Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 9.00 PGAE Gen
ADOBEE_1_SOLAR Adobe Solar Forced 20.00 0.00 PGAE Gen
ALAMIT_7_UNIT 2 ALAMITOS GEN STA. UNIT 2 Forced 175.00 85.00 SCE Gen
ALAMIT_7_UNIT 6 ALAMITOS GEN STA. UNIT 6 Planned 495.00 495.00 SCE Gen
ALAMO_6_UNIT ALAMO POWER PLANT Forced 17.00 17.00 SCE Gen
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 6.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 6.00 SCE Gen
ALTA3A_2_CPCE8 Alta Wind 8 Planned 150.00 6.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 1.50 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 24.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 18.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ARBWD_6_QF Wind Resource II Planned 19.95 0.00 SCE Gen
ASTORA_2_SOLAR1 Astoria 1 Planned 100.00 0.00 SCE Gen
ASTORA_2_SOLAR2 Astoria 2 Planned/Forced 75.00 0.00 SCE Gen
AVENAL_6_AVPARK Avenal Park Solar Project Forced 6.00 0.00 PGAE South
AVENAL_6_SANDDG Sand Drag Solar Project Forced 19.00 0.00 PGAE Gen
AVENAL_6_SUNCTY Sun City Solar Project Forced 20.00 0.00 PGAE Gen
AVSOLR_2_SOLAR AV SOLAR RANCH 1 Planned 241.50 0.00 SCE Gen
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Forced 33.00 2.00 PGAE South
BALCHS_7_UNIT 2 BALCH 2 PH UNIT 2 Planned 52.50 52.50 PGAE South
BEJNLS_5_BV2SCEDYN Broadview 2 Planned 167.00 167.00 EIM ARI
BEJNLS_5_BV2SCEDYN Broadview 2 Planned 167.00 167.00 SCE Gen
BEKWJS_5_BV1SCEDYN Broadview 1 Planned 130.00 130.00 EIM ARI
BEKWJS_5_BV1SCEDYN Broadview 1 Planned 130.00 130.00 SCE Gen
BGSKYN_2_AS2SR1 Antelope Solar 2 Forced 105.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 403.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned/Forced 13.40 6.00 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned/Forced 15.80 0.00 SCE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Forced 85.00 0.00 PGAE North
BLAST_1_WIND Mountain View IV Wind Planned 49.00 2.00 SCE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDSLD_2_HIWIND High Winds Energy Center Planned/Forced 162.00 26.70 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 10.50 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 0.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 6.15 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 3.65 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 3.00 SCE Gen
BUCKBL_2_PL1X3 Blythe Energy Center Planned 493.63 493.63 SCE Gen
BUCKCK_2_HYDRO Lassen Station Hydro Forced 0.99 0.99 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
BUCKWD_7_WINTCV Wintec Energy, Ltd. Forced 1.32 1.32 SCE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Planned/Forced 39.50 39.50 PGAE North
CABZON_1_WINDA1 Cabazon Wind Project Planned 41.00 41.00 SCE Gen
CAPWD_1_QF Edom Hills Wind Farm Planned 19.55 19.55 SCE Gen
CARLS1_2_CARCT1 Carlsbad 1 Forced 422.00 105.50 SDGE Gen
CATLNA_2_SOLAR2 Catalina Solar 2 Forced 18.00 0.00 SCE Gen
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Forced 5.25 5.25 SDGE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 0.00 SCE Gen
CHINO_2_SOLAR Chino RT Solar 1 Forced 1.00 1.00 SCE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Forced 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 1.90 SCE Gen
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00 PGAE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned/Forced 176.72 176.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Forced 175.67 20.67 PGAE North
CONTRL_1_LUNDY LUNDY Forced 3.00 0.00 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Forced 11.94 0.00 SCE Gen
CORRAL_6_SJOAQN Ameresco San Joaquin Forced 4.30 2.15 PGAE Gen
CRNEVL_6_CRNVA Crane Valley Planned 0.90 0.00 PGAE Gen
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Planned 3.20 0.00 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Planned/Forced 4.20 4.20 PGAE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 2.00 SDGE Gen
CSLR4S_2_SOLAR Csolar IV South Forced 130.00 0.00 SDGE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 2.33 PGAE South
DALYCT_1_FCELL PGE San Francisco State Fuel Cell Forced 1.60 1.60 PGAE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 0.00 PGAE Gen
DIABLO_7_UNIT 1 Diablo Canyon Unit 1 Forced 1150.00 0.00 PGAE South
DINUBA_6_UNIT Dinuba Energy, Inc. Forced 12.00 12.00 PGAE South
DISCOV_1_CHEVRN CHEVRON USA (EASTRIDGE) Forced 48.80 27.80 PGAE Gen
DMDVLY_1_UNITS DIAMOND VALLEY LAKE PUMP-GEN PLANT Forced 21.00 21.00 SCE Gen
DONNLS_7_UNIT Donnells Hydro Forced 72.00 2.00 PGAE Gen
DRUM_7_PL3X4 Drum PH 1 Units 3 & 4 Aggregate Planned 28.90 28.90 PGAE North
DSRTSN_2_SOLAR1 Desert Sunlight 300 Planned/Forced 300.00 0.00 SCE Gen
DSRTSN_2_SOLAR2 Desert Sunlight 250 Planned 250.00 0.00 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 5.80 PGAE South
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned/Forced 236.80 76.80 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 133.00 EIM ARI
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 133.00 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Forced 7.50 0.00 SDGE Gen
ELCAJN_6_LM6K El Cajon Energy Center Planned 48.10 48.10 SDGE Gen
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Planned 93.00 31.30 PGAE North
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 18.70 PGAE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Planned 48.71 0.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ESQUON_6_LNDFIL Neal Road Landfill Generating Facility Forced 2.10 2.10 PGAE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 1.76 SCE Gen
ETIWND_2_RTS010 SPVP010 Fontana RT Solar Forced 1.50 1.00 SCE Gen
ETIWND_2_RTS026 SPVP026 Forced 6.00 2.00 SCE Gen
ETIWND_2_UNIT1 ETIWND_2_UNIT1 Forced 33.60 29.60 SCE Gen
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 0.00 PGAE Gen
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 0.00 PGAE Gen
FRNTBW_6_SOLAR1 Frontier Solar Forced 20.00 0.00 PGAE Gen
GARNET_1_SOLAR2 Garnet Solar Power Generation Station 1 Forced 4.00 0.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 9.18 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_DIFWD1 Difwind Forced 7.88 0.00 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 0.00 SCE Gen
GARNET_2_WIND4 Windustries Forced 9.80 0.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 2.40 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 12.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 43.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 12.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 40.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Planned/Forced 60.00 60.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 31.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 25.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00 PGAE South
GLDFGR_6_SOLAR1 Portal Ridge B Planned 20.00 0.00 SCE Gen
GLDFGR_6_SOLAR2 Portal Ridge C Forced 11.40 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLNARM_7_UNIT 4 GLEN ARM UNIT 4 Planned 42.42 42.42 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Forced 20.00 20.00 PGAE North
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 1.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 0.00 PGAE Gen
GYSRVL_7_WSPRNG Warm Springs Hydro Planned 3.75 0.00 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 21.50 PGAE Gen
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 37.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned 4.90 4.90 PGAE Gen
HURON_6_SOLAR Huron Solar Station Forced 20.00 0.50 PGAE South
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 438.10 PGAE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 0.53 SCE Gen
INDVLY_1_UNITS Indian Valley Hydro Forced 3.01 3.01 PGAE North
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 376.20 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned/Forced 405.00 312.00 PGAE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 137.00 17.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 11.20 SCE Gen
JAWBNE_2_SRWND Sky River Forced 77.00 0.00 SCE Gen
KEKAWK_6_UNIT STS HYDROPOWER LTD. (KEKAWAKA) Forced 5.50 5.50 PGAE Gen
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Planned 25.60 25.60 SCE Gen
KINGRV_7_UNIT 1 KINGS RIVER HYDRO UNIT 1 Planned 51.20 51.20 PGAE South
KIRKER_7_KELCYN KELLER CANYON LANDFILL GEN FACILICITY Forced 3.56 0.00 PGAE South
KRAMER_1_SEGS37 LUZ SOLAR PARTNERS 3-7 AGGREGATE Planned 70.00 70.00 SCE Gen
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 3.80 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 8.20 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 2.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 5.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 36.97 SCE Gen
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned/Forced 561.29 561.29 PGAE Gen
LODI25_2_UNIT 1 LODI GAS TURBINE Planned 23.80 23.80 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 17.88 PGAE Gen
MALAGA_1_PL1X2 Malaga Power Aggregate Forced 96.00 8.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 125.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 5.25 SCE Gen
MERCFL_6_UNIT Merced Falls Powerhouse Planned 3.50 3.50 PGAE South
METEC_2_PL1X3 Metcalf Energy Center Planned/Forced 593.16 303.16 PGAE Gen
MIDWD_6_WNDLND Windland Refresh 1 Planned 7.45 0.00 SCE Gen
MIRLOM_2_CORONA MWD Corona Hydroelectric Recovery Plant Planned 2.85 0.00 SCE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MIRLOM_2_TEMESC MWD Temescal Hydroelectric Recovery Plan Planned 2.85 0.00 SCE Gen
MIRLOM_7_MWDLKM Lake Mathews Hydroelectric Recovery Plan Planned 5.00 0.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Planned 47.49 47.49 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 7.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned 11.00 11.00 SCE Gen
MONLTS_2_MONWD4 Monolith 4 Forced 4.75 0.00 SCE Gen
MONLTS_2_MONWD5 Monolith 5 Forced 4.04 0.00 SCE Gen
MONLTS_2_MONWD6 Monolith 6 Forced 5.25 0.00 SCE Gen
MONLTS_2_MONWD7 Monolith 7 Forced 4.76 0.00 SCE Gen
MONTPH_7_UNITS MONTICELLO HYDRO AGGREGATE Planned 12.50 12.50 PGAE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Planned 494.58 494.58 SDGE Gen
MSOLAR_2_SOLAR3 Mesquite Solar 3, LLC Forced 152.00 0.00 SDGE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 2.40 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 0.60 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Forced 55.00 14.80 PGAE North
NCPA_7_GP1UN2 NCPA GEO PLANT 1 UNIT 2 Planned 34.00 0.00 PGAE Gen
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 4.00 EIM ARI
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 4.00 SDGE Gen
NZWIND_6_CALWND Wind Resource I Planned 9.00 0.00 SCE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OGROVE_6_PL1X2 Orange Grove Energy Center Forced 96.00 0.00 SDGE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 3.64 PGAE South
OLDRIV_6_CESDBM Ces Dairy Biogas Planned 1.00 1.00 PGAE Gen
OLDRIV_6_LKVBM1 Lakeview Dairy Biogas Planned 1.00 1.00 PGAE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 3.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 1.12 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 1.92 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.68 SCE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 99.00 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 111.30 2.34 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.70 0.40 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 0.38 SDGE Gen
PIT3_7_PL1X3 PIT PH 3 UNITS 1, 2 & 3 AGGREGATE Planned 70.60 24.60 PGAE North
PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE Planned 95.00 44.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 0.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 0.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Planned 55.70 0.00 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Planned 54.60 0.00 PGAE North
PLACVL_1_CHILIB Chili Bar Hydro Planned 8.40 8.40 PGAE Gen
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
POTTER_6_UNITS Potter Valley Forced 10.10 7.60 PGAE North
PRCTVY_1_MIGBT1 Miguel BESS Forced 2.00 2.00 SDGE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 249.60 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Planned/Forced 6.55 2.00 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned 2.25 2.25 SCE Gen
REDOND_7_UNIT 5 REDONDO GEN STA. UNIT 5 Forced 178.87 178.87 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Planned 505.96 505.96 SCE Gen
REEDLY_6_SOLAR Terzian Forced 1.23 0.00 PGAE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.50 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 0.00 SCE Gen
RTREE_2_WIND2 Rising Tree 2 Forced 19.80 0.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Planned 48.35 48.35 SCE Gen
SANDLT_2_SUNITS Mojave Solar Planned 275.00 138.00 SCE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 33.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 3.61 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Planned 536.00 0.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Planned 536.00 0.00 SCE Gen
SBERDO_2_REDLND Redlands RT Solar Forced 2.00 1.00 SCE Gen
SBERDO_2_RTS005 SPVP005 Redlands RT Solar Forced 2.50 1.00 SCE Gen
SBERDO_2_RTS016 SPVP016 Redlands RT Solar Forced 1.50 1.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.93 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 133.01 SCE Gen
SCHNDR_1_FIVPTS Five Points Solar Station Planned 15.00 10.00 PGAE South
SCHNDR_1_WSTSDE Westside Solar Station Planned 15.00 0.00 PGAE Gen
SEGS_1_SR2SL2 Sunray 2 Planned 20.00 2.00 SCE Gen
SENTNL_2_CTG1 Sentinel Unit 1 Forced 103.76 0.00 SCE Gen
SENTNL_2_CTG2 Sentinel Unit 2 Forced 95.34 0.00 SCE Gen
SKERN_6_SOLAR1 South Kern Solar PV Plant Forced 20.00 1.00 PGAE South
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 94.43 PGAE Gen
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 3.00 PGAE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Forced 6.50 0.00 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Forced 11.40 7.00 PGAE North
SPBURN_2_UNIT 1 Burney Biomass Forced 22.00 22.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STROUD_6_SOLAR Stroud Solar Station Planned/Forced 20.00 20.00 PGAE South
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 586.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Planned/Forced 248.00 103.00 PGAE South
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned 85.00 85.00 SCE Gen
TRNQLT_2_SOLAR Tranquillity Planned 200.00 0.00 PGAE Gen
TULEWD_1_TULWD1 Tule Wind Forced 127.60 0.00 SDGE Gen
TULLCK_7_UNITS Tullock Hydro Planned 25.90 25.90 PGAE Gen
ULTPFR_1_UNIT 1 Rio Bravo Fresno Planned 24.30 24.30 PGAE South
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 9.00 PGAE Gen
USWND2_1_WIND1 Golden Hills A Planned 42.96 1.79 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 2.30 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 1.80 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 4.60 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 1.85 PGAE North
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61 PGAE Gen
VALLEY_5_REDMTN MWD Red Mountain Hydroelectric Recovery Forced 5.90 5.90 SCE Gen
VALLEY_5_RTS044 SPVP044 Forced 8.00 2.00 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Planned 5.75 5.75 SCE Gen
VERNON_6_GONZL2 H. Gonzales Unit #2 Planned 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 8.80 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 59.00 1.00 SCE Gen
VLCNTR_6_VCSLR2 Valley Center 2 Forced 5.00 5.00 SDGE Gen
WESTPT_2_UNIT West Point Hydro Plant Planned 14.00 14.00 PGAE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Planned/Forced 18.40 4.90 PGAE Gen
WISTRA_2_WRSSR1 Wistaria Ranch Solar Forced 100.00 0.00 SDGE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 1.00 PGAE Gen
WNDSTR_2_WIND Windstar Planned 120.00 4.00 SCE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 1.50 PGAE Gen
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
PGSI_1_PDRP30 PDR-D PGSI LVCEA Forced 0.16 0.16


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
EIM ARI 2 2 137.00 297.00
PGAE Gen 40 72 1648.73 1540.62
PGAE North 9 18 156.77 325.78
PGAE South 10 20 134.69 248.29
SCE Gen 64 83 1502.42 2900.74
SDGE Gen 4 21 133.67 554.93
0 1 0.00 0.16
Total 129 217 3713.28 5867.52


Report Generated on:
02/04/2019 08:30:00 (PPT)
Filtered Parameters:
Date = 02/05/2019
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.