Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 9.00 PGAE Gen
AGRICO_7_UNIT Fresno Cogen Forced 50.60 0.00 PGAE South
ALAMIT_7_UNIT 2 ALAMITOS GEN STA. UNIT 2 Planned 175.00 175.00 SCE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 25.00 2.80 PGAE South
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Forced 25.00 2.90 PGAE South
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 3.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 3.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 1.50 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 6.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 6.90 SCE Gen
ALTWD_1_QF Altwind Forced 28.84 18.34 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 42.81 SCE Gen
ASTORA_2_SOLAR2 Astoria 2 Forced 75.00 4.11 SCE Gen
AVENAL_6_AVPARK Avenal Park Solar Project Forced 6.00 2.00 PGAE South
AVENAL_6_AVSLR1 Avenal Solar 1 Forced 7.90 2.90 PGAE South
AVENAL_6_AVSLR2 Avenal Solar 2 Forced 7.90 2.90 PGAE South
AVENAL_6_SANDDG Sand Drag Solar Project Forced 19.00 8.00 PGAE Gen
AVENAL_6_SUNCTY Sun City Solar Project Forced 20.00 9.00 PGAE Gen
AVSOLR_2_SOLAR AV SOLAR RANCH 1 Forced 241.50 0.00 SCE Gen
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Forced 33.00 2.00 PGAE South
BALCHS_7_UNIT 2 BALCH 2 PH UNIT 2 Forced 52.50 0.00 PGAE South
BALCHS_7_UNIT 3 BALCH 2 PH UNIT 3 Forced 54.60 0.00 PGAE South
BARRE_6_PEAKER Barre Peaker Planned 47.00 0.00 SCE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 428.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 6.08 PGAE South
BEARDS_7_UNIT 1 Beardsley Hydro Planned 11.50 0.00 PGAE Gen
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 5.21 PGAE Gen
BGSKYN_2_AS2SR1 Antelope Solar 2 Forced 105.00 24.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Forced 820.00 90.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned 13.40 2.40 SCE Gen
BLAST_1_WIND Mountain View IV Wind Planned/Forced 49.00 2.00 SCE Gen
BLULKE_6_BLUELK Blue Lake Power Planned/Forced 12.00 12.00 PGAE Gen
BOGUE_1_UNITA1 Feather River Energy Center, Unit #1 Forced 47.60 0.00 PGAE North
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDGVL_7_BAKER Baker Station Hydro Forced 1.49 1.49 PGAE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 9.00 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 2.30 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 1.50 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 6.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 0.00 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 3.60 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 3.00 SCE Gen
BUCKCK_2_HYDRO Lassen Station Hydro Forced 0.99 0.99 PGAE Gen
BUCKCK_7_OAKFLT Oak Flat Forced 1.30 1.30 PGAE Gen
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Forced 57.25 0.00 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 3.00 SCE Gen
BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO Forced 39.50 0.00 PGAE North
CALFTS_2_CFSSR1 California Flats Solar South Forced 150.00 10.00 PGAE Gen
CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE Planned 49.00 0.00 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned 24.00 24.00 PGAE North
CARLS1_2_CARCT1 Carlsbad 1 Planned 422.00 316.50 SDGE Gen
CAVLSR_2_BSOLAR California Valley Solar Ranch-Phase B Forced 40.00 40.00 PGAE Gen
CAVLSR_2_RSOLAR California Valley Solar Ranch-Phase A Forced 210.00 169.00 PGAE Gen
CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility Forced 5.25 1.45 SDGE Gen
CENTER_2_RHONDO MWD Rio Hondo Hydroelectric Recovery Pla Forced 1.91 1.91 SCE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 0.00 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 8.67 PGAE Gen
CHINO_6_SMPPAP AltaGas Pomona Energy Forced 44.00 44.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 1.90 SCE Gen
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00 PGAE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 6.25 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 5.53 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 12.57 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 6.53 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned/Forced 176.72 11.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Planned/Forced 175.67 10.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Forced 43.00 2.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 26.87 PGAE North
CONTRL_1_CASAD1 Mammoth G1 Forced 10.00 0.00 SCE Gen
CONTRL_1_CASAD3 Mammoth G3 Planned/Forced 14.00 14.00 SCE Gen
CONTRL_1_OXBOW Dixie Valley Geo Forced 60.00 3.00 SCE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Forced 70.40 0.00 PGAE North
CRNEVL_6_CRNVA Crane Valley Forced 0.90 0.90 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20 PGAE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 6.00 SDGE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 0.53 PGAE South
CUYAMS_6_CUYSR1 Cuyama Solar Forced 40.00 2.00 PGAE Gen
DEERCR_6_UNIT 1 DEER CREEK Forced 7.00 7.00 PGAE North
DELAMO_2_SOLRC1 Golden Springs Building C1 Forced 1.16 0.00 SCE Gen
DELAMO_2_SOLRD Golden Solar Building D Forced 1.25 0.00 SCE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned 880.00 0.00 PGAE Gen
DINUBA_6_UNIT Dinuba Energy, Inc. Forced 12.00 12.00 PGAE South
DONNLS_7_UNIT Donnells Hydro Planned/Forced 72.00 7.00 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 2.23 PGAE South
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Forced 125.00 0.00 SCE Gen
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 23.40 SCE Gen
DSABLA_7_UNIT De Sabla Hydro Forced 18.50 0.00 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Forced 296.19 15.19 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 5.80 PGAE South
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Forced 236.80 79.80 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 3.00 EIM ARI
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 3.00 SCE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 0.00 SDGE Gen
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Forced 93.00 33.00 PGAE North
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 0.00 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 551.70 PGAE Gen
ENERSJ_2_WIND ESJ Wind Energy Planned 155.10 0.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ESQUON_6_LNDFIL Neal Road Landfill Generating Facility Forced 2.10 2.10 PGAE Gen
ETIWND_2_CHMPNE Champagne Forced 1.00 0.50 SCE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 1.36 SCE Gen
ETIWND_2_RTS010 SPVP010 Fontana RT Solar Forced 1.50 1.50 SCE Gen
ETIWND_2_UNIT1 ETIWND_2_UNIT1 Planned 33.60 29.60 SCE Gen
ETIWND_6_GRPLND Grapeland Peaker Forced 47.39 0.00 SCE Gen
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Forced 94.50 0.00 PGAE South
EXCLSG_1_SOLAR Excelsior Solar Forced 60.00 5.00 PGAE Gen
FAIRHV_6_UNIT FAIRHAVEN POWER CO. Forced 18.75 18.75 PGAE North
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 2.32 PGAE Gen
FLOWD_2_RT2WD2 Ridgetop 2 Forced 27.39 0.00 SCE Gen
FLOWD_2_WIND1 Cameron Ridge 2 Forced 11.90 0.00 SCE Gen
FORBST_7_UNIT 1 FORBESTOWN HYDRO Forced 37.50 0.00 PGAE North
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 0.00 PGAE Gen
FROGTN_1_UTICAM Murphys Powerhouse Forced 3.60 0.00 PGAE Gen
GARNET_1_SOLAR2 Garnet Solar Power Generation Station 1 Forced 4.00 0.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 9.18 SCE Gen
GARNET_1_WIND GARNET WIND ENERGY CENTER Forced 6.50 0.50 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 3.00 SCE Gen
GARNET_2_DIFWD1 Difwind Forced 7.88 0.00 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 1.95 SCE Gen
GARNET_2_WIND3 San Gorgonio East Forced 12.60 12.60 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 585.00 42.06 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 0.00 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 12.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 45.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 12.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 40.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 0.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 36.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 26.00 PGAE Gen
GIFFEN_6_SOLAR Giffen Solar Station Forced 10.00 4.00 PGAE South
GIFFEN_6_SOLAR1 Aspiration Solar G Forced 9.00 3.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 0.00 PGAE South
GILRPP_1_PL1X2 GILROY ENERGY CENTER UNITS 1&2 AGGREGATE Planned 95.20 0.00 PGAE South
GLNARM_2_UNIT 5 Glenarm Turbine 5 Forced 65.81 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLNARM_7_UNIT 3 GLEN ARM UNIT 3 Forced 44.83 0.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRADYW_5_GDYWD1 Grady Wind Planned 200.00 82.00 EIM ARI
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Forced 20.00 20.00 PGAE North
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Forced 98.46 5.37 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 0.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Planned/Forced 82.00 40.00 PGAE Gen
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned/Forced 144.00 20.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned/Forced 144.00 20.00 PGAE South
HATLOS_6_BWDHY1 Bidwell Ditch Forced 2.00 2.00 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.00 PGAE Gen
HENRTA_6_SOLAR1 Lemoore 1 Forced 1.50 0.85 PGAE Gen
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 3.75 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 3.29 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 68.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned/Forced 4.90 4.90 PGAE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 16.27 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 169.30 PGAE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 0.53 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 0.00 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned/Forced 405.00 84.00 PGAE Gen
INTTRB_6_UNIT International Turbine Research Planned 18.40 0.00 PGAE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 4.80 SCE Gen
JAWBNE_2_SRWND Sky River Planned 77.00 0.00 SCE Gen
KEKAWK_6_UNIT STS HYDROPOWER LTD. (KEKAWAKA) Forced 5.50 5.50 PGAE Gen
KELSO_2_UNITS Mariposa Energy Forced 198.03 0.00 PGAE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Forced 11.00 0.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Forced 153.90 12.90 PGAE North
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Forced 153.90 12.90 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 2.40 PGAE South
KERNRG_1_UNITS South Belridge Cogen Facility Forced 55.20 0.00 PGAE South
KILARC_2_UNIT 1 KILARC HYDRO Forced 1.50 1.50 PGAE North
KINGRV_7_UNIT 1 KINGS RIVER HYDRO UNIT 1 Planned 51.20 51.20 PGAE South
KIRKER_7_KELCYN KELLER CANYON LANDFILL GEN FACILICITY Forced 3.56 1.85 PGAE South
KNGBRD_2_SOLAR2 Kingbird Solar B Forced 20.00 3.20 SCE Gen
KNGBRG_1_KBSLR1 Kingsburg1 Forced 1.50 0.00 PGAE South
KRAMER_1_SEGSR3 Kramer Junction 3 Forced 30.00 30.00 SCE Gen
KRAMER_1_SEGSR4 Kramer Junction 4 Forced 30.00 0.00 SCE Gen
KRAMER_2_SEGS89 LUZ SOLAR PARTNERS 8-9 AGGREGATE Forced 160.00 0.00 SCE Gen
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 259.80 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 8.20 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 10.15 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 145.00 145.00 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 2.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 15.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Planned 799.47 0.00 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 7.84 PGAE South
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 7.70 PGAE South
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Planned/Forced 580.00 0.00 PGAE Gen
LODI25_2_UNIT 1 LODI GAS TURBINE Forced 25.00 2.99 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 24.58 PGAE Gen
MALAGA_1_PL1X2 Malaga Power Aggregate Planned 96.00 0.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 0.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 3.75 SCE Gen
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 0.00 PGAE Gen
MIRLOM_2_CORONA MWD Corona Hydroelectric Recovery Plant Forced 2.85 2.85 SCE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MIRLOM_2_ONTARO Ontario RT Solar Forced 5.50 0.50 SCE Gen
MIRLOM_2_TEMESC MWD Temescal Hydroelectric Recovery Plan Forced 2.85 2.85 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.49 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Planned/Forced 47.20 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Planned 7.99 7.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Planned 11.00 11.00 SCE Gen
MONLTS_2_MONWD4 Monolith 4 Forced 4.75 0.00 SCE Gen
MONLTS_2_MONWD5 Monolith 5 Forced 4.04 0.00 SCE Gen
MONLTS_2_MONWD6 Monolith 6 Forced 5.25 0.00 SCE Gen
MONLTS_2_MONWD7 Monolith 7 Forced 4.76 0.00 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 34.58 SDGE Gen
MSOLAR_2_SOLAR3 Mesquite Solar 3, LLC Forced 152.00 0.00 SDGE Gen
MSTANG_2_SOLAR Mustang Forced 30.00 0.00 PGAE Gen
MSTANG_2_SOLAR3 Mustang 3 Forced 40.00 0.00 PGAE Gen
MSTANG_2_SOLAR4 Mustang 4 Forced 30.00 0.00 PGAE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 3.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 3.60 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 1.20 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 1.32 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Planned 55.00 3.00 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NCPA_7_GP2UN4 NCPA GEO PLANT 2 UNIT 4 Forced 52.73 18.73 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 4.00 EIM ARI
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 4.00 SDGE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OASIS_6_SOLAR2 Oasis Solar Forced 20.00 2.50 SCE Gen
OCTILO_5_WIND Ocotillo Wind Energy Facility Forced 265.00 0.00 SDGE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 0.00 PGAE South
OLINDA_2_COYCRK MWD Coyote Creek Hydroelectric Recovery Forced 3.13 3.13 SCE Gen
OLINDA_2_LNDFL2 Brea Power II Forced 28.10 12.30 SCE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 5.40 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 6.01 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 6.21 SCE Gen
ORMOND_7_UNIT 1 ORMOND BEACH GEN STA. UNIT 1 Planned 741.27 0.00 SCE Gen
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Planned 750.00 0.00 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 17.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 0.00 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned/Forced 1.92 0.92 SCE Gen
PALOMR_2_PL1X3 Palomar Energy Center Planned 575.00 0.00 SDGE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.81 SCE Gen
PEORIA_1_SOLAR Sonora 1 Forced 1.50 0.00 PGAE Gen
PGF1_2_RDRR05 RDRR-D PGF1 SEES Planned 0.90 0.00 PGAE Gen
PGF1_2_RDRR07 RDRR-D PGF1 Planned 0.99 0.00 PGAE Gen
PGFG_1_RDRR03 RDRR-D PGFG SOMA Planned 0.50 0.00 PGAE Gen
PGST_2_RDRR02 RDRR-D PGST Planned 1.60 0.00 PGAE Gen
PHOENX_1_UNIT PHOENIX PH Forced 2.00 2.00 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 10.00 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 111.30 4.15 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.70 2.99 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 3.96 SDGE Gen
PIT3_7_PL1X3 PIT PH 3 UNITS 1, 2 & 3 AGGREGATE Forced 70.60 0.00 PGAE North
PLACVL_1_CHILIB Chili Bar Hydro Forced 8.40 8.40 PGAE Gen
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 5.71 PGAE Gen
PNOCHE_1_PL1X2 Panoche Peaker Forced 49.97 4.97 PGAE South
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Forced 69.00 0.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Forced 68.50 0.00 PGAE North
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 242.60 SCE Gen
RAWHIDE_6_UNIT Chevron Wind Forced 16.50 3.00 EIM PAC
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Forced 57.00 0.00 PGAE North
RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 Forced 56.90 0.00 PGAE North
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 2.00 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Planned 2.25 2.25 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Forced 505.96 85.96 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Forced 495.90 20.90 SCE Gen
REEDLY_6_SOLAR Terzian Forced 1.23 0.00 PGAE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 1.00 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 2.10 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 2.00 SCE Gen
RTREE_2_WIND2 Rising Tree 2 Forced 19.80 0.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 620.50 19.50 PGAE South
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Planned 48.35 48.35 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Planned 48.50 0.00 SCE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 34.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 1.61 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 555.00 2.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 555.00 2.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.93 SCE Gen
SCEC_1_PDRP27 PDR-D SCEC LNE1 Planned 2.00 0.00 SCE Gen
SCEC_1_RDRR35 SDP-C-1-LSCE Forced 61.00 61.00 SCE Gen
SCEC_1_RDRR36 SDP-C-2-LSCE Forced 38.00 38.00 SCE Gen
SCEC_1_RDRR37 SDP-C-3-LSCE Forced 69.00 69.00 SCE Gen
SCEC_1_RDRR38 SDP-C-4-LSCE Forced 81.00 81.00 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 79.01 SCE Gen
SCEN_6_RDRR12 SDP-N-LSCE Forced 71.00 71.00 SCE Gen
SCEW_2_RDRR25 SDP-W-2-LSCE Forced 40.00 40.00 SCE Gen
SCEW_2_RDRR26 SDP-W-1-LSCE Forced 39.00 39.00 SCE Gen
SCHD_1_RDRR11 SDP-HD-LSCE Forced 35.00 35.00 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 336.04 20.03 PGAE Gen
SCNW_6_RDRR10 SDP-NW-LSCE Forced 20.00 20.00 SCE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 2.43 PGAE Gen
SLST13_2_SOLAR1 Quinto Solar PV Project Forced 107.60 26.60 PGAE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 74.43 PGAE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 0.00 PGAE North
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 0.00 PGAE Gen
SNDBAR_7_UNIT 1 SANDBAR Planned 16.20 16.20 PGAE North
SOUTH_2_UNIT SOUTH HYDRO Planned 7.10 7.10 PGAE Gen
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Forced 11.40 7.00 PGAE North
SPOINT_2_MEADDYN SPOINT_2_MEADDYN Forced 325.00 325.00 SCE Gen
SPOINT_2_PARKERDYN Southpoint Energy Center Forced 200.00 200.00 SCE Gen
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Planned 7.00 7.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STIGCT_2_LODI LODI STIG UNIT Forced 49.90 5.90 PGAE Gen
SUMWHT_6_SWSSR1 Summer Wheat Solar Farm Forced 18.50 0.90 PGAE Gen
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 586.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 30.00 PGAE South
SUTTER_2_TESLADYN Sutter Energy Center Dynamic 2 Forced 270.00 270.00 PGAE Gen
SUTTER_2_WASNDYN Sutter Energy Center Dynamic Forced 270.00 270.00 PGAE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 80.00 2.19 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 80.00 2.57 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 80.00 2.92 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 80.00 3.27 SCE Gen
TANHIL_6_SOLART Berry Cogen 18 Forced 17.00 0.00 PGAE South
TERMEX_2_PL1X3 TDM Forced 625.00 4.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 0.00 SCE Gen
TOPAZ_2_SOLAR Topaz Solar Farms Planned 550.00 0.00 PGAE South
TWISSL_6_SOLAR Nickel 1 ("NLH1") Forced 1.50 0.00 PGAE Gen
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 7.00 PGAE Gen
USWND2_1_WIND1 Golden Hills A Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 0.00 PGAE Gen
USWNDR_2_LABWD1 LaBrisa Wind Project Forced 9.00 0.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 1.50 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 1.85 PGAE North
VACADX_1_SOLAR Vaca-Dixon Solar Station Forced 2.50 0.50 PGAE North
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61 PGAE Gen
VALLEY_5_PERRIS MWD Perris Hydroelectric Recovery Plant Forced 7.94 7.94 SCE Gen
VEGA_6_SOLAR1 Vega Solar Forced 20.00 0.00 PGAE Gen
VICTOR_1_SLRHES Sunedison - Hesperia Forced 1.50 0.00 SCE Gen
VICTOR_1_SOLAR2 Alamo Solar Forced 20.00 0.00 SCE Gen
VICTOR_1_VDRYFA Victor Dry Farm Ranch A Forced 5.00 0.00 SCE Gen
VICTOR_1_VDRYFB Victor Dry Farm Ranch B Forced 5.00 0.00 SCE Gen
VILLPK_2_VALLYV MWD Valley View Hydroelectric Recovery P Forced 4.10 4.10 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 59.00 3.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SCE Gen
WARNE_2_UNIT WARNE HYDRO AGGREGATE Forced 76.00 76.00 SCE Gen
WDLEAF_7_UNIT 1 WOODLEAF HYDRO Forced 60.00 0.00 PGAE North
WFRESN_1_SOLAR Joya Del Sol Forced 1.50 0.00 PGAE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 21.50 SCE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 0.00 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 2.00 PGAE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 1.50 PGAE Gen
YUBACT_6_UNITA1 Yuba City Energy Center (Calpine) Forced 47.60 0.00 PGAE North
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
EIM ARI 1 2 89.00 0.00
EIM PAC 0 1 3.00 0.00
PGAE Gen 25 114 996.59 2696.32
PGAE North 12 33 148.73 130.10
PGAE South 5 50 235.71 100.50
SCE Gen 33 134 965.24 1564.56
SDGE Gen 3 19 420.68 0.00
Total 79 353 2858.95 4491.48


Report Generated on:
06/23/2019 08:30:00 (PPT)
Filtered Parameters:
Date = 06/24/2019
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.