| Resource ID |
Resource Name
|
Outage Type
|
Capacity (MW)
|
Curtailed (MW)
|
Zone Name
|
| ADLIN_1_UNITS |
GEYSERS AIDLIN AGGREGATE |
Forced |
22.00 |
7.00 |
PGAE Gen |
| ADMEST_6_SOLAR |
Adams East |
Planned |
19.00 |
0.00 |
PGAE Gen |
| ADOBEE_1_SOLAR |
Adobe Solar |
Forced |
20.00 |
0.00 |
PGAE Gen |
| ALAMIT_7_UNIT 1 |
ALAMITOS GEN STA. UNIT 1 |
Planned |
174.56 |
174.56 |
SCE Gen |
| ALAMO_6_UNIT |
ALAMO POWER PLANT |
Planned/Forced |
17.00 |
17.00 |
SCE Gen |
| ALMEGT_1_UNIT 1 |
ALAMEDA GT UNIT 1 |
Planned |
23.40 |
23.40 |
PGAE South |
| ALMEGT_1_UNIT 2 |
ALAMEDA GT UNIT 2 |
Planned |
23.50 |
23.50 |
PGAE South |
| ALTA3A_2_CPCE4 |
Alta Wind 4 |
Forced |
102.00 |
6.00 |
SCE Gen |
| ALTA3A_2_CPCE5 |
Alta Wind 5 |
Forced |
168.00 |
3.00 |
SCE Gen |
| ALTA4A_2_CPCW1 |
Alta Wind 1 |
Forced |
150.00 |
15.00 |
SCE Gen |
| ALTA4B_2_CPCW2 |
Alta Wind 2 |
Forced |
150.00 |
0.00 |
SCE Gen |
| ALTA4B_2_CPCW3 |
Alta Wind 3 |
Forced |
150.00 |
3.00 |
SCE Gen |
| ALTA6B_2_WIND11 |
Alta Wind 11 |
Forced |
90.00 |
1.70 |
SCE Gen |
| ALTA6E_2_WIND10 |
Alta Wind 10 |
Forced |
138.00 |
10.00 |
SCE Gen |
| ALTWD_1_QF |
Altwind |
Forced |
28.84 |
18.34 |
SCE Gen |
| ANAHM_2_CANYN3 |
CANYON POWER PLANT UNIT 3 |
Planned |
49.40 |
49.40 |
SCE Gen |
| ANAHM_2_CANYN4 |
CANYON POWER PLANT UNIT 4 |
Planned |
49.40 |
0.00 |
SCE Gen |
| ANAHM_7_CT |
ANAHEIM COMBUSTION TURBINE |
Forced |
42.81 |
42.81 |
SCE Gen |
| ARBWD_6_QF |
Wind Resource II |
Forced |
19.95 |
0.25 |
SCE Gen |
| ARCOGN_2_UNITS |
WATSON COGENERATION |
Forced |
416.60 |
0.00 |
SCE Gen |
| ASTORA_2_SOLAR2 |
Astoria 2 |
Planned |
75.00 |
0.00 |
SCE Gen |
| AVSOLR_2_SOLAR |
AV SOLAR RANCH 1 |
Planned |
241.50 |
0.00 |
SCE Gen |
| BALCHS_7_UNIT 1 |
BALCH 1 PH UNIT 1 |
Forced |
33.00 |
2.00 |
PGAE South |
| BASICE_2_UNITS |
CALPINE AMERICAN I COGEN. |
Forced |
120.00 |
120.00 |
PGAE Gen |
| BDGRCK_1_UNITS |
BADGER CREEK LIMITED |
Forced |
48.08 |
6.08 |
PGAE South |
| BEARMT_1_UNIT |
Bear Mountain Limited |
Forced |
49.21 |
5.21 |
PGAE Gen |
| BIGCRK_2_EXESWD |
BIG CREEK HYDRO PROJECT PSP |
Planned/Forced |
820.00 |
106.00 |
SCE Gen |
| BIGSKY_2_SOLAR2 |
Big Sky Solar 4 |
Forced |
40.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR3 |
Big Sky Summer |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR4 |
Western Antelope Blue Sky Ranch B |
Forced |
20.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR5 |
Big Sky Solar 2 |
Forced |
5.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR6 |
Solverde 1 |
Forced |
85.00 |
0.00 |
SCE Gen |
| BIGSKY_2_SOLAR7 |
Big Sky Solar 1 |
Forced |
50.00 |
0.00 |
SCE Gen |
| BISHOP_1_ALAMO |
BISHOP CREEK PLANT 2 AND 6 |
Planned |
13.40 |
2.40 |
SCE Gen |
| BLAST_1_WIND |
Mountain View IV Wind |
Planned |
49.00 |
2.00 |
SCE Gen |
| BLCKWL_6_SOLAR1 |
Blackwell Solar |
Forced |
12.00 |
0.80 |
PGAE Gen |
| BLULKE_6_BLUELK |
Blue Lake Power |
Forced |
12.00 |
12.00 |
PGAE Gen |
| BNNIEN_7_ALTAPH |
ALTA POWER HOUSE |
Planned |
1.00 |
1.00 |
PGAE Gen |
| BORDER_6_UNITA1 |
CalPeak Power Border Unit 1 |
Forced |
51.25 |
3.25 |
SDGE Gen |
| BRDSLD_2_HIWIND |
High Winds Energy Center |
Forced |
162.00 |
16.20 |
PGAE Gen |
| BRDSLD_2_MTZUM2 |
NextEra Energy Montezuma Wind II |
Forced |
78.20 |
2.30 |
PGAE Gen |
| BRDSLD_2_MTZUMA |
FPL Energy Montezuma Wind |
Forced |
36.80 |
0.00 |
PGAE Gen |
| BRDSLD_2_SHILO1 |
Shiloh I Wind Project |
Forced |
150.00 |
4.50 |
PGAE Gen |
| BRDSLD_2_SHILO2 |
SHILOH WIND PROJECT 2 |
Forced |
150.00 |
0.00 |
PGAE Gen |
| BRDSLD_2_SHLO3A |
Shiloh III Wind Project, LLC |
Forced |
102.50 |
0.00 |
PGAE Gen |
| BRDSLD_2_SHLO3B |
Shiloh IV Wind Project |
Forced |
100.00 |
26.20 |
PGAE Gen |
| BRODIE_2_WIND |
Coram Brodie Wind Project |
Forced |
102.00 |
6.00 |
SCE Gen |
| BUCKCK_2_HYDRO |
Lassen Station Hydro |
Forced |
0.99 |
0.99 |
PGAE Gen |
| BUCKWD_1_QF |
Buckwind Re-powering project |
Forced |
16.50 |
1.50 |
SCE Gen |
| BUTTVL_7_UNIT 1 |
BUTT VALLEY HYDRO |
Planned |
39.50 |
39.50 |
PGAE North |
| CALFTS_2_CFSSR1 |
California Flats Solar South |
Forced |
150.00 |
3.00 |
PGAE Gen |
| CARBOU_7_PL2X3 |
CARIBOU PH 1 UNIT 2 & 3 AGGREGATE |
Planned |
49.00 |
0.00 |
PGAE North |
| CARBOU_7_PL4X5 |
CARIBOU PH 2 UNIT 4 & 5 AGGREGATE |
Planned |
120.00 |
0.00 |
PGAE North |
| CARBOU_7_UNIT 1 |
CARIBOU PH 1 UNIT 1 |
Planned |
24.00 |
0.00 |
PGAE North |
| CARLS1_2_CARCT1 |
Carlsbad 1 |
Forced |
422.00 |
422.00 |
SDGE Gen |
| CARLS2_1_CARCT1 |
Carlsbad 2 |
Forced |
105.50 |
105.50 |
SDGE Gen |
| CATLNA_2_SOLAR |
Catalina Solar - Phases 1 and 2 |
Forced |
110.00 |
0.00 |
SCE Gen |
| CENTER_2_RHONDO |
MWD Rio Hondo Hydroelectric Recovery Pla |
Planned/Forced |
1.91 |
1.91 |
SCE Gen |
| CENTER_6_PEAKER |
Center Peaker |
Forced |
47.11 |
0.00 |
SCE Gen |
| CHALK_1_UNIT |
CHALK CLIFF LIMITED |
Forced |
48.67 |
4.37 |
PGAE Gen |
| CHINO_6_SMPPAP |
AltaGas Pomona Energy |
Forced |
44.00 |
44.00 |
SCE Gen |
| CHINO_7_MILIKN |
MN Milliken Genco LLC |
Forced |
1.90 |
1.90 |
SCE Gen |
| CLOVER_2_UNIT |
Clover Creek |
Planned |
0.99 |
0.99 |
PGAE Gen |
| CLRKRD_6_LIMESD |
Lime Saddle Hydro |
Forced |
2.00 |
2.00 |
PGAE Gen |
| CNTRVL_6_UNIT |
Centerville |
Forced |
6.40 |
6.40 |
PGAE Gen |
| COCOPP_2_CTG1 |
Marsh Landing 1 |
Forced |
204.20 |
4.01 |
PGAE South |
| COCOPP_2_CTG2 |
Marsh Landing 2 |
Forced |
202.70 |
3.35 |
PGAE South |
| COCOPP_2_CTG3 |
Marsh Landing 3 |
Forced |
208.96 |
10.04 |
PGAE South |
| COCOPP_2_CTG4 |
Marsh Landing 4 |
Forced |
204.29 |
3.50 |
PGAE South |
| COLGAT_7_UNIT 1 |
Colgate Powerhouse Unit 1 |
Planned/Forced |
176.72 |
11.72 |
PGAE North |
| COLGAT_7_UNIT 2 |
Colgate Powerhouse Unit 2 |
Planned/Forced |
175.67 |
10.67 |
PGAE North |
| COLTON_6_AGUAM1 |
AGUA MANSA UNIT 1 (CITY OF COLTON) |
Forced |
43.00 |
2.00 |
SCE Gen |
| COLUSA_2_PL1X3 |
Colusa Generating Station |
Planned |
641.00 |
641.00 |
PGAE North |
| CONTRL_1_CASAD1 |
Mammoth G1 |
Forced |
10.00 |
0.00 |
SCE Gen |
| CONTRL_1_CASAD3 |
Mammoth G3 |
Planned/Forced |
14.00 |
14.00 |
SCE Gen |
| CONTRL_1_OXBOW |
Dixie Valley Geo |
Forced |
60.00 |
3.00 |
SCE Gen |
| CORRAL_6_SJOAQN |
Ameresco San Joaquin |
Forced |
4.30 |
4.30 |
PGAE Gen |
| COWCRK_2_UNIT |
Cow Creek Hydro |
Forced |
2.00 |
2.00 |
PGAE Gen |
| CRNEVL_6_CRNVA |
Crane Valley |
Forced |
0.90 |
0.90 |
PGAE Gen |
| CRNEVL_6_SJQN 3 |
SAN JOAQUIN 3 |
Forced |
4.20 |
4.20 |
PGAE Gen |
| CRSTWD_6_KUMYAY |
Kumeyaay Wind Farm |
Forced |
50.00 |
8.00 |
SDGE Gen |
| CSTRVL_7_PL1X2 |
Marina Land Fill Gas |
Forced |
4.53 |
1.53 |
PGAE South |
| DEADCK_1_UNIT |
DEADCK_1_UNIT |
Planned |
2.00 |
2.00 |
PGAE Gen |
| DELAMO_2_SOLRC1 |
Golden Springs Building C1 |
Forced |
1.16 |
0.00 |
SCE Gen |
| DELAMO_2_SOLRD |
Golden Solar Building D |
Forced |
1.25 |
0.00 |
SCE Gen |
| DELTA_2_PL1X4 |
DELTA ENERGY CENTER AGGREGATE |
Planned/Forced |
880.00 |
880.00 |
PGAE Gen |
| DEVERS_1_SEPV05 |
SEPV 5 |
Forced |
2.00 |
0.00 |
SCE Gen |
| DEVERS_1_SOLAR2 |
SEPV9 |
Planned |
9.00 |
0.00 |
SCE Gen |
| DINUBA_6_UNIT |
Dinuba Energy, Inc. |
Forced |
12.00 |
12.00 |
PGAE South |
| DONNLS_7_UNIT |
Donnells Hydro |
Forced |
72.00 |
7.00 |
PGAE Gen |
| DOUBLC_1_UNITS |
DOUBLE "C" LIMITED |
Forced |
52.23 |
1.23 |
PGAE South |
| DREWS_6_PL1X4 |
Drews Generating Plant |
Forced |
41.40 |
23.40 |
SCE Gen |
| DUANE_1_PL1X3 |
DONALD VON RAESFELD POWER PROJECT |
Forced |
147.80 |
5.80 |
PGAE South |
| DUTCH1_7_UNIT 1 |
DUTCH FLAT 1 PH |
Planned |
22.00 |
22.00 |
PGAE North |
| DVLCYN_1_UNITS |
DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE |
Planned |
236.80 |
0.00 |
SCE Gen |
| EASTWD_7_UNIT |
EASTWOOD PUMP-GEN |
Forced |
200.00 |
0.00 |
SCE Gen |
| ELCABO_5_ECWSCEDYN |
El Cabo Wind |
Forced |
298.00 |
2.10 |
EIM ARI |
| ELCABO_5_ECWSCEDYN |
El Cabo Wind |
Forced |
298.00 |
2.10 |
SCE Gen |
| ELDORO_7_UNIT 2 |
El Dorado Unit 2 |
Planned |
11.00 |
0.00 |
PGAE North |
| ELKHIL_2_PL1X3 |
ELK HILLS COMBINED CYCLE (AGGREGATE) |
Forced |
551.70 |
27.70 |
PGAE Gen |
| ESCNDO_6_UNITB1 |
CalPeak Power Enterprise Unit 1 |
Forced |
48.04 |
0.04 |
SDGE Gen |
| ESQUON_6_LNDFIL |
Neal Road Landfill Generating Facility |
Forced |
2.10 |
2.10 |
PGAE Gen |
| ETIWND_2_FONTNA |
FONTANALYTLE CREEK POWERHOUSE P |
Planned |
2.56 |
1.36 |
SCE Gen |
| ETIWND_2_RTS010 |
SPVP010 Fontana RT Solar |
Forced |
1.50 |
1.50 |
SCE Gen |
| ETIWND_2_UNIT1 |
ETIWND_2_UNIT1 |
Forced |
33.60 |
29.60 |
SCE Gen |
| EXCHEC_7_UNIT 1 |
EXCHEQUER HYDRO |
Forced |
94.50 |
0.00 |
PGAE South |
| EXCLSG_1_SOLAR |
Excelsior Solar |
Forced |
60.00 |
4.00 |
PGAE Gen |
| FLOWD2_2_FPLWND |
DIABLO WINDS |
Forced |
18.00 |
0.00 |
PGAE Gen |
| FLOWD_2_RT2WD2 |
Ridgetop 2 |
Forced |
27.39 |
0.00 |
SCE Gen |
| FMEADO_7_UNIT |
FRENCH MEADOWS HYDRO |
Forced |
16.00 |
16.00 |
PGAE North |
| FORBST_7_UNIT 1 |
FORBESTOWN HYDRO |
Planned |
37.50 |
37.50 |
PGAE North |
| FORKBU_6_UNIT |
HYPOWER, INC. (FORKS OF BUTTE) |
Forced |
14.30 |
0.00 |
PGAE Gen |
| FRNTBW_6_SOLAR1 |
Frontier Solar |
Forced |
20.00 |
0.00 |
PGAE Gen |
| GARNET_1_SOLAR2 |
Garnet Solar Power Generation Station 1 |
Forced |
4.00 |
0.00 |
SCE Gen |
| GARNET_1_UNITS |
GARNET GREEN POWER PROJECT AGGREGATE |
Forced |
16.50 |
9.09 |
SCE Gen |
| GARNET_1_WIND |
GARNET WIND ENERGY CENTER |
Forced |
6.50 |
0.50 |
SCE Gen |
| GARNET_1_WINDS |
Garnet Winds Aggregation |
Forced |
22.50 |
3.00 |
SCE Gen |
| GARNET_2_DIFWD1 |
Difwind |
Forced |
7.88 |
0.00 |
SCE Gen |
| GARNET_2_WIND2 |
Karen Avenue Wind Farm |
Planned |
11.70 |
1.50 |
SCE Gen |
| GARNET_2_WPMWD6 |
WINTEC PALM |
Forced |
5.93 |
5.93 |
SCE Gen |
| GATWAY_2_PL1X3 |
GATEWAY GENERATING STATION |
Forced |
585.00 |
27.25 |
PGAE South |
| GEYS11_7_UNIT11 |
GEYSERS UNIT 11 (HEALDSBURG) |
Forced |
74.40 |
0.00 |
PGAE Gen |
| GEYS12_7_UNIT12 |
GEYSERS UNIT 12 (HEALDSBURG) |
Forced |
57.00 |
10.00 |
PGAE Gen |
| GEYS13_7_UNIT13 |
GEYSERS UNIT 13 (HEALDSBURG) |
Forced |
95.00 |
43.00 |
PGAE Gen |
| GEYS14_7_UNIT14 |
GEYSERS UNIT 14 (HEALDSBURG) |
Forced |
70.00 |
11.00 |
PGAE Gen |
| GEYS16_7_UNIT16 |
GEYSERS UNIT 16 (HEALDSBURG) |
Forced |
85.00 |
42.00 |
PGAE Gen |
| GEYS17_7_UNIT17 |
GEYSERS UNIT 17 (HEALDSBURG) |
Forced |
60.00 |
0.00 |
PGAE Gen |
| GEYS18_7_UNIT18 |
GEYSERS UNIT 18 (HEALDSBURG) |
Forced |
72.00 |
31.00 |
PGAE Gen |
| GEYS20_7_UNIT20 |
GEYSERS UNIT 20 (HEALDSBURG) |
Forced |
62.00 |
25.00 |
PGAE Gen |
| GILROY_1_UNIT |
GILROY COGEN AGGREGATE |
Planned |
120.00 |
0.00 |
PGAE South |
| GLNARM_7_UNIT 2 |
GLEN ARM UNIT 2 |
Forced |
22.30 |
22.30 |
SCE Gen |
| GOLETA_6_EXGEN |
EXXON COMPANY USA |
Forced |
48.20 |
48.20 |
SCE Gen |
| GRIZLY_1_UNIT 1 |
GRIZZLY HYDRO |
Forced |
20.00 |
20.00 |
PGAE North |
| GWFPWR_1_UNITS |
Hanford Peaker Plant |
Forced |
98.46 |
1.31 |
PGAE Gen |
| GYS5X6_7_UNITS |
GEYSERS UNITS 5 & 6 AGGREGATE |
Forced |
85.00 |
0.00 |
PGAE Gen |
| GYS7X8_7_UNITS |
GEYSERS UNITS 7 & 8 AGGREGATE |
Planned/Forced |
82.00 |
82.00 |
PGAE Gen |
| HAASPH_7_PL1X2 |
HAAS PH UNIT 1 & 2 AGGREGATE |
Planned |
144.00 |
144.00 |
PGAE North |
| HAASPH_7_PL1X2 |
HAAS PH UNIT 1 & 2 AGGREGATE |
Planned |
144.00 |
144.00 |
PGAE South |
| HATCR1_7_UNIT |
Hat Creek #1 |
Planned |
8.50 |
8.50 |
PGAE North |
| HATLOS_6_BWDHY1 |
Bidwell Ditch |
Forced |
2.00 |
2.00 |
PGAE Gen |
| HATRDG_2_WIND |
Hatchet Ridge Wind Farm |
Forced |
102.00 |
0.00 |
PGAE Gen |
| HENRTA_6_SOLAR1 |
Lemoore 1 |
Forced |
1.50 |
1.50 |
PGAE Gen |
| HENRTA_6_UNITA1 |
GWF HENRIETTA PEAKER PLANT UNIT 1 |
Forced |
49.98 |
1.73 |
PGAE South |
| HENRTA_6_UNITA2 |
GWF HENRIETTA PEAKER PLANT UNIT 2 |
Forced |
49.42 |
1.28 |
PGAE South |
| HIDSRT_2_UNITS |
HIGH DESERT POWER PROJECT AGGREGATE |
Forced |
830.00 |
35.00 |
SCE Gen |
| HINSON_6_CARBGN |
BP WILMINGTON CALCINER |
Forced |
30.00 |
30.00 |
SCE Gen |
| HMLTBR_6_UNITS |
HAMILTON BRANCH PH (AGGREGATE) |
Planned/Forced |
4.90 |
4.90 |
PGAE Gen |
| HUMBPP_1_UNITS3 |
Humboldt Bay Generating Station 3 |
Planned |
65.08 |
0.00 |
PGAE North |
| HYTTHM_2_UNITS |
HYATT-THERMALITO PUMP-GEN (AGGREGATE) |
Planned/Forced |
933.10 |
275.10 |
PGAE Gen |
| INDIGO_1_UNIT 2 |
INDIGO PEAKER UNIT 2 |
Forced |
44.53 |
0.53 |
SCE Gen |
| INLDEM_5_UNIT 1 |
Inland Empire Energy Center, Unit 1 |
Forced |
376.20 |
0.00 |
SCE Gen |
| INSKIP_2_UNIT |
INSKIP HYDRO |
Forced |
8.00 |
8.00 |
PGAE North |
| INTKEP_2_UNITS |
CCSF Hetch_Hetchy Hydro Aggregate |
Planned |
405.00 |
33.00 |
PGAE Gen |
| INTMNT_3_RIVERSIDE |
IPPDYN |
Forced |
137.00 |
1.00 |
SCE Gen |
| INTTRB_6_UNIT |
International Turbine Research |
Planned |
18.40 |
7.90 |
PGAE Gen |
| IVANPA_1_UNIT2 |
Ivanpah 2 |
Planned |
133.00 |
0.00 |
SCE Gen |
| JAWBNE_2_NSRWND |
North Sky River Wind Project |
Forced |
160.00 |
19.20 |
SCE Gen |
| KANAKA_1_UNIT |
KANAKA |
Planned |
|
|
PGAE North |
| KEKAWK_6_UNIT |
STS HYDROPOWER LTD. (KEKAWAKA) |
Forced |
5.50 |
5.50 |
PGAE Gen |
| KELSO_2_UNITS |
Mariposa Energy |
Forced |
198.03 |
1.04 |
PGAE Gen |
| KERKH1_7_UNIT 1 |
KERKHOFF PH 1 UNIT #1 |
Forced |
13.00 |
13.00 |
PGAE North |
| KERKH1_7_UNIT 1 |
KERKHOFF PH 1 UNIT #1 |
Forced |
13.00 |
13.00 |
PGAE South |
| KERKH1_7_UNIT 3 |
KERKHOFF PH 1 UNIT #3 |
Forced |
12.80 |
12.80 |
PGAE North |
| KERKH1_7_UNIT 3 |
KERKHOFF PH 1 UNIT #3 |
Forced |
12.80 |
12.80 |
PGAE South |
| KERNFT_1_UNITS |
KERN FRONT LIMITED |
Forced |
52.40 |
1.40 |
PGAE South |
| KILARC_2_UNIT 1 |
KILARC HYDRO |
Planned |
1.50 |
1.50 |
PGAE North |
| KINGRV_7_UNIT 1 |
KINGS RIVER HYDRO UNIT 1 |
Planned |
51.20 |
51.20 |
PGAE South |
| KIRKER_7_KELCYN |
KELLER CANYON LANDFILL GEN FACILICITY |
Forced |
3.56 |
1.85 |
PGAE South |
| KNGBRG_1_KBSLR1 |
Kingsburg1 |
Forced |
1.50 |
0.00 |
PGAE South |
| KNTSTH_6_SOLAR |
Kent South |
Planned |
20.00 |
0.00 |
PGAE South |
| KRAMER_2_SEGS89 |
LUZ SOLAR PARTNERS 8-9 AGGREGATE |
Forced |
160.00 |
0.00 |
SCE Gen |
| KRNCNY_6_UNIT |
KERN CANYON |
Forced |
11.50 |
11.50 |
PGAE South |
| LAPAC_6_UNIT |
LOUISIANA PACIFIC SAMOA |
Forced |
20.00 |
20.00 |
PGAE Gen |
| LARKSP_6_UNIT 1 |
LARKSPUR PEAKER UNIT 1 |
Forced |
46.10 |
2.10 |
SDGE Gen |
| LARKSP_6_UNIT 2 |
LARKSPUR PEAKER UNIT 2 |
Forced |
47.98 |
4.98 |
SDGE Gen |
| LAROA2_2_UNITA1 |
LR2 |
Forced |
322.00 |
17.00 |
SDGE Gen |
| LEBECS_2_UNITS |
Pastoria Energy Facility |
Planned |
799.47 |
0.00 |
SCE Gen |
| LECEF_1_UNITS |
LOS ESTEROS ENERGY FACILITY AGGREGATE |
Forced |
309.84 |
7.84 |
PGAE South |
| LIVOAK_1_UNIT 1 |
LIVE OAK LIMITED |
Forced |
49.70 |
6.70 |
PGAE South |
| LMBEPK_2_UNITA1 |
Lambie Energy Center, Unit #1 |
Planned |
47.50 |
0.00 |
PGAE Gen |
| LMBEPK_2_UNITA2 |
Creed Energy Center, Unit #1 |
Planned |
47.60 |
0.00 |
PGAE Gen |
| LMBEPK_2_UNITA3 |
Goose Haven Energy Center, Unit #1 |
Planned |
47.40 |
47.40 |
PGAE Gen |
| LMEC_1_PL1X3 |
Los Medanos Energy Center AGGREGATE |
Planned/Forced |
580.00 |
305.00 |
PGAE Gen |
| LODIEC_2_PL1X2 |
Lodi Energy Center |
Forced |
302.58 |
18.78 |
PGAE Gen |
| MALAGA_1_PL1X2 |
Malaga Power Aggregate |
Planned |
96.00 |
96.00 |
PGAE Gen |
| MALCHQ_7_UNIT 1 |
MALACHA HYDRO L.P. |
Forced |
32.50 |
0.00 |
PGAE Gen |
| MALIN_5_GCPDDYN |
Grant County Hydro Facilities |
Forced |
125.00 |
0.00 |
PGAE Gen |
| MANZNA_2_WIND |
Manzana Wind |
Forced |
189.00 |
9.75 |
SCE Gen |
| MERCFL_6_UNIT |
Merced Falls Powerhouse |
Forced |
3.50 |
3.50 |
PGAE South |
| METEC_2_PL1X3 |
Metcalf Energy Center |
Planned |
593.16 |
0.00 |
PGAE Gen |
| MIRLOM_2_CORONA |
MWD Corona Hydroelectric Recovery Plant |
Forced |
2.85 |
2.85 |
SCE Gen |
| MIRLOM_2_MLBBTA |
Mira Loma BESS A |
Planned |
10.00 |
0.00 |
SCE Gen |
| MIRLOM_2_MLBBTB |
Mira Loma BESS B |
Planned |
10.00 |
0.00 |
SCE Gen |
| MIRLOM_2_ONTARO |
Ontario RT Solar |
Forced |
5.50 |
0.50 |
SCE Gen |
| MIRLOM_2_TEMESC |
MWD Temescal Hydroelectric Recovery Plan |
Forced |
2.85 |
2.85 |
SCE Gen |
| MKTRCK_1_UNIT 1 |
MCKITTRICK LIMITED |
Forced |
47.49 |
4.49 |
PGAE South |
| MNDALY_6_MCGRTH |
McGrath Beach Peaker |
Planned/Forced |
47.20 |
47.20 |
SCE Gen |
| MONLTH_6_BOREL |
BOREL HYDRO UNITS 1-3 AGGREGATE |
Planned |
11.00 |
11.00 |
SCE Gen |
| MONLTS_2_MONWD4 |
Monolith 4 |
Forced |
4.75 |
0.00 |
SCE Gen |
| MONLTS_2_MONWD5 |
Monolith 5 |
Forced |
4.04 |
0.00 |
SCE Gen |
| MONLTS_2_MONWD6 |
Monolith 6 |
Forced |
5.25 |
0.00 |
SCE Gen |
| MONLTS_2_MONWD7 |
Monolith 7 |
Forced |
4.76 |
0.00 |
SCE Gen |
| MOSSLD_2_PSP1 |
MOSS LANDING POWER BLOCK 1 |
Planned |
510.00 |
510.00 |
PGAE South |
| MOSSLD_2_PSP2 |
MOSS LANDING POWER BLOCK 2 |
Planned |
510.00 |
510.00 |
PGAE South |
| MRCHNT_2_PL1X3 |
Desert Star Energy Center |
Forced |
494.58 |
14.58 |
SDGE Gen |
| MTWIND_1_UNIT 1 |
Mountain View Power Project I |
Planned/Forced |
44.40 |
2.40 |
SCE Gen |
| MTWIND_1_UNIT 2 |
Mountain View Power Project II |
Planned/Forced |
22.20 |
1.20 |
SCE Gen |
| MTWIND_1_UNIT 3 |
Mountain View Power Project III |
Forced |
22.44 |
1.32 |
SCE Gen |
| NAROW2_2_UNIT |
Narrows Powerhouse Unit 2 |
Planned |
55.00 |
2.00 |
PGAE North |
| NCPA_7_GP1UN1 |
NCPA GEO PLANT 1 UNIT 1 |
Planned |
38.85 |
38.85 |
PGAE Gen |
| NCPA_7_GP2UN3 |
NCPA GEO PLANT 2 UNIT 3 |
Forced |
42.42 |
42.42 |
PGAE Gen |
| NGILAA_5_SDGDYN |
NGILAA_5_SDGDYN |
Planned |
57.00 |
57.00 |
EIM ARI |
| NGILAA_5_SDGDYN |
NGILAA_5_SDGDYN |
Planned |
57.00 |
57.00 |
SDGE Gen |
| NHOGAN_6_UNITS |
NEW HOGAN PH AGGREGATE |
Planned |
4.00 |
4.00 |
PGAE Gen |
| OAK C_7_UNIT 1 |
OAKLAND STATION C GT UNIT 1 |
Forced |
55.00 |
1.50 |
PGAE South |
| OAK C_7_UNIT 3 |
OAKLAND STATION C GT UNIT 3 |
Forced |
55.00 |
1.00 |
PGAE South |
| OASIS_6_SOLAR2 |
Oasis Solar |
Forced |
20.00 |
1.00 |
SCE Gen |
| OILFLD_7_QFUNTS |
Nacimiento Hydroelectric Plant |
Forced |
3.80 |
0.00 |
PGAE South |
| OLINDA_2_COYCRK |
MWD Coyote Creek Hydroelectric Recovery |
Forced |
3.13 |
3.13 |
SCE Gen |
| OLSEN_2_UNIT |
OLSEN POWER PARTNERS |
Planned |
5.80 |
5.80 |
PGAE Gen |
| OMAR_2_UNIT 1 |
KERN RIVER COGENERATION CO. UNIT 1 |
Forced |
78.00 |
2.30 |
SCE Gen |
| OMAR_2_UNIT 2 |
KERN RIVER COGENERATION CO. UNIT 2 |
Forced |
78.11 |
2.91 |
SCE Gen |
| OMAR_2_UNIT 3 |
KERN RIVER COGENERATION CO. UNIT 3 |
Forced |
81.41 |
3.01 |
SCE Gen |
| OSO_6_NSPIN |
OSO_6_NSPIN |
Planned |
70.80 |
0.00 |
SCE Gen |
| OTMESA_2_PL1X3 |
OTAY MESA ENERGY CENTER |
Planned/Forced |
603.68 |
6.68 |
SDGE Gen |
| OXMTN_6_LNDFIL |
Ox Mountain Landfill Generating Plant |
Forced |
10.62 |
1.58 |
PGAE South |
| PACLUM_6_UNIT |
Humboldt Redwood |
Forced |
28.80 |
6.80 |
PGAE North |
| PADUA_2_ONTARO |
ONTARIO/SIERRA HYDRO PSP |
Planned |
1.92 |
1.92 |
SCE Gen |
| PANSEA_1_PANARO |
Mesa Wind Project |
Planned |
30.00 |
21.81 |
SCE Gen |
| PEORIA_1_SOLAR |
Sonora 1 |
Planned |
1.50 |
0.00 |
PGAE Gen |
| PHOENX_1_UNIT |
PHOENIX PH |
Forced |
2.00 |
2.00 |
PGAE Gen |
| PINFLT_7_UNITS |
PINE FLAT HYDRO AGGREGATE |
Planned |
210.00 |
30.00 |
PGAE Gen |
| PIOPIC_2_CTG1 |
Pio Pico Unit 1 |
Forced |
111.30 |
3.55 |
SDGE Gen |
| PIOPIC_2_CTG2 |
Pio Pico Unit 2 |
Forced |
112.70 |
1.34 |
SDGE Gen |
| PIOPIC_2_CTG3 |
Pio Pico Unit 3 |
Forced |
112.00 |
1.76 |
SDGE Gen |
| PIT1_7_UNIT 1 |
PIT PH 1 UNIT 1 |
Planned |
32.00 |
32.00 |
PGAE North |
| PLAINV_6_NLRSR1 |
North Lancaster Ranch |
Forced |
20.00 |
0.00 |
SCE Gen |
| PLAINV_6_SOLARC |
Central Antelope Dry Ranch C |
Forced |
20.00 |
0.00 |
SCE Gen |
| PNCHEG_2_PL1X4 |
PANOCHE ENERGY CENTER (Aggregated) |
Forced |
401.00 |
0.00 |
PGAE Gen |
| PNCHPP_1_PL1X2 |
Midway Peaking Aggregate |
Forced |
119.91 |
0.15 |
PGAE Gen |
| PNCHVS_2_SOLAR |
Panoche Valley Solar |
Planned |
140.00 |
0.00 |
PGAE Gen |
| PNOCHE_1_PL1X2 |
Panoche Peaker |
Forced |
49.97 |
4.97 |
PGAE South |
| PNOCHE_1_UNITA1 |
CalPeak Power Panoche Unit 1 |
Forced |
52.01 |
4.01 |
PGAE Gen |
| POTTER_6_UNITS |
Potter Valley |
Planned |
10.10 |
5.60 |
PGAE North |
| PRCTVY_1_MIGBT1 |
Miguel BESS |
Planned |
2.00 |
2.00 |
SDGE Gen |
| PWEST_1_UNIT |
PACIFIC WEST 1 WIND GENERATION |
Forced |
2.10 |
2.10 |
SCE Gen |
| RAMON_2_SCEDYN |
RAMON_2_SCEDYN |
Forced |
359.60 |
248.60 |
SCE Gen |
| RAWHIDE_6_UNIT |
Chevron Wind |
Forced |
16.50 |
4.50 |
EIM PAC |
| RECTOR_2_CREST |
Rector Aggregate Solar Resources |
Forced |
14.00 |
0.00 |
SCE Gen |
| RECTOR_2_KAWH 1 |
KAWEAH PH 1 UNIT 1 |
Planned |
2.25 |
2.25 |
SCE Gen |
| REDOND_7_UNIT 7 |
REDONDO GEN STA. UNIT 7 |
Forced |
505.96 |
505.96 |
SCE Gen |
| REDOND_7_UNIT 8 |
REDONDO GEN STA. UNIT 8 |
Forced |
495.90 |
20.90 |
SCE Gen |
| REEDLY_6_SOLAR |
Terzian |
Forced |
1.23 |
0.00 |
PGAE Gen |
| RENWD_1_QF |
Renwind re-powering project |
Forced |
10.00 |
0.00 |
SCE Gen |
| RICHMN_7_BAYENV |
BAY ENVIRONMENTAL (NOVE POWER) |
Forced |
2.50 |
2.50 |
PGAE Gen |
| ROLLIN_6_UNIT |
ROLLINS HYDRO |
Planned |
13.50 |
0.00 |
PGAE North |
| ROSMDW_2_WIND1 |
Pacific Wind - Phase 1 |
Planned/Forced |
140.00 |
2.00 |
SCE Gen |
| RSMSLR_6_SOLAR2 |
Rosamond Two |
Forced |
20.00 |
0.00 |
SCE Gen |
| RTREE_2_WIND2 |
Rising Tree 2 |
Forced |
19.80 |
0.00 |
SCE Gen |
| RUSCTY_2_UNITS |
Russell City Energy Center |
Forced |
620.50 |
12.80 |
PGAE South |
| RVRVEW_1_UNITA1 |
Riverview Energy Center (GP Antioch) |
Planned |
47.60 |
47.60 |
PGAE Gen |
| RVSIDE_2_RERCU3 |
Riverside Energy Res. Ctr Unit 3 |
Planned |
49.00 |
49.00 |
SCE Gen |
| RVSIDE_2_RERCU4 |
Riverside Energy Res. Ctr Unit 4 |
Planned |
49.00 |
49.00 |
SCE Gen |
| SANTFG_7_UNITS |
GEYSERS CALISTOGA AGGREGATE |
Forced |
92.10 |
33.10 |
PGAE Gen |
| SANTGO_2_MABBT1 |
Millikan Avenue BESS |
Forced |
2.00 |
0.00 |
SCE Gen |
| SANWD_1_QF |
San Gorgonio Farms Wind Farm |
Planned |
31.00 |
20.43 |
SCE Gen |
| SAUGUS_2_TOLAND |
Toland Landfill gas to Energy Project |
Forced |
1.57 |
0.00 |
SCE Gen |
| SBERDO_2_PSP3 |
Mountainview Gen Sta. Unit 3 |
Planned |
536.00 |
536.00 |
SCE Gen |
| SBERDO_2_SNTANA |
SANTA ANA PSP |
Planned |
6.95 |
6.95 |
SCE Gen |
| SBERDO_6_MILLCK |
MILL CREEK PSP |
Planned |
3.93 |
2.93 |
SCE Gen |
| SCEHOV_2_HOOVER |
SCEHOV_2_HOOVER |
Planned/Forced |
287.01 |
136.01 |
SCE Gen |
| SCHLTE_1_PL1X3 |
Tracy Combined Cycle Power Plant |
Forced |
336.04 |
15.90 |
PGAE Gen |
| SIERRA_1_UNITS |
HIGH SIERRA LIMITED |
Forced |
52.43 |
1.43 |
PGAE Gen |
| SLUISP_2_UNITS |
SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) |
Planned/Forced |
374.43 |
54.43 |
PGAE Gen |
| SLYCRK_1_UNIT 1 |
SLY CREEK HYDRO |
Planned |
13.00 |
13.00 |
PGAE North |
| SMUDGO_7_UNIT 1 |
SONOMA POWER PLANT |
Forced |
53.00 |
2.00 |
PGAE Gen |
| SPAULD_6_UNIT12 |
SPAULDING HYDRO PH 1 & 2 AGGREGATE |
Forced |
11.40 |
7.00 |
PGAE North |
| SPRGVL_2_TULE |
TULE RIVER HYDRO PLANT (PG&E) |
Planned/Forced |
6.40 |
6.40 |
SCE Gen |
| SPRGVL_2_TULESC |
TULE RIVER HYDRO PLANT (SCE) |
Forced |
2.50 |
2.50 |
SCE Gen |
| STROUD_6_WWHSR1 |
Winter Wheat Solar Farm |
Forced |
1.50 |
1.50 |
PG&E South |
| SUNRIS_2_PL1X3 |
Sunrise Power Project AGGREGATE II |
Forced |
586.02 |
326.02 |
PGAE Gen |
| SUNSET_2_UNITS |
MIDWAY SUNSET COGENERATION PLANT |
Planned/Forced |
248.00 |
14.00 |
PGAE South |
| SYCAMR_2_UNIT 1 |
Sycamore Cogeneration Unit 1 |
Forced |
85.00 |
3.63 |
SCE Gen |
| SYCAMR_2_UNIT 2 |
Sycamore Cogeneration Unit 2 |
Forced |
85.00 |
5.26 |
SCE Gen |
| SYCAMR_2_UNIT 3 |
Sycamore Cogeneration Unit 3 |
Forced |
85.00 |
5.62 |
SCE Gen |
| SYCAMR_2_UNIT 4 |
Sycamore Cogeneration Unit 4 |
Forced |
85.00 |
5.98 |
SCE Gen |
| TANHIL_6_SOLART |
Berry Cogen 18 |
Forced |
17.00 |
0.00 |
PGAE South |
| TERMEX_2_PL1X3 |
TDM |
Forced |
625.00 |
0.00 |
SDGE Gen |
| TIDWTR_2_UNITS |
MARTINEZ COGEN LIMITED PARTNERSHIP |
Planned |
114.80 |
114.80 |
PGAE Gen |
| TIFFNY_1_DILLON |
TIFFNY_1_DILLON |
Forced |
45.00 |
1.00 |
SCE Gen |
| TKOPWR_6_HYDRO |
Bear Creek Hydroelectric Project |
Planned |
2.83 |
2.83 |
PGAE Gen |
| TORTLA_1_SOLAR |
Longboat Solar |
Forced |
20.00 |
0.00 |
SCE Gen |
| TRNQLT_2_SOLAR |
Tranquillity |
Forced |
200.00 |
0.00 |
PGAE Gen |
| TRNSWD_1_QF |
FPL Energy C Wind |
Forced |
38.97 |
32.97 |
SCE Gen |
| TUPMAN_1_BIOGAS |
ABEC Bidart-Stockale #1 |
Forced |
0.60 |
0.31 |
PGAE Gen |
| TWISSL_6_SOLAR |
Nickel 1 ("NLH1") |
Forced |
1.50 |
0.00 |
PGAE Gen |
| UNCHEM_1_UNIT |
CONTRA COSTA CARBON PLANT |
Forced |
19.00 |
14.00 |
PGAE Gen |
| USWND2_1_WIND1 |
Golden Hills A |
Planned |
42.96 |
0.00 |
PGAE Gen |
| USWND2_1_WIND2 |
Golden Hills B |
Forced |
42.96 |
0.00 |
PGAE Gen |
| USWND2_1_WIND3 |
Golden Hills C |
Forced |
46.00 |
0.00 |
PGAE Gen |
| USWNDR_2_SMUD |
SOLANO WIND FARM |
Forced |
102.18 |
6.33 |
PGAE Gen |
| USWNDR_2_SMUD2 |
Solano Wind Project Phase 3 |
Forced |
127.80 |
3.00 |
PGAE Gen |
| USWPJR_2_UNITS |
Vasco Wind |
Forced |
78.20 |
0.00 |
PGAE Gen |
| VACADX_1_NAS |
VACA-DIXON BATTERY |
Forced |
1.85 |
0.85 |
PGAE North |
| VACADX_1_UNITA1 |
CalPeak Power Vaca Dixon Unit 1 |
Forced |
50.61 |
2.61 |
PGAE Gen |
| VALLEY_5_PERRIS |
MWD Perris Hydroelectric Recovery Plant |
Forced |
7.94 |
7.94 |
SCE Gen |
| VEGA_6_SOLAR1 |
Vega Solar |
Forced |
20.00 |
0.00 |
PGAE Gen |
| VICTOR_1_SLRHES |
Sunedison - Hesperia |
Forced |
1.50 |
0.00 |
SCE Gen |
| VICTOR_1_SOLAR2 |
Alamo Solar |
Forced |
20.00 |
0.00 |
SCE Gen |
| VILLPK_2_VALLYV |
MWD Valley View Hydroelectric Recovery P |
Forced |
4.10 |
4.10 |
SCE Gen |
| VINCNT_2_WESTWD |
Oasis Power Plant |
Planned |
59.00 |
2.00 |
SCE Gen |
| VOLTA_6_DIGHYD |
Digger Creek Ranch Hydro |
Forced |
0.60 |
0.60 |
PGAE Gen |
| VSTAES_6_VESBT1 |
Vista Energy Storage |
Forced |
40.00 |
0.00 |
SDGE Gen |
| WADHAM_6_UNIT |
Wadham Energy LP |
Planned |
29.07 |
29.07 |
PGAE North |
| WALCRK_2_CTG1 |
Walnut Creek Energy Park Unit 1 |
Planned/Forced |
96.43 |
0.00 |
SCE Gen |
| WALCRK_2_CTG2 |
Walnut Creek Energy Park Unit 2 |
Forced |
96.91 |
0.00 |
SCE Gen |
| WALCRK_2_CTG3 |
Walnut Creek Energy Park Unit 3 |
Forced |
96.65 |
0.00 |
SCE Gen |
| WALCRK_2_CTG4 |
Walnut Creek Energy Park Unit 4 |
Forced |
96.49 |
0.00 |
SCE Gen |
| WALCRK_2_CTG5 |
Walnut Creek Energy Park Unit 5 |
Forced |
96.65 |
0.00 |
SCE Gen |
| WALNUT_6_HILLGEN |
Puente Hills |
Forced |
47.00 |
47.00 |
SCE Gen |
| WDLEAF_7_UNIT 1 |
WOODLEAF HYDRO |
Planned/Forced |
60.00 |
60.00 |
PGAE North |
| WFRESN_1_SOLAR |
Joya Del Sol |
Forced |
1.50 |
0.00 |
PGAE Gen |
| WHTWTR_1_WINDA1 |
Whitewater Hill Wind Project |
Forced |
61.50 |
11.50 |
SCE Gen |
| WNDMAS_2_UNIT 1 |
BUENA VISTA ENERGY, LLC |
Forced |
38.00 |
2.00 |
PGAE Gen |
| WNDSTR_2_WIND |
Windstar |
Planned |
120.00 |
4.00 |
SCE Gen |
| WRGHTP_7_AMENGY |
SMALL QF AGGREGATION - LOS BANOS |
Forced |
2.50 |
1.50 |
PGAE Gen |
| ZOND_6_UNIT |
ZOND WINDSYSTEMS INC. |
Forced |
17.10 |
17.10 |
PGAE Gen |
| BRDGVL_7_BAKER |
Baker Station Hydro |
Forced |
1.49 |
1.49 |
|
| GRADYW_5_GDYWD1 |
Grady Wind |
Planned |
200.00 |
155.00 |
|
| RATSKE_2_NROSR1 |
North Rosamond Solar |
Forced |
150.00 |
0.00 |
|