEC_1_PDRP11 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP12 SCEC_1_PDRP12 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP13 SCEC_1_PDRP13 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP14 SCEC_1_PDRP14 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP17 CBP-DO-C-LSCE Forced 3.10 3.10 SCE Gen
SCEC_1_PDRP18 SCEC_1_PDRP18 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP19 SCEC_1_PDRP19 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP20 SCEC_1_PDRP20 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP31 SCEC_1_PDRP31 Planned 5.00 0.00 SCE Gen
SCEC_1_PDRP32 SCEC_1_PDRP32 Planned 6.00 0.00 SCE Gen
SCEC_1_PDRP42 SCEC_1_PDRP42 Planned 5.00 0.00 SCE Gen
SCEC_1_PDRP48 SCEC_1_PDRP48 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP49 SCEC_1_PDRP49 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP50 SCEC_1_PDRP50 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP51 SCEC_1_PDRP51 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP52 SCEC_1_PDRP52 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP53 SCEC_1_PDRP53 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP54 SCEC_1_PDRP54 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP55 SCEC_1_PDRP55 Planned 0.99 0.00 SCE Gen
SCEC_1_PDRP56 SCEC_1_PDRP56 Planned 4.00 0.00 SCE Gen
SCEC_1_RDRR39 SEP-C-LSCE Forced 44.00 44.00 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 70.01 SCE Gen
SCEN_6_PDRP02 SCEN_6_PDRP02 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP06 SCEN_6_PDRP06 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP07 SCEN_6_PDRP07 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP08 SCEN_6_PDRP08 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP09 SCEN_6_PDRP09 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP11 SCEN_6_PDRP11 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP14 SCEN_6_PDRP14 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP15 SCEN_6_PDRP15 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP27 SCEN_6_PDRP27 Planned 3.00 0.00 SCE Gen
SCEN_6_PDRP29 SCEN_6_PDRP29 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP30 SCEN_6_PDRP30 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP31 SCEN_6_PDRP03 Planned 0.99 0.00 SCE Gen
SCEN_6_PDRP32 SCEN_6_PDRP32 Planned 0.99 0.00 SCE Gen
SCEN_6_RDRR13 SEP-N-LSCE Forced 11.00 11.00 SCE Gen
SCEW_2_PDRP13 CBP-DO-W-LSEL1 Forced 1.40 1.40 SCE Gen
SCEW_2_PDRP20 SCEW_2_PDRP20 Planned 5.00 0.00 SCE Gen
SCEW_2_PDRP35 CBP-DO-W-LSCE Forced 2.00 2.00 SCE Gen
SCEW_2_PDRP37 SCEW_2_PDRP37 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP38 SCEW_2_PDRP38 Planned 6.00 0.00 SCE Gen
SCEW_2_PDRP39 SCEW_2_PDRP39 Planned 5.00 0.00 SCE Gen
SCEW_2_PDRP40 SCEW_2_PDRP40 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP41 SCEW_2_PDRP41 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP42 SCEW_2_PDRP42 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP43 SCEW_2_PDRP43 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP44 SCEW_2_PDRP44 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP45 SCEW_2_PDRP45 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP46 SCEW_2_PDRP46 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP47 SCEW_2_PDRP47 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP48 SCEW_2_PDRP48 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP49 SCEW_2_PDRP49 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP50 SCEW_2_PDRP50 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP51 SCEW_2_PDRP51 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP52 SCEW_2_PDRP52 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP53 SCEW_2_PDRP53 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP54 SCEW_2_PDRP54 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP55 SCEW_2_PDRP55 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP56 SCEW_2_PDRP56 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP57 SCEW_2_PDRP57 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP58 SCEW_2_PDRP58 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP59 SCEW_2_PDRP59 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP60 SCEW_2_PDRP60 Planned 0.99 0.00 SCE Gen
SCEW_2_PDRP61 SCEW_2_PDRP61 Planned 0.99 0.00 SCE Gen
SCEW_2_RDRR27 SEP-W-LSCE Forced 42.00 42.00 SCE Gen
SCHD_1_PDRP04 SCHD_1_PDRP04 Planned 0.99 0.00 SCE Gen
SCHD_1_PDRP06 SCHD_1_PDRP06 Planned 0.99 0.00 SCE Gen
SCHD_1_PDRP07 SCHD_1_PDRP07 Planned 0.99 0.00 SCE Gen
SCHD_1_PDRP08 SCHD_1_PDRP08 Planned 0.99 0.00 SCE Gen
SCHD_1_PDRP09 SCHD_1_PDRP09 Planned 0.99 0.00 SCE Gen
SCHD_1_PDRP11 SCHD_1_PDRP11 Planned 3.00 0.00 SCE Gen
SCHD_1_PDRP12 SCHD_1_PDRP12 Planned 3.00 0.00 SCE Gen
SCHD_1_PDRP23 SCHD_1_PDRP23 Planned 0.99 0.00 SCE Gen
SCHD_1_PDRP24 SCHD_1_PDRP24 Planned 0.99 0.00 SCE Gen
SCHD_1_PDRP25 SCHD_1_PDRP25 Planned 0.99 0.00 SCE Gen
SCHD_1_PDRP26 SCHD_1_PDRP26 Planned 0.99 0.00 SCE Gen
SCHD_1_RDRR12 SEP-HD-LSCE Forced 3.00 3.00 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Planned/Forced 336.04 336.04 PGAE Gen
SCLD_1_PDRP09 SCLD_1_PDRP09 Planned 0.99 0.00 SCE Gen
SCLD_1_PDRP10 SCLD_1_PDRP10 Planned 1.00 0.00 SCE Gen
SCLD_1_PDRP11 SCLD_1_PDRP11 Planned 0.99 0.00 SCE Gen
SCNW_6_PDRP05 CBP-DO-NW-LSCE Forced 1.10 0.00 SCE Gen
SCNW_6_PDRP07 SCNW_6_PDRP07 Planned 0.99 0.00 SCE Gen
SCNW_6_PDRP08 SCNW_6_PDRP08 Planned 0.99 0.00 SCE Gen
SCNW_6_PDRP11 SCNW_6_PDRP11 Planned 3.00 0.00 SCE Gen
SCNW_6_PDRP12 SCNW_6_PDRP12 Planned 3.00 0.00 SCE Gen
SCNW_6_PDRP22 SCNW_6_PDRP22 Planned 0.99 0.00 SCE Gen
SCNW_6_PDRP24 SCNW_6_PDRP24 Planned 0.99 0.00 SCE Gen
SCNW_6_PDRP25 SCNW_6_PDRP25 Planned 0.99 0.00 SCE Gen
SCNW_6_PDRP26 SCNW_6_PDRP26 Planned 0.99 0.00 SCE Gen
SCNW_6_PDRP27 SCNW_6_PDRP27 Planned 0.99 0.00 SCE Gen
SCNW_6_PDRP28 SCNW_6_PDRP28 Planned 0.99 0.00 SCE Gen
SCNW_6_RDRR11 SEP-NW-LSCE Forced 8.00 8.00 SCE Gen
SDG1_1_PDRP04 SDG1_1_PDRP04 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP05 SDG1_1_PDRP05 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP06 SDG1_1_PDRP06 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP07 SDG1_1_PDRP07 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP08 SDG1_1_PDRP08 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP09 SDG1_1_PDRP09 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP14 SDG1_1_PDRP14 Planned 1.00 0.00 SDGE Gen
SDG1_1_PDRP15 SDG1_1_PDRP15 Planned 1.00 0.00 SDGE Gen
SDG1_1_PDRP25 SDG1_1_PDRP25 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP26 SDG1_1_PDRP26 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP27 SDG1_1_PDRP27 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP28 SDG1_1_PDRP28 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP30 SDG1_1_PDRP30 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP31 SDG1_1_PDRP31 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP32 SDG1_1_PDRP32 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP33 SDG1_1_PDRP33 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP34 SDG1_1_PDRP34 Planned 1.50 0.00 SDGE Gen
SDG1_1_PDRP37 SDG1_1_PDRP37 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP38 SDG1_1_PDRP38 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP39 SDG1_1_PDRP39 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP40 SDG1_1_PDRP40 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP41 SDG1_1_PDRP41 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP42 SDG1_1_PDRP42 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP43 SDG1_1_PDRP43 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP44 SDG1_1_PDRP44 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP45 SDG1_1_PDRP45 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP46 SDG1_1_PDRP46 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP47 SDG1_1_PDRP47 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP48 SDG1_1_PDRP48 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP49 SDG1_1_PDRP49 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP50 SDG1_1_PDRP50 Planned 0.99 0.00 SDGE Gen
SDG1_1_PDRP51 SDG1_1_PDRP51 Planned 0.99 0.00 SDGE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 4.43 PGAE Gen
SLRMS3_2_SRMSR1 SILVER RIDGE MOUNT SIGNAL 3 Planned 250.00 89.00 SDGE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 22.43 PGAE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Planned/Forced 13.00 0.74 PGAE North
SMRCOS_6_LNDFIL San Marcos Energy Forced 1.50 0.70 SDGE Gen
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 0.00 PGAE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Planned/Forced 6.50 6.50 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Planned/Forced 11.40 7.00 PGAE North
SPBURN_7_SNOWMT SPBURN_7_SNOWMT Forced 3.00 3.00 PGAE North
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Planned 7.00 7.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 35.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 32.00 PGAE South
SUNSHN_2_LNDFL Sunshine Gas Producers Forced 20.00 2.50 SCE Gen
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 85.00 8.10 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 85.00 7.02 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 85.00 6.41 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 85.00 3.78 SCE Gen
S_RITA_6_SOLAR1 Sun Harvest Solar Forced 1.50 0.50 PGAE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Planned 14.89 4.31 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Planned 21.24 5.04 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 18.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 1.00 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Planned 62.00 62.00 PGAE North
TOADTW_6_UNIT TOAD TOWN Planned 1.50 0.00 PGAE North
TOPAZ_2_SOLAR Topaz Solar Farms Planned 550.00 0.00 PGAE South
TRNQLT_2_SOLAR Tranquillity Forced 200.00 4.00 PGAE Gen
TULEWD_1_TULWD1 Tule Wind Forced 127.60 1.10 SDGE Gen
TWISSL_6_SOLAR Nickel 1 ("NLH1") Forced 1.50 0.70 PGAE Gen
USWND2_1_WIND1 Golden Hills A Forced 42.96 1.79 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 4.60 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 4.32 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Planned 1.85 0.00 PGAE North
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61 PGAE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Forced 5.75 5.75 SCE Gen
VERNON_6_MALBRG Malburg Generating Station Planned 134.00 11.00 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 18.30 SCE Gen
VICTOR_1_VDRYFA Victor Dry Farm Ranch A Forced 5.00 1.00 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 59.00 3.00 SCE Gen
VOLTA_6_BAILCK Bailey Creek Ranch Planned 0.63 0.57 PGAE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SCE Gen
WDLEAF_7_UNIT 1 WOODLEAF HYDRO Planned 60.00 0.00 PGAE North
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 11.50 SCE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 18.40 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 1.00 PGAE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 1.50 PGAE Gen
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Planned/Forced 17.10 17.10 PGAE Gen
PGF1_2_PDRP34 Sunrun August 2018 Cohort 2 Forced 0.10 0.10


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
EIM ARI 0 1 85.00 0.00
PGAE Gen 156 91 1489.97 973.01
PGAE North 36 18 194.64 149.31
PGAE South 5 43 262.25 108.50
SCE Gen 126 125 1894.42 851.16
SDGE Gen 37 21 210.01 0.00
0 1 0.00 0.10
Total 360 300 4136.29 2082.08


Report Generated on:
08/21/2018 08:31:00 (PPT)
Filtered Parameters:
Date = 08/22/2018
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.