| Resource ID | Resource Name | Outage Type | Capacity (MW) | Curtailed (MW) | Zone Name | 
      
      
        | ADLIN_1_UNITS | GEYSERS AIDLIN AGGREGATE | Forced | 22.00 | 9.00 | PGAE Gen | 
      
        | ADOBEE_1_SOLAR | Adobe Solar | Forced | 20.00 | 0.00 | PGAE Gen | 
      
        | ALAMIT_7_UNIT 5 | ALAMITOS GEN STA. UNIT 5 | Forced | 497.97 | 497.97 | SCE Gen | 
      
        | ALMEGT_1_UNIT 1 | ALAMEDA GT UNIT 1 | Forced | 25.00 | 3.00 | PGAE South | 
      
        | ALMEGT_1_UNIT 2 | ALAMEDA GT UNIT 2 | Forced | 25.00 | 3.00 | PGAE South | 
      
        | ALTA3A_2_CPCE4 | Alta Wind 4 | Forced | 102.00 | 3.00 | SCE Gen | 
      
        | ALTA3A_2_CPCE5 | Alta Wind 5 | Forced | 168.00 | 3.00 | SCE Gen | 
      
        | ALTA4A_2_CPCW1 | Alta Wind 1 | Forced | 150.00 | 1.50 | SCE Gen | 
      
        | ALTA4B_2_CPCW2 | Alta Wind 2 | Forced | 150.00 | 6.00 | SCE Gen | 
      
        | ALTA4B_2_CPCW3 | Alta Wind 3 | Forced | 150.00 | 12.00 | SCE Gen | 
      
        | ALTA4B_2_CPCW6 | Mustang Hills | Planned | 150.00 | 6.00 | SCE Gen | 
      
        | ALTA6B_2_WIND11 | Alta Wind 11 | Forced | 90.00 | 4.55 | SCE Gen | 
      
        | ALTA6E_2_WIND10 | Alta Wind 10 | Forced | 138.00 | 9.75 | SCE Gen | 
      
        | ALTWD_1_QF | Altwind | Forced | 28.84 | 18.34 | SCE Gen | 
      
        | ANAHM_7_CT | ANAHEIM COMBUSTION TURBINE | Forced | 42.81 | 42.81 | SCE Gen | 
      
        | AVENAL_6_AVPARK | Avenal Park Solar Project | Forced | 6.00 | 2.00 | PGAE South | 
      
        | AVENAL_6_AVSLR1 | Avenal Solar 1 | Forced | 7.90 | 2.90 | PGAE South | 
      
        | AVENAL_6_AVSLR2 | Avenal Solar 2 | Forced | 7.90 | 2.90 | PGAE South | 
      
        | AVENAL_6_SANDDG | Sand Drag Solar Project | Forced | 19.00 | 8.00 | PGAE Gen | 
      
        | AVENAL_6_SUNCTY | Sun City Solar Project | Forced | 20.00 | 9.00 | PGAE Gen | 
      
        | AVSOLR_2_SOLAR | AV SOLAR RANCH 1 | Forced | 241.50 | 0.00 | SCE Gen | 
      
        | BALCHS_7_UNIT 1 | BALCH 1 PH UNIT 1 | Forced | 33.00 | 2.00 | PGAE South | 
      
        | BARRE_6_PEAKER | Barre Peaker | Planned | 47.00 | 0.00 | SCE Gen | 
      
        | BASICE_2_UNITS | Calpine King City Cogen | Planned | 120.00 | 0.00 | PGAE Gen | 
      
        | BDGRCK_1_UNITS | BADGER CREEK LIMITED | Forced | 48.08 | 6.08 | PGAE South | 
      
        | BEARMT_1_UNIT | Bear Mountain Limited | Forced | 49.21 | 5.21 | PGAE Gen | 
      
        | BGSKYN_2_AS2SR1 | Antelope Solar 2 | Forced | 105.00 | 30.00 | SCE Gen | 
      
        | BIGCRK_2_EXESWD | BIG CREEK HYDRO PROJECT PSP | Forced | 820.00 | 105.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR2 | Big Sky Solar 4 | Forced | 40.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR3 | Big Sky Summer | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR4 | Western Antelope Blue Sky Ranch B | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR5 | Big Sky Solar 2 | Forced | 5.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR6 | Solverde 1 | Forced | 85.00 | 0.00 | SCE Gen | 
      
        | BIGSKY_2_SOLAR7 | Big Sky Solar 1 | Forced | 50.00 | 0.00 | SCE Gen | 
      
        | BISHOP_1_ALAMO | BISHOP CREEK PLANT 2  AND  6 | Planned/Forced | 13.40 | 1.00 | SCE Gen | 
      
        | BISHOP_1_UNITS | BISHOP CREEK PLANT 3  AND  4 | Planned/Forced | 15.80 | 4.50 | SCE Gen | 
      
        | BLACK_7_UNIT 1 | JAMES B. BLACK 1 | Forced | 85.00 | 3.00 | PGAE North | 
      
        | BLAST_1_WIND | Mountain View IV Wind | Planned | 49.00 | 2.00 | SCE Gen | 
      
        | BLULKE_6_BLUELK | Blue Lake Power | Forced | 12.00 | 12.00 | PGAE Gen | 
      
        | BLYTHE_1_SOLAR1 | Blythe Solar 1 Project | Forced | 21.00 | 1.00 | SCE Gen | 
      
        | BORDER_6_UNITA1 | CalPeak Power Border Unit 1 | Forced | 51.25 | 3.25 | SDGE Gen | 
      
        | BRDGVL_7_BAKER | Baker Station Hydro | Forced | 1.49 | 1.49 | PGAE Gen | 
      
        | BRDSLD_2_HIWIND | High Winds Energy Center | Forced | 162.00 | 18.00 | PGAE Gen | 
      
        | BRDSLD_2_MTZUM2 | NextEra Energy Montezuma Wind II | Forced | 78.20 | 0.00 | PGAE Gen | 
      
        | BRDSLD_2_MTZUMA | FPL Energy Montezuma Wind | Forced | 36.80 | 2.30 | PGAE Gen | 
      
        | BRDSLD_2_SHILO1 | Shiloh I Wind Project | Forced | 150.00 | 9.00 | PGAE Gen | 
      
        | BRDSLD_2_SHILO2 | SHILOH WIND PROJECT 2 | Forced | 150.00 | 6.00 | PGAE Gen | 
      
        | BRDSLD_2_SHLO3A | Shiloh III Wind Project, LLC | Forced | 102.50 | 0.00 | PGAE Gen | 
      
        | BRDSLD_2_SHLO3B | Shiloh IV Wind Project | Forced | 100.00 | 5.70 | PGAE Gen | 
      
        | BREGGO_6_SOLAR | NRG Borrego Solar One | Forced | 26.00 | 1.60 | SDGE Gen | 
      
        | BRODIE_2_WIND | Coram Brodie Wind Project | Forced | 102.00 | 0.00 | SCE Gen | 
      
        | BUCKCK_2_HYDRO | Lassen Station Hydro | Forced | 0.99 | 0.99 | PGAE Gen | 
      
        | BUCKWD_1_QF | Buckwind Re-powering project | Forced | 16.50 | 1.50 | SCE Gen | 
      
        | CALFTS_2_CFSSR1 | California Flats Solar South | Forced | 150.00 | 17.22 | PGAE Gen | 
      
        | CAMPFW_7_FARWST | CAMP FAR WEST HYDRO | Planned | 8.00 | 8.00 | PGAE Gen | 
      
        | CARBOU_7_UNIT 1 | CARIBOU PH 1 UNIT 1 | Forced | 24.00 | 0.00 | PGAE North | 
      
        | CARLS1_2_CARCT1 | Carlsbad 1 | Forced | 422.00 | 211.00 | SDGE Gen | 
      
        | CARLS2_1_CARCT1 | Carlsbad 2 | Forced | 105.50 | 105.50 | SDGE Gen | 
      
        | CENTER_2_RHONDO | MWD Rio Hondo Hydroelectric Recovery Pla | Forced | 1.91 | 1.91 | SCE Gen | 
      
        | CENTER_6_PEAKER | Center Peaker | Planned | 47.11 | 0.00 | SCE Gen | 
      
        | CHALK_1_UNIT | CHALK CLIFF LIMITED | Forced | 48.67 | 8.67 | PGAE Gen | 
      
        | CHINO_6_SMPPAP | AltaGas Pomona Energy | Forced | 44.00 | 44.00 | SCE Gen | 
      
        | CHINO_7_MILIKN | MN Milliken Genco LLC | Forced | 1.90 | 1.90 | SCE Gen | 
      
        | CLRKRD_6_LIMESD | Lime Saddle Hydro | Forced | 2.00 | 2.00 | PGAE Gen | 
      
        | CNTRVL_6_UNIT | Centerville | Forced | 6.40 | 6.40 | PGAE Gen | 
      
        | COCOPP_2_CTG1 | Marsh Landing 1 | Forced | 204.20 | 5.52 | PGAE South | 
      
        | COCOPP_2_CTG2 | Marsh Landing 2 | Forced | 202.70 | 4.80 | PGAE South | 
      
        | COCOPP_2_CTG3 | Marsh Landing 3 | Forced | 208.96 | 11.84 | PGAE South | 
      
        | COCOPP_2_CTG4 | Marsh Landing 4 | Forced | 204.29 | 5.80 | PGAE South | 
      
        | COCOSB_6_SOLAR | Oakley Solar Project | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | COLEMN_2_UNIT | Coleman | Planned | 13.00 | 13.00 | PGAE North | 
      
        | COLGAT_7_UNIT 1 | Colgate Powerhouse Unit 1 | Planned | 176.72 | 11.72 | PGAE North | 
      
        | COLGAT_7_UNIT 2 | Colgate Powerhouse Unit 2 | Planned | 175.67 | 10.67 | PGAE North | 
      
        | COLTON_6_AGUAM1 | AGUA MANSA UNIT 1 (CITY OF COLTON) | Forced | 43.00 | 2.00 | SCE Gen | 
      
        | COLUSA_2_PL1X3 | Colusa Generating Station | Planned/Forced | 641.00 | 29.22 | PGAE North | 
      
        | CONTRL_1_OXBOW | Dixie Valley Geo | Forced | 60.00 | 3.00 | SCE Gen | 
      
        | COVERD_2_HCKHY1 | HATCHET CREEK | Forced | 6.89 | 6.89 | PGAE Gen | 
      
        | COVERD_2_QFUNTS | COVE ROAD HYDRO QF UNITS | Forced | 5.75 | 5.75 | PGAE North | 
      
        | COWCRK_2_UNIT | Cow Creek Hydro | Planned/Forced | 2.00 | 2.00 | PGAE Gen | 
      
        | CRNEVL_6_CRNVA | Crane Valley | Planned/Forced | 0.90 | 0.90 | PGAE Gen | 
      
        | CRNEVL_6_SJQN 2 | SAN JOAQUIN 2 | Planned | 3.20 | 3.20 | PGAE Gen | 
      
        | CRNEVL_6_SJQN 3 | SAN JOAQUIN 3 | Forced | 4.20 | 4.20 | PGAE Gen | 
      
        | CRSTWD_6_KUMYAY | Kumeyaay Wind Farm | Forced | 50.00 | 4.00 | SDGE Gen | 
      
        | CSTRVL_7_PL1X2 | Marina Land Fill Gas | Forced | 4.53 | 0.53 | PGAE South | 
      
        | CUYAMS_6_CUYSR1 | Cuyama Solar | Forced | 40.00 | 2.00 | PGAE Gen | 
      
        | DAIRLD_1_MD2BM1 | Madera Digester Genset 2 | Forced | 0.80 | 0.00 | PGAE Gen | 
      
        | DELAMO_2_SOLRC1 | Golden Springs Building C1 | Forced | 1.16 | 0.00 | SCE Gen | 
      
        | DELAMO_2_SOLRD | Golden Solar Building D | Forced | 1.25 | 0.00 | SCE Gen | 
      
        | DELTA_2_PL1X4 | DELTA ENERGY CENTER AGGREGATE | Planned/Forced | 880.00 | 321.00 | PGAE Gen | 
      
        | DEVERS_1_SEPV05 | SEPV 5 | Forced | 2.00 | 0.00 | SCE Gen | 
      
        | DINUBA_6_UNIT | Dinuba Energy, Inc. | Forced | 12.00 | 12.00 | PGAE South | 
      
        | DONNLS_7_UNIT | Donnells Hydro | Forced | 72.00 | 7.00 | PGAE Gen | 
      
        | DOUBLC_1_UNITS | DOUBLE "C" LIMITED | Forced | 52.23 | 2.43 | PGAE South | 
      
        | DREWS_6_PL1X4 | Drews Generating Plant | Forced | 41.40 | 23.40 | SCE Gen | 
      
        | DUANE_1_PL1X3 | DONALD VON RAESFELD POWER PROJECT | Forced | 147.80 | 5.80 | PGAE South | 
      
        | DVLCYN_1_UNITS | DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE | Planned | 236.80 | 0.00 | SCE Gen | 
      
        | EEKTMN_6_SOLAR1 | EE K Solar 1 | Forced | 20.00 | 0.00 | PGAE South | 
      
        | ELCABO_5_ECWSCEDYN | El Cabo Wind | Forced | 298.00 | 85.00 | EIM ARI | 
      
        | ELCABO_5_ECWSCEDYN | El Cabo Wind | Forced | 298.00 | 85.00 | SCE Gen | 
      
        | ELCAJN_6_EB1BT1 | Eastern BESS 1 | Planned | 7.50 | 0.00 | SDGE Gen | 
      
        | ELCAJN_6_LM6K | El Cajon Energy Center | Forced | 48.10 | 0.00 | SDGE Gen | 
      
        | ELKCRK_6_STONYG | STONEY GORGE HYDRO AGGREGATE | Forced | 4.90 | 0.00 | PGAE Gen | 
      
        | ELKHIL_2_PL1X3 | ELK HILLS COMBINED CYCLE (AGGREGATE) | Planned | 551.70 | 35.70 | PGAE Gen | 
      
        | ENWIND_2_WIND1 | Cameron Ridge | Forced | 47.10 | 3.10 | SCE Gen | 
      
        | ESCNDO_6_PL1X2 | MMC Escondido Aggregate | Forced | 48.71 | 0.00 | SDGE Gen | 
      
        | ESCNDO_6_UNITB1 | CalPeak Power Enterprise Unit 1 | Forced | 48.04 | 0.04 | SDGE Gen | 
      
        | ESQUON_6_LNDFIL | Neal Road Landfill Generating Facility | Forced | 2.10 | 2.10 | PGAE Gen | 
      
        | ETIWND_2_FONTNA | FONTANALYTLE CREEK POWERHOUSE P | Planned | 2.56 | 2.16 | SCE Gen | 
      
        | ETIWND_2_UNIT1 | ETIWND_2_UNIT1 | Planned | 33.60 | 32.60 | SCE Gen | 
      
        | EXCLSG_1_SOLAR | Excelsior Solar | Forced | 60.00 | 0.00 | PGAE Gen | 
      
        | FLOWD2_2_FPLWND | DIABLO WINDS | Forced | 18.00 | 2.90 | PGAE Gen | 
      
        | FLOWD_2_RT2WD2 | Ridgetop 2 | Forced | 27.39 | 0.00 | SCE Gen | 
      
        | GARNET_1_SOLAR2 | Garnet Solar Power Generation Station 1 | Forced | 4.00 | 0.00 | SCE Gen | 
      
        | GARNET_1_UNITS | GARNET GREEN POWER PROJECT AGGREGATE | Forced | 16.50 | 11.25 | SCE Gen | 
      
        | GARNET_1_WIND | GARNET WIND ENERGY CENTER | Forced | 6.50 | 0.50 | SCE Gen | 
      
        | GARNET_1_WINDS | Garnet Winds Aggregation | Forced | 22.50 | 6.00 | SCE Gen | 
      
        | GARNET_2_DIFWD1 | Difwind | Forced | 7.88 | 0.00 | SCE Gen | 
      
        | GARNET_2_WIND2 | Karen Avenue Wind Farm | Planned | 11.70 | 3.00 | SCE Gen | 
      
        | GARNET_2_WPMWD6 | WINTEC PALM | Forced | 5.93 | 5.93 | SCE Gen | 
      
        | GATWAY_2_PL1X3 | GATEWAY GENERATING STATION | Forced | 585.00 | 35.15 | PGAE South | 
      
        | GEYS11_7_UNIT11 | GEYSERS UNIT 11 (HEALDSBURG) | Forced | 74.40 | 4.40 | PGAE Gen | 
      
        | GEYS12_7_UNIT12 | GEYSERS UNIT 12 (HEALDSBURG) | Forced | 57.00 | 16.00 | PGAE Gen | 
      
        | GEYS13_7_UNIT13 | GEYSERS UNIT 13 (HEALDSBURG) | Forced | 95.00 | 45.00 | PGAE Gen | 
      
        | GEYS14_7_UNIT14 | GEYSERS UNIT 14 (HEALDSBURG) | Forced | 70.00 | 16.00 | PGAE Gen | 
      
        | GEYS16_7_UNIT16 | GEYSERS UNIT 16 (HEALDSBURG) | Forced | 85.00 | 42.00 | PGAE Gen | 
      
        | GEYS17_7_UNIT17 | GEYSERS UNIT 17 (HEALDSBURG) | Forced | 60.00 | 2.00 | PGAE Gen | 
      
        | GEYS18_7_UNIT18 | GEYSERS UNIT 18 (HEALDSBURG) | Forced | 72.00 | 28.00 | PGAE Gen | 
      
        | GEYS20_7_UNIT20 | GEYSERS UNIT 20 (HEALDSBURG) | Forced | 62.00 | 26.00 | PGAE Gen | 
      
        | GIFFEN_6_SOLAR | Giffen Solar Station | Forced | 10.00 | 4.00 | PGAE South | 
      
        | GIFFEN_6_SOLAR1 | Aspiration Solar G | Forced | 9.00 | 3.00 | PGAE Gen | 
      
        | GILROY_1_UNIT | GILROY COGEN AGGREGATE | Planned | 120.00 | 0.00 | PGAE South | 
      
        | GLNARM_7_UNIT 2 | GLEN ARM UNIT 2 | Forced | 22.30 | 22.30 | SCE Gen | 
      
        | GOLETA_6_EXGEN | EXXON COMPANY USA | Forced | 48.20 | 48.20 | SCE Gen | 
      
        | GRADYW_5_GDYWD1 | Grady Wind | Planned | 200.00 | 120.00 | EIM ARI | 
      
        | GRIZLY_1_UNIT 1 | GRIZZLY HYDRO | Forced | 20.00 | 20.00 | PGAE North | 
      
        | GRNVLY_7_SCLAND | SANTA CRUZ LANDFILL GENERATING PLANT | Forced | 3.04 | 0.00 | PGAE South | 
      
        | GRSCRK_6_BGCKWW | BIG CREEK WATER WORKS - CEDAR FLAT | Forced | 5.00 | 5.00 | PGAE Gen | 
      
        | GWFPWR_1_UNITS | Hanford Peaker Plant | Forced | 98.46 | 4.95 | PGAE Gen | 
      
        | GYS5X6_7_UNITS | GEYSERS UNITS 5 & 6 AGGREGATE | Forced | 85.00 | 5.00 | PGAE Gen | 
      
        | GYS7X8_7_UNITS | GEYSERS UNITS 7 & 8 AGGREGATE | Forced | 82.00 | 6.00 | PGAE Gen | 
      
        | HATLOS_6_BWDHY1 | Bidwell Ditch | Forced | 2.00 | 2.00 | PGAE Gen | 
      
        | HATRDG_2_WIND | Hatchet Ridge Wind Farm | Forced | 102.00 | 0.00 | PGAE Gen | 
      
        | HAYPRS_6_QFUNTS | HAYPRESS HYDRO QF UNITS | Forced | 14.80 | 14.80 | PGAE North | 
      
        | HENRTA_6_SOLAR1 | Lemoore 1 | Forced | 1.50 | 0.85 | PGAE Gen | 
      
        | HENRTA_6_UNITA1 | GWF HENRIETTA PEAKER PLANT UNIT 1 | Forced | 49.98 | 3.53 | PGAE South | 
      
        | HENRTA_6_UNITA2 | GWF HENRIETTA PEAKER PLANT UNIT 2 | Forced | 49.42 | 3.08 | PGAE South | 
      
        | HIDSRT_2_UNITS | HIGH DESERT POWER PROJECT AGGREGATE | Forced | 830.00 | 68.00 | SCE Gen | 
      
        | HMLTBR_6_UNITS | HAMILTON BRANCH PH (AGGREGATE) | Planned/Forced | 4.90 | 4.90 | PGAE Gen | 
      
        | HUMBPP_6_UNITS | Humboldt Bay Generating Station 1 | Planned | 97.62 | 0.00 | PGAE North | 
      
        | HYTTHM_2_UNITS | HYATT-THERMALITO PUMP-GEN (AGGREGATE) | Planned/Forced | 933.10 | 197.30 | PGAE Gen | 
      
        | INDIGO_1_UNIT 2 | INDIGO PEAKER UNIT 2 | Forced | 44.53 | 0.53 | SCE Gen | 
      
        | INLDEM_5_UNIT 1 | Inland Empire Energy Center, Unit 1 | Planned | 376.20 | 27.20 | SCE Gen | 
      
        | INSKIP_2_UNIT | INSKIP HYDRO | Forced | 8.00 | 8.00 | PGAE North | 
      
        | INTKEP_2_UNITS | CCSF Hetch_Hetchy Hydro Aggregate | Planned | 405.00 | 20.00 | PGAE Gen | 
      
        | JAWBNE_2_NSRWND | North Sky River Wind Project | Forced | 160.00 | 16.00 | SCE Gen | 
      
        | JAYNE_6_WLSLR | Westlands Solar Farm PV 1 | Planned | 18.00 | 0.00 | PGAE Gen | 
      
        | KANSAS_6_SOLAR | RE Kansas South | Forced | 20.00 | 0.00 | PGAE South | 
      
        | KEKAWK_6_UNIT | STS HYDROPOWER LTD. (KEKAWAKA) | Forced | 5.50 | 5.50 | PGAE Gen | 
      
        | KELSO_2_UNITS | Mariposa Energy | Forced | 198.03 | 3.85 | PGAE Gen | 
      
        | KERKH1_7_UNIT 1 | KERKHOFF PH 1 UNIT #1 | Forced | 13.00 | 13.00 | PGAE North | 
      
        | KERKH1_7_UNIT 1 | KERKHOFF PH 1 UNIT #1 | Forced | 13.00 | 13.00 | PGAE South | 
      
        | KERKH1_7_UNIT 3 | KERKHOFF PH 1 UNIT #3 | Forced | 12.80 | 12.80 | PGAE North | 
      
        | KERKH1_7_UNIT 3 | KERKHOFF PH 1 UNIT #3 | Forced | 12.80 | 12.80 | PGAE South | 
      
        | KERKH2_7_UNIT 1 | KERKHOFF PH 2 UNIT #1 | Forced | 153.90 | 13.90 | PGAE North | 
      
        | KERKH2_7_UNIT 1 | KERKHOFF PH 2 UNIT #1 | Forced | 153.90 | 13.90 | PGAE South | 
      
        | KERNFT_1_UNITS | KERN FRONT LIMITED | Forced | 52.40 | 4.00 | PGAE South | 
      
        | KILARC_2_UNIT 1 | KILARC HYDRO | Forced | 1.50 | 1.50 | PGAE North | 
      
        | KINGRV_7_UNIT 1 | KINGS RIVER HYDRO UNIT 1 | Planned/Forced | 51.20 | 2.70 | PGAE South | 
      
        | KNGBRG_1_KBSLR2 | Kingsburg2 | Forced | 1.50 | 0.00 | PGAE South | 
      
        | KRAMER_2_SEGS89 | LUZ SOLAR PARTNERS 8-9 AGGREGATE | Forced | 160.00 | 0.00 | SCE Gen | 
      
        | KRNCNY_6_UNIT | KERN CANYON | Forced | 11.50 | 11.50 | PGAE South | 
      
        | LAPAC_6_UNIT | LOUISIANA PACIFIC SAMOA | Forced | 20.00 | 20.00 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 1 | La Paloma Generating Plant Unit #1 | Forced | 259.80 | 3.80 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 2 | La Paloma Generating Plant Unit #2 | Forced | 260.20 | 0.20 | PGAE Gen | 
      
        | LAPLMA_2_UNIT 3 | La Paloma Generating Plant Unit #3 | Forced | 256.15 | 23.15 | PGAE Gen | 
      
        | LARKSP_6_UNIT 1 | LARKSPUR PEAKER UNIT 1 | Forced | 46.10 | 2.10 | SDGE Gen | 
      
        | LARKSP_6_UNIT 2 | LARKSPUR PEAKER UNIT 2 | Forced | 47.98 | 4.98 | SDGE Gen | 
      
        | LAROA2_2_UNITA1 | LR2 | Forced | 322.00 | 22.00 | SDGE Gen | 
      
        | LEBECS_2_UNITS | Pastoria Energy Facility | Planned | 799.47 | 43.47 | SCE Gen | 
      
        | LECEF_1_UNITS | LOS ESTEROS ENERGY FACILITY AGGREGATE | Forced | 309.84 | 11.84 | PGAE South | 
      
        | LIVOAK_1_UNIT 1 | LIVE OAK LIMITED | Forced | 49.70 | 7.70 | PGAE South | 
      
        | LMEC_1_PL1X3 | Los Medanos Energy Center AGGREGATE | Planned | 580.00 | 12.00 | PGAE Gen | 
      
        | LODI25_2_UNIT 1 | LODI GAS TURBINE | Forced | 25.00 | 3.00 | PGAE Gen | 
      
        | LODIEC_2_PL1X2 | Lodi Energy Center | Forced | 302.58 | 29.58 | PGAE Gen | 
      
        | MALCHQ_7_UNIT 1 | MALACHA HYDRO L.P. | Forced | 32.50 | 0.00 | PGAE Gen | 
      
        | MALIN_5_GCPDDYN | Grant County Hydro Facilities | Forced | 125.00 | 0.00 | PGAE Gen | 
      
        | MANZNA_2_WIND | Manzana Wind | Forced | 189.00 | 8.25 | SCE Gen | 
      
        | METEC_2_PL1X3 | Metcalf Energy Center | Planned/Forced | 593.16 | 49.16 | PGAE Gen | 
      
        | MIRLOM_2_CORONA | MWD Corona Hydroelectric Recovery Plant | Forced | 2.85 | 2.85 | SCE Gen | 
      
        | MIRLOM_2_MLBBTA | Mira Loma BESS A | Planned | 10.00 | 0.00 | SCE Gen | 
      
        | MIRLOM_2_MLBBTB | Mira Loma BESS B | Planned | 10.00 | 0.00 | SCE Gen | 
      
        | MIRLOM_2_ONTARO | Ontario RT Solar | Forced | 5.50 | 0.50 | SCE Gen | 
      
        | MIRLOM_2_TEMESC | MWD Temescal Hydroelectric Recovery Plan | Forced | 2.85 | 2.85 | SCE Gen | 
      
        | MKTRCK_1_UNIT 1 | MCKITTRICK LIMITED | Forced | 47.49 | 5.49 | PGAE South | 
      
        | MNDALY_6_MCGRTH | McGrath Beach Peaker | Forced | 47.20 | 0.00 | SCE Gen | 
      
        | MNDOTA_1_SOLAR2 | Citizen Solar B | Forced | 5.00 | 0.00 | PGAE Gen | 
      
        | MOJAVW_2_SOLAR | Mojave West | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | MONLTH_6_BOREL | BOREL HYDRO UNITS 1-3 AGGREGATE | Forced | 11.00 | 11.00 | SCE Gen | 
      
        | MONLTS_2_MONWD4 | Monolith 4 | Forced | 4.75 | 0.00 | SCE Gen | 
      
        | MONLTS_2_MONWD5 | Monolith 5 | Forced | 4.04 | 0.00 | SCE Gen | 
      
        | MONLTS_2_MONWD6 | Monolith 6 | Forced | 5.25 | 0.00 | SCE Gen | 
      
        | MONLTS_2_MONWD7 | Monolith 7 | Forced | 4.76 | 0.00 | SCE Gen | 
      
        | MRCHNT_2_PL1X3 | Desert Star Energy Center | Forced | 494.58 | 39.58 | SDGE Gen | 
      
        | MSOLAR_2_SOLAR1 | Mesquite Solar 1 | Forced | 165.00 | 10.50 | SDGE Gen | 
      
        | MSOLAR_2_SOLAR3 | Mesquite Solar 3, LLC | Forced | 152.00 | 0.00 | SDGE Gen | 
      
        | MTWIND_1_UNIT 1 | Mountain View Power Project I | Planned/Forced | 44.40 | 4.80 | SCE Gen | 
      
        | MTWIND_1_UNIT 2 | Mountain View Power Project II | Planned | 22.20 | 0.60 | SCE Gen | 
      
        | MTWIND_1_UNIT 3 | Mountain View Power Project III | Forced | 22.44 | 1.98 | SCE Gen | 
      
        | NAROW2_2_UNIT | Narrows Powerhouse Unit 2 | Planned | 55.00 | 27.00 | PGAE North | 
      
        | NCPA_7_GP2UN3 | NCPA GEO PLANT 2 UNIT 3 | Forced | 42.42 | 42.42 | PGAE Gen | 
      
        | NCPA_7_GP2UN4 | NCPA GEO PLANT 2 UNIT 4 | Forced | 52.73 | 18.73 | PGAE Gen | 
      
        | NGILAA_5_SDGDYN | NGILAA_5_SDGDYN | Forced | 57.00 | 5.00 | EIM ARI | 
      
        | NGILAA_5_SDGDYN | NGILAA_5_SDGDYN | Forced | 57.00 | 5.00 | SDGE Gen | 
      
        | OAK C_7_UNIT 1 | OAKLAND STATION C GT UNIT 1 | Forced | 55.00 | 1.50 | PGAE South | 
      
        | OAK C_7_UNIT 3 | OAKLAND STATION C GT UNIT 3 | Forced | 55.00 | 1.00 | PGAE South | 
      
        | OASIS_6_SOLAR2 | Oasis Solar | Forced | 20.00 | 1.50 | SCE Gen | 
      
        | OILFLD_7_QFUNTS | Nacimiento Hydroelectric Plant | Forced | 3.80 | 0.55 | PGAE South | 
      
        | OLDRIV_6_LKVBM1 | Lakeview Dairy Biogas | Forced | 1.00 | 0.00 | PGAE Gen | 
      
        | OLINDA_2_COYCRK | MWD Coyote Creek Hydroelectric Recovery | Forced | 3.13 | 3.13 | SCE Gen | 
      
        | OMAR_2_UNIT 1 | KERN RIVER COGENERATION CO. UNIT 1 | Forced | 78.00 | 5.70 | SCE Gen | 
      
        | OMAR_2_UNIT 2 | KERN RIVER COGENERATION CO. UNIT 2 | Forced | 78.11 | 6.21 | SCE Gen | 
      
        | OMAR_2_UNIT 3 | KERN RIVER COGENERATION CO. UNIT 3 | Forced | 81.41 | 6.51 | SCE Gen | 
      
        | ORLND_6_HIGHLI | High Line Canal Hydro | Forced | 0.50 | 0.50 | PGAE Gen | 
      
        | OTMESA_2_PL1X3 | OTAY MESA ENERGY CENTER | Forced | 603.68 | 23.68 | SDGE Gen | 
      
        | OXMTN_6_LNDFIL | Ox Mountain Landfill Generating Plant | Forced | 10.62 | 1.58 | PGAE South | 
      
        | PACLUM_6_UNIT | Humboldt Redwood | Forced | 28.80 | 6.80 | PGAE North | 
      
        | PADUA_2_ONTARO | ONTARIO/SIERRA HYDRO PSP | Planned/Forced | 1.92 | 1.22 | SCE Gen | 
      
        | PALALT_7_COBUG | Cooperatively Owned Back Up Generator | Forced | 4.50 | 3.29 | PGAE Gen | 
      
        | PANSEA_1_PANARO | Mesa Wind Project | Planned | 30.00 | 21.81 | SCE Gen | 
      
        | PEORIA_1_SOLAR | Sonora 1 | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | PINFLT_7_UNITS | PINE FLAT HYDRO AGGREGATE | Planned | 210.00 | 12.00 | PGAE Gen | 
      
        | PIOPIC_2_CTG1 | Pio Pico Unit 1 | Forced | 111.30 | 5.83 | SDGE Gen | 
      
        | PIOPIC_2_CTG2 | Pio Pico Unit 2 | Forced | 112.70 | 4.17 | SDGE Gen | 
      
        | PIOPIC_2_CTG3 | Pio Pico Unit 3 | Forced | 112.00 | 5.16 | SDGE Gen | 
      
        | PIT5_7_PL3X4 | PIT PH 5 UNITS 3 & 4 AGGREGATE | Planned | 82.00 | 0.00 | PGAE North | 
      
        | PLAINV_6_NLRSR1 | North Lancaster Ranch | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | PLAINV_6_SOLARC | Central Antelope Dry Ranch C | Forced | 20.00 | 0.00 | SCE Gen | 
      
        | PLMSSR_6_HISIER | High Sierra Cogeneration Aggregate | Forced | 6.00 | 2.99 | PGAE Gen | 
      
        | PNCHEG_2_PL1X4 | PANOCHE ENERGY CENTER (Aggregated) | Forced | 401.00 | 0.00 | PGAE Gen | 
      
        | PNCHPP_1_PL1X2 | Midway Peaking Aggregate | Forced | 119.91 | 0.00 | PGAE Gen | 
      
        | PNOCHE_1_PL1X2 | Panoche Peaker | Forced | 49.97 | 4.97 | PGAE South | 
      
        | PNOCHE_1_UNITA1 | CalPeak Power Panoche Unit 1 | Forced | 52.01 | 4.01 | PGAE Gen | 
      
        | PRCTVY_1_MIGBT1 | Miguel BESS | Forced | 2.00 | 2.00 | SDGE Gen | 
      
        | PWEST_1_UNIT | PACIFIC WEST 1 WIND GENERATION | Forced | 2.10 | 2.10 | SCE Gen | 
      
        | RAMON_2_SCEDYN | RAMON_2_SCEDYN | Forced | 359.60 | 252.60 | SCE Gen | 
      
        | RAWHIDE_6_UNIT | Chevron Wind | Forced | 16.50 | 3.00 | EIM PAC | 
      
        | RECTOR_2_KAWH 1 | KAWEAH PH 1 UNIT 1 | Forced | 2.25 | 2.25 | SCE Gen | 
      
        | REDOND_7_UNIT 5 | REDONDO GEN STA. UNIT 5 | Forced | 178.87 | 18.87 | SCE Gen | 
      
        | REDOND_7_UNIT 6 | REDONDO GEN STA. UNIT 6 | Planned/Forced | 175.00 | 175.00 | SCE Gen | 
      
        | REDOND_7_UNIT 7 | REDONDO GEN STA. UNIT 7 | Forced | 505.96 | 30.96 | SCE Gen | 
      
        | REDOND_7_UNIT 8 | REDONDO GEN STA. UNIT 8 | Forced | 495.90 | 20.90 | SCE Gen | 
      
        | REEDLY_6_SOLAR | Terzian | Forced | 1.23 | 0.00 | PGAE Gen | 
      
        | RENWD_1_QF | Renwind re-powering project | Forced | 10.00 | 1.00 | SCE Gen | 
      
        | RICHMN_7_BAYENV | BAY ENVIRONMENTAL (NOVE POWER) | Forced | 2.50 | 2.00 | PGAE Gen | 
      
        | ROSMDW_2_WIND1 | Pacific Wind - Phase 1 | Planned | 140.00 | 6.00 | SCE Gen | 
      
        | RTREE_2_WIND2 | Rising Tree 2 | Forced | 19.80 | 0.00 | SCE Gen | 
      
        | RUSCTY_2_UNITS | Russell City Energy Center | Forced | 620.50 | 23.10 | PGAE South | 
      
        | RVSIDE_2_RERCU3 | Riverside Energy Res. Ctr Unit 3 | Forced | 49.00 | 0.00 | SCE Gen | 
      
        | RVSIDE_2_RERCU4 | Riverside Energy Res. Ctr Unit 4 | Forced | 49.00 | 0.00 | SCE Gen | 
      
        | RVSIDE_6_RERCU1 | Riverside Energy Res. Ctr Unit 1 | Forced | 48.35 | 0.00 | SCE Gen | 
      
        | RVSIDE_6_RERCU2 | Riverside Energy Res. Ctr Unit 2 | Forced | 48.50 | 0.00 | SCE Gen | 
      
        | RVSIDE_6_SPRING | SPRINGS GENERATION PROJECT AGGREGATE | Forced | 36.00 | 0.00 | SCE Gen | 
      
        | SALTSP_7_UNITS | SALT SPRINGS HYDRO AGGREGATE | Planned | 46.00 | 46.00 | PGAE North | 
      
        | SANDLT_2_SUNITS | Mojave Solar | Forced | 275.00 | 0.00 | SCE Gen | 
      
        | SANTFG_7_UNITS | GEYSERS CALISTOGA AGGREGATE | Planned/Forced | 92.10 | 47.10 | PGAE Gen | 
      
        | SANWD_1_QF | San Gorgonio Farms Wind Farm | Planned | 31.00 | 5.10 | SCE Gen | 
      
        | SBERDO_2_PSP3 | Mountainview Gen Sta. Unit 3 | Forced | 555.00 | 10.00 | SCE Gen | 
      
        | SBERDO_2_PSP4 | Mountainview Gen Sta. Unit 4 | Forced | 555.00 | 10.00 | SCE Gen | 
      
        | SBERDO_2_SNTANA | SANTA ANA PSP | Planned | 6.95 | 6.95 | SCE Gen | 
      
        | SBERDO_6_MILLCK | MILL CREEK PSP | Planned/Forced | 3.93 | 1.03 | SCE Gen | 
      
        | SCEHOV_2_HOOVER | SCEHOV_2_HOOVER | Forced | 287.01 | 78.01 | SCE Gen | 
      
        | SCHLTE_1_PL1X3 | Tracy Combined Cycle Power Plant | Forced | 336.04 | 18.58 | PGAE Gen | 
      
        | SEARLS_7_ARGUS | Argus Cogeneration | Forced | 19.00 | 19.00 | SCE Gen | 
      
        | SIERRA_1_UNITS | HIGH SIERRA LIMITED | Forced | 52.43 | 2.63 | PGAE Gen | 
      
        | SLST13_2_SOLAR1 | Quinto Solar PV Project | Forced | 107.60 | 13.50 | PGAE Gen | 
      
        | SLSTR1_2_SOLAR1 | Solar Star 1 | Forced | 310.00 | 155.00 | SCE Gen | 
      
        | SLUISP_2_UNITS | SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) | Planned | 374.43 | 124.43 | PGAE Gen | 
      
        | SMUDGO_7_UNIT 1 | SONOMA POWER PLANT | Forced | 53.00 | 0.00 | PGAE Gen | 
      
        | SPAULD_6_UNIT12 | SPAULDING HYDRO PH 1 & 2 AGGREGATE | Forced | 11.40 | 7.00 | PGAE North | 
      
        | SPBURN_7_SNOWMT | SPBURN_7_SNOWMT | Forced | 3.00 | 3.00 | PGAE North | 
      
        | SPIAND_1_ANDSN2 | SPI Anderson 2 | Forced | 27.15 | 0.00 | PGAE Gen | 
      
        | SPOINT_2_MEADDYN | SPOINT_2_MEADDYN | Forced | 325.00 | 325.00 | SCE Gen | 
      
        | SPOINT_2_PARKERDYN | Southpoint Energy Center | Forced | 200.00 | 200.00 | SCE Gen | 
      
        | SPRGVL_2_TULE | TULE RIVER HYDRO PLANT (PG&E) | Forced | 6.40 | 6.40 | SCE Gen | 
      
        | SPRGVL_2_TULESC | TULE RIVER HYDRO PLANT (SCE) | Forced | 2.50 | 2.50 | SCE Gen | 
      
        | STIGCT_2_LODI | LODI STIG UNIT | Forced | 49.90 | 5.90 | PGAE Gen | 
      
        | STROUD_6_WWHSR1 | Winter Wheat Solar Farm | Forced | 1.50 | 1.50 | PG&E South | 
      
        | SUMWHT_6_SWSSR1 | Summer Wheat Solar Farm | Forced | 18.50 | 0.90 | PGAE Gen | 
      
        | SUNRIS_2_PL1X3 | Sunrise Power Project AGGREGATE II | Forced | 586.02 | 28.02 | PGAE Gen | 
      
        | SUNSET_2_UNITS | MIDWAY SUNSET COGENERATION PLANT | Forced | 248.00 | 30.00 | PGAE South | 
      
        | SUTTER_2_TESLADYN | Sutter Energy Center Dynamic 2 | Forced | 270.00 | 270.00 | PGAE Gen | 
      
        | SUTTER_2_WASNDYN | Sutter Energy Center Dynamic | Forced | 270.00 | 270.00 | PGAE Gen | 
      
        | SWIFT_1_NAS | YERBA BUENA BATTERY | Planned/Forced | 4.80 | 2.80 | PGAE South | 
      
        | SYCAMR_2_UNIT 1 | Sycamore Cogeneration Unit 1 | Forced | 80.00 | 3.68 | SCE Gen | 
      
        | SYCAMR_2_UNIT 2 | Sycamore Cogeneration Unit 2 | Forced | 80.00 | 1.62 | SCE Gen | 
      
        | SYCAMR_2_UNIT 3 | Sycamore Cogeneration Unit 3 | Forced | 80.00 | 1.97 | SCE Gen | 
      
        | SYCAMR_2_UNIT 4 | Sycamore Cogeneration Unit 4 | Forced | 80.00 | 0.00 | SCE Gen | 
      
        | S_RITA_6_SOLAR1 | Sun Harvest Solar | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | TERMEX_2_PL1X3 | TDM | Forced | 625.00 | 20.00 | SDGE Gen | 
      
        | TIFFNY_1_DILLON | TIFFNY_1_DILLON | Forced | 45.00 | 0.00 | SCE Gen | 
      
        | TIGRCK_7_UNITS | TIGER CREEK HYDRO AGGREGATE | Planned | 62.00 | 62.00 | PGAE North | 
      
        | TKOPWR_6_HYDRO | Bear Creek Hydroelectric Project | Forced | 2.83 | 2.83 | PGAE Gen | 
      
        | TWISSL_6_SOLAR | Nickel 1 ("NLH1") | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | UNCHEM_1_UNIT | CONTRA COSTA CARBON PLANT | Forced | 19.00 | 7.00 | PGAE Gen | 
      
        | USWND2_1_WIND1 | Golden Hills A | Planned | 42.96 | 0.00 | PGAE Gen | 
      
        | USWND2_1_WIND2 | Golden Hills B | Forced | 42.96 | 0.00 | PGAE Gen | 
      
        | USWND2_1_WIND3 | Golden Hills C | Forced | 46.00 | 0.00 | PGAE Gen | 
      
        | USWNDR_2_LABWD1 | LaBrisa Wind Project | Forced | 9.00 | 0.00 | PGAE Gen | 
      
        | USWNDR_2_SMUD | SOLANO WIND FARM | Forced | 102.18 | 0.00 | PGAE Gen | 
      
        | USWNDR_2_SMUD2 | Solano Wind Project Phase 3 | Forced | 127.80 | 3.00 | PGAE Gen | 
      
        | USWPJR_2_UNITS | Vasco Wind | Forced | 78.20 | 0.00 | PGAE Gen | 
      
        | VACADX_1_NAS | VACA-DIXON BATTERY | Forced | 1.85 | 1.85 | PGAE North | 
      
        | VACADX_1_SOLAR | Vaca-Dixon Solar Station | Forced | 2.50 | 0.50 | PGAE North | 
      
        | VACADX_1_UNITA1 | CalPeak Power Vaca Dixon Unit 1 | Forced | 50.61 | 2.61 | PGAE Gen | 
      
        | VALLEY_5_PERRIS | MWD Perris Hydroelectric Recovery Plant | Forced | 7.94 | 7.94 | SCE Gen | 
      
        | VALLEY_5_RTS044 | SPVP044 | Forced | 8.00 | 8.00 | SCE Gen | 
      
        | VEGA_6_SOLAR1 | Vega Solar | Forced | 20.00 | 0.00 | PGAE Gen | 
      
        | VICTOR_1_SLRHES | Sunedison - Hesperia | Forced | 1.50 | 0.00 | SCE Gen | 
      
        | VICTOR_1_SOLAR1 | Victor Phelan Solar One | Forced | 17.50 | 0.00 | SCE Gen | 
      
        | VILLPK_2_VALLYV | MWD Valley View Hydroelectric Recovery P | Forced | 4.10 | 4.10 | SCE Gen | 
      
        | VINCNT_2_WESTWD | Oasis Power Plant | Planned | 59.00 | 11.00 | SCE Gen | 
      
        | VLCNTR_6_VCSLR1 | Valley Center 1 | Planned | 2.50 | 0.00 | SDGE Gen | 
      
        | VLCNTR_6_VCSLR2 | Valley Center 2 | Planned | 5.00 | 0.00 | SDGE Gen | 
      
        | WALCRK_2_CTG1 | Walnut Creek Energy Park Unit 1 | Planned | 96.43 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG2 | Walnut Creek Energy Park Unit 2 | Planned | 96.91 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG3 | Walnut Creek Energy Park Unit 3 | Planned | 96.65 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG4 | Walnut Creek Energy Park Unit 4 | Planned | 96.49 | 0.00 | SCE Gen | 
      
        | WALCRK_2_CTG5 | Walnut Creek Energy Park Unit 5 | Planned | 96.65 | 0.00 | SCE Gen | 
      
        | WARNE_2_UNIT | WARNE HYDRO AGGREGATE | Planned | 76.00 | 76.00 | SCE Gen | 
      
        | WFRESN_1_SOLAR | Joya Del Sol | Forced | 1.50 | 0.00 | PGAE Gen | 
      
        | WHTWTR_1_WINDA1 | Whitewater Hill Wind Project | Forced | 61.50 | 21.50 | SCE Gen | 
      
        | WISHON_6_UNITS | Wishon/San Joaquin  #1-A AGGREGATE | Planned | 18.40 | 18.40 | PGAE Gen | 
      
        | WNDMAS_2_UNIT 1 | BUENA VISTA ENERGY, LLC | Forced | 38.00 | 2.00 | PGAE Gen | 
      
        | WRGHTP_7_AMENGY | SMALL QF AGGREGATION - LOS BANOS | Forced | 2.50 | 1.50 | PGAE Gen | 
      
        | ZOND_6_UNIT | ZOND WINDSYSTEMS INC. | Forced | 17.10 | 17.10 | PGAE Gen | 
      
        | BGSKYN_2_ASPSR2 | Antelope Solar 2 San Pablo | Forced | 100.00 | 0.00 |  | 
      
        | DAVIS_1_SOLAR1 | Grasslands 3 | Forced | 1.00 | 0.00 |  | 
      
        | DAVIS_1_SOLAR2 | Grasslands 4 | Forced | 1.00 | 0.00 |  | 
      
        | GUERNS_6_HD3BM3 | Hanford Digester Genset 3 | Forced | 1.00 | 0.00 |  | 
      
        | GUERNS_6_VH2BM1 | Hanford Digester Genset 2 | Forced | 1.00 | 0.00 |  |