Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ACACIA_6_SOLAR West Antelope Solar Forced 20.00 4.80 SCE Gen
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 9.00 PGAE Gen
ADOBEE_1_SOLAR Adobe Solar Forced 20.00 0.00 PGAE Gen
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Planned 332.18 217.18 SCE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 25.00 0.00 PGAE South
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Forced 25.00 3.00 PGAE South
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 9.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 6.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 12.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 3.60 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 4.05 SCE Gen
ALTWD_1_QF Altwind Forced 28.84 18.34 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 0.00 SCE Gen
AVENAL_6_AVPARK Avenal Park Solar Project Forced 6.00 2.00 PGAE South
AVENAL_6_AVSLR1 Avenal Solar 1 Forced 7.90 2.90 PGAE South
AVENAL_6_AVSLR2 Avenal Solar 2 Forced 7.90 2.90 PGAE South
AVENAL_6_SANDDG Sand Drag Solar Project Forced 19.00 8.00 PGAE Gen
AVENAL_6_SUNCTY Sun City Solar Project Forced 20.00 9.00 PGAE Gen
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Forced 33.00 2.00 PGAE South
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 6.08 PGAE South
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 5.21 PGAE Gen
BGSKYN_2_AS2SR1 Antelope Solar 2 Forced 105.00 3.00 SCE Gen
BGSKYN_2_BS3SR3 Big Sky Solar 3 Forced 20.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Forced 820.00 105.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned/Forced 13.40 1.00 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned 15.80 2.60 SCE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Forced 85.00 3.00 PGAE North
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDGVL_7_BAKER Baker Station Hydro Forced 1.49 1.49 PGAE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 14.40 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 1.50 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 6.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 6.15 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 3.65 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 3.00 SCE Gen
BUCKCK_2_HYDRO Lassen Station Hydro Forced 0.99 0.99 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 1.50 SCE Gen
BUCKWD_7_WINTCV Wintec Energy, Ltd. Forced 1.32 0.66 SCE Gen
CALFTS_2_CFSSR1 California Flats Solar South Forced 150.00 11.40 PGAE Gen
CARLS1_2_CARCT1 Carlsbad 1 Forced 422.00 0.00 SDGE Gen
CENTER_2_RHONDO MWD Rio Hondo Hydroelectric Recovery Pla Forced 1.91 1.91 SCE Gen
CENTER_6_PEAKER Center Peaker Planned 47.11 0.00 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 8.67 PGAE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 1.90 SCE Gen
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00 PGAE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Planned 204.20 204.20 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Planned 202.70 202.70 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Planned 208.96 208.96 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Planned 204.29 204.29 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned/Forced 176.72 76.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Planned 175.67 17.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Forced 43.00 2.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 21.93 PGAE North
COLVIL_7_PL1X2 COLLIERVILLE HYDRO UNIT 1 & 2 AGGREGATE Planned 246.86 120.86 PGAE Gen
CONTRL_1_OXBOW Dixie Valley Geo Forced 60.00 3.00 SCE Gen
COVERD_2_HCKHY1 HATCHET CREEK Forced 6.89 6.89 PGAE Gen
COVERD_2_QFUNTS COVE ROAD HYDRO QF UNITS Forced 5.75 5.75 PGAE North
COVERD_2_RCKHY1 ROARING CREEK Forced 2.00 2.00 PGAE Gen
COWCRK_2_UNIT Cow Creek Hydro Forced 2.00 2.00 PGAE Gen
CRNEVL_6_CRNVA Crane Valley Planned/Forced 0.90 0.90 PGAE Gen
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Planned 3.20 3.20 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Planned/Forced 4.20 4.20 PGAE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Planned/Forced 50.00 0.00 SDGE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 0.53 PGAE South
CUYAMS_6_CUYSR1 Cuyama Solar Forced 40.00 2.00 PGAE Gen
DAIRLD_1_MD2BM1 Madera Digester Genset 2 Forced 0.80 0.00 PGAE Gen
DEERCR_6_UNIT 1 DEER CREEK Planned 7.00 7.00 PGAE North
DELAMO_2_SOLRC1 Golden Springs Building C1 Forced 1.16 0.00 SCE Gen
DELAMO_2_SOLRD Golden Solar Building D Forced 1.25 0.00 SCE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 44.00 PGAE Gen
DEVERS_1_SEPV05 SEPV 5 Forced 2.00 0.00 SCE Gen
DIABLO_7_UNIT 2 Diablo Canyon Unit 2 Forced 1150.00 36.00 PGAE South
DINUBA_6_UNIT Dinuba Energy, Inc. Forced 12.00 12.00 PGAE South
DMDVLY_1_UNITS DIAMOND VALLEY LAKE PUMP-GEN PLANT Forced 21.00 14.50 SCE Gen
DONNLS_7_UNIT Donnells Hydro Forced 72.00 2.00 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 1.83 PGAE South
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Forced 125.00 0.00 SCE Gen
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 23.40 SCE Gen
DRUM_7_PL3X4 Drum PH 1 Units 3 & 4 Aggregate Planned 28.90 28.90 PGAE North
DSABLA_7_UNIT De Sabla Hydro Planned 18.50 0.00 PGAE North
DSRTSL_2_SOLAR1 Desert Stateline Forced 296.19 12.19 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 5.80 PGAE South
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Forced 236.80 16.80 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Planned 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 85.00 EIM ARI
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 85.00 SCE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 0.00 SDGE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 34.70 PGAE Gen
ENERSJ_2_WIND ESJ Wind Energy Forced 155.10 3.30 SDGE Gen
ENWIND_2_WIND1 Cameron Ridge Forced 47.10 3.10 SCE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Planned/Forced 48.04 48.04 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 1.16 SCE Gen
ETIWND_2_UNIT1 ETIWND_2_UNIT1 Planned 33.60 32.60 SCE Gen
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 1.20 PGAE Gen
FORBST_7_UNIT 1 FORBESTOWN HYDRO Forced 37.50 7.50 PGAE North
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 0.00 PGAE Gen
GARNET_1_SOLAR2 Garnet Solar Power Generation Station 1 Forced 4.00 4.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 9.75 SCE Gen
GARNET_1_WIND GARNET WIND ENERGY CENTER Forced 6.50 0.50 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 1.50 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 4.50 SCE Gen
GARNET_2_WIND5 Eastwind Forced 3.00 0.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 585.00 33.75 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 6.40 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 16.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 45.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 16.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 42.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 2.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 23.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 27.00 PGAE Gen
GIFFEN_6_SOLAR Giffen Solar Station Forced 10.00 4.00 PGAE South
GIFFEN_6_SOLAR1 Aspiration Solar G Planned/Forced 9.00 3.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Forced 120.00 120.00 PGAE South
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Forced 22.07 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Forced 20.00 20.00 PGAE North
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Forced 3.04 0.00 PGAE South
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Forced 98.46 1.99 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 5.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 6.00 PGAE Gen
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned 144.00 72.00 PGAE North
HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE Planned 144.00 72.00 PGAE South
HATLOS_6_BWDHY1 Bidwell Ditch Forced 2.00 2.00 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.00 PGAE Gen
HAYPRS_6_QFUNTS HAYPRESS HYDRO QF UNITS Forced 14.80 14.80 PGAE North
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Forced 407.00 0.00 PGAE South
HENRTA_6_SOLAR1 Lemoore 1 Forced 1.50 0.85 PGAE Gen
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 2.07 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 1.62 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 71.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned/Forced 4.90 4.90 PGAE Gen
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 197.30 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 3.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 4.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 2.69 SCE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Forced 376.20 27.20 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned 405.00 206.00 PGAE Gen
JACMSR_1_JACSR1 Jacumba Solar Farm Forced 20.00 0.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 14.40 SCE Gen
KEKAWK_6_UNIT STS HYDROPOWER LTD. (KEKAWAKA) Forced 5.50 5.50 PGAE Gen
KELSO_2_UNITS Mariposa Energy Forced 198.03 2.33 PGAE Gen
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 4.00 PGAE South
KERNRG_1_UNITS South Belridge Cogen Facility Planned 55.20 15.20 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 1.60 SCE Gen
KILARC_2_UNIT 1 KILARC HYDRO Forced 1.50 1.50 PGAE North
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAKHDG_6_UNIT 2 Lake Hodges Pumped Storage-Unit2 Forced 20.00 20.00 SDGE Gen
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 0.00 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 0.00 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 256.15 19.15 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 243.78 0.78 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 6.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 4.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 32.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Forced 799.47 15.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 6.84 PGAE South
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 6.70 PGAE South
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 580.00 9.00 PGAE Gen
LODI25_2_UNIT 1 LODI GAS TURBINE Forced 25.00 3.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 28.58 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Planned/Forced 32.50 32.50 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 53.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 4.50 SCE Gen
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 18.16 PGAE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MIRLOM_2_TEMESC MWD Temescal Hydroelectric Recovery Plan Planned 2.85 2.85 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.49 PGAE South
MOJAVE_1_SIPHON MOJAVE SIPHON POWER PLANT Planned 14.36 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 7.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Forced 11.00 11.00 SCE Gen
MONTPH_7_UNITS MONTICELLO HYDRO AGGREGATE Forced 12.50 6.20 PGAE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 24.58 SDGE Gen
MRGT_6_MMAREF Miramar Energy Facility Planned 45.00 45.00 SDGE Gen
MSOLAR_2_SOLAR1 Mesquite Solar 1 Forced 165.00 10.50 SDGE Gen
MSTANG_2_SOLAR Mustang Forced 30.00 0.00 PGAE Gen
MSTANG_2_SOLAR3 Mustang 3 Forced 40.00 12.04 PGAE Gen
MSTANG_2_SOLAR4 Mustang 4 Forced 30.00 0.00 PGAE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Forced 44.40 12.60 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Forced 22.20 1.80 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 1.98 SCE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Planned 12.00 0.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Planned 55.00 55.00 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NCPA_7_GP2UN4 NCPA GEO PLANT 2 UNIT 4 Forced 52.73 18.73 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 4.00 EIM ARI
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 4.00 SDGE Gen
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Forced 12.00 12.00 PGAE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 0.48 PGAE South
OLDRIV_6_LKVBM1 Lakeview Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLINDA_2_COYCRK MWD Coyote Creek Hydroelectric Recovery Forced 3.13 3.13 SCE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 2.50 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 3.11 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 3.21 SCE Gen
OMAR_2_UNIT 4 KERN RIVER COGENERATION CO. UNIT 4 Forced 81.44 0.00 SCE Gen
ONLLPP_6_UNITS O'NEILL PUMP-GEN (AGGREGATE) Planned 25.20 0.00 PGAE Gen
ORLND_6_HIGHLI High Line Canal Hydro Forced 0.50 0.50 PGAE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 0.00 SDGE Gen
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 0.52 SCE Gen
PALALT_7_COBUG Cooperatively Owned Back Up Generator Forced 4.50 3.29 PGAE Gen
PALOMR_2_PL1X3 Palomar Energy Center Forced 575.00 45.00 SDGE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.81 SCE Gen
PARDEB_6_UNITS Pardee Power House Planned 30.00 9.30 PGAE Gen
PEORIA_1_SOLAR Sonora 1 Forced 1.50 0.00 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 100.00 PGAE Gen
PIT3_7_PL1X3 PIT PH 3 UNITS 1, 2 & 3 AGGREGATE Planned 70.60 0.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Planned 39.00 15.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Planned 40.00 15.00 PGAE North
PLAINV_6_NLRSR1 North Lancaster Ranch Forced 20.00 0.00 SCE Gen
PLAINV_6_SOLARC Central Antelope Dry Ranch C Forced 20.00 0.00 SCE Gen
PMPJCK_1_SOLAR2 Rio Bravo Solar 1 Forced 20.00 0.00 PGAE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 1.91 PGAE Gen
PNOCHE_1_PL1X2 Panoche Peaker Forced 49.97 4.97 PGAE South
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
POTTER_6_UNITS Potter Valley Planned/Forced 10.10 10.10 PGAE North
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Forced 635.00 10.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 251.60 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Forced 2.25 2.25 SCE Gen
REDOND_7_UNIT 5 REDONDO GEN STA. UNIT 5 Forced 178.87 18.87 SCE Gen
REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 Forced 505.96 30.96 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Forced 495.90 20.90 SCE Gen
REEDLY_6_SOLAR Terzian Forced 1.23 0.00 PGAE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 2.50 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.70 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 0.00 SCE Gen
RTEDDY_2_SOLAR2 Rosamond West Solar 2 Forced 54.00 2.00 SCE Gen
RTREE_2_WIND2 Rising Tree 2 Forced 19.80 0.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 620.50 19.60 PGAE South
RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 Planned 49.00 0.00 SCE Gen
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Planned 46.00 12.00 PGAE North
SANDLT_2_SUNITS Mojave Solar Forced 275.00 27.00 SCE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 35.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 1.70 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 555.00 3.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 555.00 3.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 1.03 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 64.01 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 336.04 18.49 PGAE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 2.03 PGAE Gen
SLST13_2_SOLAR1 Quinto Solar PV Project Forced 107.60 9.25 PGAE Gen
SLSTR1_2_SOLAR1 Solar Star 1 Forced 310.00 0.00 SCE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 124.43 PGAE Gen
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 1.00 PGAE Gen
SMYRNA_1_DL1SR1 Delano Land 1 Forced 1.00 0.00 PGAE Gen
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Forced 11.40 7.00 PGAE North
SPBURN_7_SNOWMT SPBURN_7_SNOWMT Forced 3.00 3.00 PGAE North
SPICER_1_UNITS SPICER HYDRO UNITS 1-3 AGGREGATE Planned 6.00 0.00 PGAE Gen
SPOINT_2_MEADDYN SPOINT_2_MEADDYN Forced 325.00 325.00 SCE Gen
SPOINT_2_PARKERDYN Southpoint Energy Center Forced 200.00 200.00 SCE Gen
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Planned 7.00 7.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STROUD_6_WWHSR1 Winter Wheat Solar Farm Forced 1.50 1.50 PG&E South
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 22.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 24.00 PGAE South
SUTTER_2_TESLADYN Sutter Energy Center Dynamic 2 Forced 270.00 270.00 PGAE Gen
SUTTER_2_WASNDYN Sutter Energy Center Dynamic Forced 270.00 270.00 PGAE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 80.00 1.09 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 80.00 5.60 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 80.00 2.92 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 80.00 3.26 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 18.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 0.00 SCE Gen
TKOPWR_6_HYDRO Bear Creek Hydroelectric Project Forced 2.83 2.83 PGAE Gen
TOPAZ_2_SOLAR Topaz Solar Farms Forced 550.00 0.00 PGAE South
TORTLA_1_SOLAR Longboat Solar Planned 20.00 0.00 SCE Gen
TRNQL8_2_AMASR1 Tranquillity 8 Amarillo Forced 20.00 0.00 PGAE Gen
TRNQL8_2_AZUSR1 Tranquillity 8 Azul Forced 20.00 0.00 PGAE Gen
TULEWD_1_TULWD1 Tule Wind Forced 127.60 0.00 SDGE Gen
TWISSL_6_SOLAR Nickel 1 ("NLH1") Forced 1.50 0.00 PGAE Gen
ULTPFR_1_UNIT 1 Rio Bravo Fresno Forced 24.30 24.30 PGAE South
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 6.00 PGAE Gen
USWND2_1_WIND1 Golden Hills A Planned 42.96 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 2.30 PGAE Gen
USWNDR_2_LABWD1 LaBrisa Wind Project Forced 9.00 3.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 1.85 PGAE North
VACADX_1_SOLAR Vaca-Dixon Solar Station Forced 2.50 0.50 PGAE North
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61 PGAE Gen
VALLEY_5_PERRIS MWD Perris Hydroelectric Recovery Plant Forced 7.94 7.94 SCE Gen
VALLEY_5_REDMTN MWD Red Mountain Hydroelectric Recovery Forced 5.90 2.90 SCE Gen
VALLEY_5_RTS044 SPVP044 Forced 8.00 8.00 SCE Gen
VENWD_1_WIND2 Windpark Unlimited 2 Forced 16.05 1.28 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 19.70 SCE Gen
VILLPK_2_VALLYV MWD Valley View Hydroelectric Recovery P Forced 4.10 4.10 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned 59.00 4.00 SCE Gen
VOLTA_7_QFUNTS VOLTA_7_QFUNTS Forced 1.30 1.10 PGAE North
VSTAES_6_VESBT1 Vista Energy Storage Forced 40.00 1.90 SDGE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 21.50 SCE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Planned 18.40 18.40 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 2.00 PGAE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 1.50 PGAE Gen
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
BGSKYN_2_ASPSR2 Antelope Solar 2 San Pablo Forced 100.00 4.80
GUERNS_6_HD3BM3 Hanford Digester Genset 3 Forced 1.00 0.00
GUERNS_6_VH2BM1 Hanford Digester Genset 2 Forced 1.00 0.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
EIM ARI 0 2 89.00 0.00
PG&E South 0 1 0.00 1.50
PGAE Gen 28 106 1406.19 745.22
PGAE North 19 18 256.22 188.70
PGAE South 6 36 269.06 1013.75
SCE Gen 24 108 1301.47 875.45
SDGE Gen 3 24 153.61 113.04
0 3 4.80 0.00
Total 80 298 3480.35 2937.66


Report Generated on:
09/09/2019 08:30:00 (PPT)
Filtered Parameters:
Date = 09/10/2019
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.