Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 8.00 PGAE Gen
ADOBEE_1_SOLAR Adobe Solar Forced 20.00 0.00 PGAE Gen
ALAMIT_2_PL1X3 Alamitos Energy Center Unit 7 Forced 677.00 0.00 SCE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 25.00 2.00 PGAE South
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Forced 25.00 2.00 PGAE South
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 6.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 5.00 SCE Gen
ALTA3A_2_CPCE8 Alta Wind 8 Planned 150.00 6.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 1.50 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 6.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 4.05 SCE Gen
ALTWD_1_QF Altwind Forced 28.84 18.34 SCE Gen
ANAHM_2_CANYN4 CANYON POWER PLANT UNIT 4 Planned 49.40 49.40 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 42.81 SCE Gen
APLHIL_1_SLABCK SLAB CREEK HYDRO Forced 1.00 0.00 PGAE Gen
AVENAL_6_SANDDG Sand Drag Solar Project Forced 19.00 0.00 PGAE Gen
AVENAL_6_SUNCTY Sun City Solar Project Forced 20.00 0.00 PGAE Gen
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Forced 33.00 2.00 PGAE South
BARRE_6_PEAKER Barre Peaker Forced 47.00 47.00 SCE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 428.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 5.08 PGAE South
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 4.21 PGAE Gen
BGSKYN_2_AS2SR1 Antelope Solar 2 Forced 105.00 0.00 SCE Gen
BGSKYN_2_BS3SR3 Big Sky Solar 3 Forced 20.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Forced 820.00 120.00 SCE Gen
BIGSKY_2_BSKSR6 Big Sky Solar 6 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR7 Big Sky Solar 7 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR8 Big Sky Solar 8 Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 2.00 SCE Gen
BKRFLD_2_SOLAR1 Bakersfield 111 Forced 1.38 0.00 PGAE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Forced 85.00 3.00 PGAE North
BLAST_1_WIND Mountain View IV Wind Planned 49.00 2.00 SCE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BLYTHE_1_SOLAR1 Blythe Solar 1 Project Forced 21.00 1.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 3.25 SDGE Gen
BRDGVL_7_BAKER Baker Station Hydro Forced 1.49 1.49 PGAE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 14.40 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 4.60 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 3.00 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 0.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 2.05 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 3.65 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 6.00 SCE Gen
BUCKCK_2_HYDRO Lassen Station Hydro Forced 0.99 0.99 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 3.00 SCE Gen
BUCKWD_7_WINTCV Wintec Energy, Ltd. Forced 1.32 0.66 SCE Gen
CAMCHE_1_PL1X3 CAMANCHE UNITS 1, 2 & 3 AGGREGATE Forced 9.99 8.09 PGAE Gen
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned 24.00 24.00 PGAE North
CARLS1_2_CARCT1 Carlsbad 1 Forced 422.00 0.00 SDGE Gen
CARLS2_1_CARCT1 Carlsbad 2 Forced 105.50 105.50 SDGE Gen
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 1.40 PGAE Gen
CATLNA_2_SOLAR Catalina Solar - Phases 1 and 2 Forced 110.00 0.00 SCE Gen
CENTER_2_RHONDO MWD Rio Hondo Hydroelectric Recovery Pla Forced 1.91 1.91 SCE Gen
CENTER_6_PEAKER Center Peaker Planned 47.11 0.00 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 6.67 PGAE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 1.90 SCE Gen
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00 PGAE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 0.00 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 0.00 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 4.34 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 0.00 PGAE South
COCOSB_6_SOLAR Oakley Solar Project Forced 1.50 0.00 PGAE Gen
COLEMN_2_UNIT Coleman Forced 13.00 13.00 PGAE North
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned/Forced 176.72 176.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Planned/Forced 175.67 175.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 26.77 PGAE North
CONTRL_1_RUSHCK RUSH CREEK Planned 11.94 11.94 SCE Gen
COVERD_2_MCKHY1 Montgomery Creek Hydro Forced 2.80 1.30 PGAE Gen
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Planned 3.20 3.20 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20 PGAE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Planned 50.00 0.00 SDGE Gen
CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN Forced 7.00 0.00 PGAE South
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 0.53 PGAE South
CUMBIA_1_SOLAR Columbia Solar Energy II Forced 19.00 0.00 PGAE Gen
CUYAMS_6_CUYSR1 Cuyama Solar Planned 40.00 40.00 PGAE Gen
DAIRLD_1_MD2BM1 Madera Digester Genset 2 Forced 0.80 0.00 PGAE Gen
DAVIS_1_SOLAR1 Grasslands 3 Forced 1.00 0.00 PGAE Gen
DAVIS_1_SOLAR2 Grasslands 4 Forced 1.00 0.00 PGAE Gen
DEERCR_6_UNIT 1 DEER CREEK Planned 7.00 7.00 PGAE North
DELAMO_2_SOLRC1 Golden Springs Building C1 Forced 1.16 0.00 SCE Gen
DELAMO_2_SOLRD Golden Solar Building D Forced 1.25 0.00 SCE Gen
DELSUR_6_CREST Delsur Aggregate Solar Resources Forced 10.00 0.00 SCE Gen
DELSUR_6_DRYFRB Dry Farm Ranch B Forced 5.00 0.00 SCE Gen
DELSUR_6_SOLAR1 Summer Solar North Forced 6.50 0.00 SCE Gen
DEVERS_1_SEPV05 SEPV 5 Forced 2.00 0.00 SCE Gen
DMDVLY_1_UNITS DIAMOND VALLEY LAKE PUMP-GEN PLANT Forced 21.00 21.00 SCE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 0.93 PGAE South
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Forced 125.00 0.00 SCE Gen
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 23.40 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 147.80 PGAE South
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Forced 236.80 0.00 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Planned 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 35.00 APS Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 35.00 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Planned 7.50 0.00 SDGE Gen
ELCAJN_6_LM6K El Cajon Energy Center Planned 48.10 48.10 SDGE Gen
ELDORO_7_UNIT 2 El Dorado Unit 2 Planned/Forced 11.00 11.00 PGAE North
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 26.70 PGAE Gen
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 10.50 PGAE South
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 0.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 0.00 SCE Gen
ENERSJ_2_WIND ESJ Wind Energy Planned/Forced 155.10 19.80 SDGE Gen
ENWIND_2_WIND1 Cameron Ridge Forced 47.10 0.00 SCE Gen
ENWIND_2_WIND2 Ridgetop I Forced 38.24 0.00 SCE Gen
ESCNDO_6_EB1BT1 Escondido BESS 1 Planned 10.00 0.00 SDGE Gen
ESCNDO_6_EB2BT2 Escondido BESS 2 Planned 10.00 0.00 SDGE Gen
ESCNDO_6_EB3BT3 Escondido BESS 3 Planned 10.00 0.00 SDGE Gen
ESCNDO_6_UNITB1 CalPeak Power Enterprise Unit 1 Forced 48.04 0.04 SDGE Gen
ESQUON_6_LNDFIL Neal Road Landfill Generating Facility Forced 2.10 1.00 PGAE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned/Forced 2.56 2.06 SCE Gen
ETIWND_2_UNIT1 ETIWND_2_UNIT1 Planned 33.60 32.60 SCE Gen
EXCLSG_1_SOLAR Excelsior Solar Forced 60.00 0.00 PGAE Gen
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 1.16 PGAE Gen
FLOWD_2_RT2WD2 Ridgetop 2 Forced 27.39 0.00 SCE Gen
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 11.30 PGAE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 6.75 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 1.50 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 585.00 35.01 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 0.40 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 11.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 95.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 8.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 29.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 0.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 72.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 62.00 PGAE Gen
GIFFEN_6_SOLAR Giffen Solar Station Forced 10.00 0.00 PGAE South
GLNARM_2_UNIT 5 Glenarm Turbine 5 Planned 65.81 0.00 SCE Gen
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Forced 22.07 22.07 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GLOW_6_SOLAR Antelope Power Plant Forced 20.00 0.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIDLY_6_SOLAR GRIDLEY MAIN TWO Forced 2.50 2.50 PGAE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Forced 20.00 20.00 PGAE North
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GUERNS_6_HD3BM3 Hanford Digester Genset 3 Forced 1.00 0.00 PGAE Gen
GUERNS_6_VH2BM1 Hanford Digester Genset 2 Forced 1.00 0.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Forced 98.46 0.69 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 2.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 3.00 PGAE Gen
HALSEY_6_UNIT HALSEY HYDRO Planned 13.50 13.50 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 33.00 PGAE Gen
HAYPRS_6_QFUNTS HAYPRESS HYDRO QF UNITS Forced 14.80 14.80 PGAE North
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Planned 407.00 0.00 PGAE South
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Planned/Forced 407.00 407.00 PGAE South
HENRTA_6_SOLAR2 Westside Solar Power PV1 Forced 2.00 2.00 PGAE Gen
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.42 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 0.97 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 11.00 SCE Gen
HINSON_6_LBECH1 Long Beach Unit 1 Forced 65.00 65.00 SCE Gen
HINSON_6_LBECH2 Long Beach Unit 2 Forced 65.00 65.00 SCE Gen
HINSON_6_LBECH3 Long Beach Unit 3 Forced 65.00 65.00 SCE Gen
HINSON_6_LBECH4 Long Beach Unit 4 Forced 65.00 65.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Planned/Forced 4.90 4.90 PGAE Gen
HNTGBH_2_PL1X3 Huntington Beach Energy Forced 674.00 0.00 SCE Gen
HNTGBH_7_UNIT 1 HUNTINGTON BEACH GEN STA. UNIT 1 Forced 225.75 0.00 SCE Gen
HNTGBH_7_UNIT 2 HUNTINGTON BEACH GEN STA. UNIT 2 Forced 225.80 0.00 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 0.00 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 668.10 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Forced 44.00 3.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 3.53 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 2.69 SCE Gen
INDVLY_1_UNITS Indian Valley Hydro Planned 3.01 3.01 PGAE North
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Forced 376.20 0.00 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned 405.00 293.00 PGAE Gen
IVSLR2_2_SM2SR1 Silver Ridge Mount Signal 2 Forced 150.00 0.00 SDGE Gen
JACMSR_1_JACSR1 Jacumba Solar Farm Planned 20.00 0.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 6.40 SCE Gen
KANSAS_6_SOLAR RE Kansas South Forced 20.00 0.00 PGAE South
KEKAWK_6_UNIT STS HYDROPOWER LTD. (KEKAWAKA) Forced 5.50 5.50 PGAE Gen
KELSO_2_UNITS Mariposa Energy Forced 198.03 0.00 PGAE Gen
KELYRG_6_UNIT KELLY RIDGE HYDRO Planned 11.00 11.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 3.10 PGAE South
KERNRG_1_UNITS South Belridge Cogen Facility Forced 55.20 0.00 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Planned/Forced 25.60 7.60 SCE Gen
KILARC_2_UNIT 1 KILARC HYDRO Forced 1.50 1.50 PGAE North
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LACIEN_2_VENICE MWD Venice Hydroelectric Recovery Plant Forced 9.95 9.95 SCE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 259.80 0.00 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 260.20 1.20 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Planned 256.15 68.15 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 253.29 5.29 PGAE Gen
LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 Forced 46.10 5.10 SDGE Gen
LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 Forced 47.98 6.98 SDGE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 6.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Forced 799.47 0.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 6.84 PGAE South
LEPRFD_1_KANSAS Kansas Forced 20.00 1.40 PGAE Gen
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 6.70 PGAE South
LMBEPK_2_UNITA3 Goose Haven Energy Center, Unit #1 Forced 47.40 0.00 PGAE Gen
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 580.00 0.00 PGAE Gen
LODI25_2_UNIT 1 LODI GAS TURBINE Forced 25.00 2.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 19.58 PGAE Gen
MAGUND_1_BKISR1 Bakersfield Industrial 1 Forced 1.00 0.00 PGAE Gen
MAGUND_1_BKSSR2 Bakersfield Solar 1 Forced 5.25 0.00 PGAE Gen
MALAGA_1_PL1X2 Malaga Power Aggregate Planned/Forced 96.00 48.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Planned/Forced 32.50 32.50 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 125.00 PGAE Gen
MANTEC_1_ML1SR1 Manteca Land 1 Forced 1.00 0.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 4.50 SCE Gen
MARCPW_6_SOLAR1 Maricopa West Solar PV Forced 20.00 20.00 PGAE Gen
MCSWAN_6_UNITS MC SWAIN HYDRO Planned 10.00 10.00 PGAE South
MERCED_1_SOLAR1 Mission Solar Forced 1.50 0.00 PGAE Gen
MERCED_1_SOLAR2 Merced Solar Forced 1.50 0.00 PGAE South
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 7.16 PGAE Gen
MIDWD_6_WNDLND Windland Refresh 1 Forced 7.45 0.00 SCE Gen
MIRLOM_2_CORONA MWD Corona Hydroelectric Recovery Plant Planned 2.85 2.85 SCE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MIRLOM_2_TEMESC MWD Temescal Hydroelectric Recovery Plan Planned 2.85 2.85 SCE Gen
MIRLOM_6_PEAKER Mira Loma Peaker Forced 46.00 0.00 SCE Gen
MIRLOM_7_MWDLKM Lake Mathews Hydroelectric Recovery Plan Planned 5.00 5.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.49 PGAE South
MOJAVW_2_SOLAR Mojave West Forced 20.00 0.00 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Forced 11.00 11.00 SCE Gen
MONLTS_2_MONWD4 Monolith 4 Planned/Forced 4.75 3.05 SCE Gen
MONLTS_2_MONWD5 Monolith 5 Forced 4.04 4.04 SCE Gen
MONLTS_2_MONWD6 Monolith 6 Forced 5.25 5.25 SCE Gen
MONLTS_2_MONWD7 Monolith 7 Forced 4.76 4.76 SCE Gen
MORWD_6_QF Morwind Forced 38.16 0.00 SCE Gen
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Forced 510.00 0.00 PGAE South
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Forced 510.00 0.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 4.58 SDGE Gen
MRGT_6_MEF2 Miramar Energy Facility II Planned 44.00 44.00 SDGE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 5.40 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned 22.20 0.60 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 11.22 SCE Gen
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Planned/Forced 55.00 38.00 PGAE North
NCPA_7_GP1UN1 NCPA GEO PLANT 1 UNIT 1 Forced 38.85 38.85 PGAE Gen
NCPA_7_GP1UN2 NCPA GEO PLANT 1 UNIT 2 Forced 34.00 34.00 PGAE Gen
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Forced 12.00 12.00 PGAE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OAKWD_6_QF Oak Creek Forced 27.87 0.00 SCE Gen
OASIS_6_SOLAR2 Oasis Solar Forced 20.00 1.00 SCE Gen
OASIS_6_SOLAR3 Soccer Center Forced 3.00 0.00 SCE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 3.59 PGAE South
OLDRIV_6_CESDBM Ces Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLDRIV_6_LKVBM1 Lakeview Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLINDA_2_COYCRK MWD Coyote Creek Hydroelectric Recovery Forced 3.13 3.13 SCE Gen
OLSEN_2_UNIT OLSEN POWER PARTNERS Forced 5.80 5.80 PGAE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 0.00 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 0.11 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 1.41 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 3.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Planned 10.62 0.00 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 0.92 SCE Gen
PANSEA_1_PANARO Mesa Wind Project Planned 30.00 21.81 SCE Gen
PARDEB_6_UNITS Pardee Power House Planned/Forced 30.00 30.00 PGAE Gen
PEORIA_1_SOLAR Sonora 1 Forced 1.50 0.00 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 210.00 210.00 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 111.30 1.40 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.70 0.32 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 0.00 SDGE Gen
PIT1_7_UNIT 1 PIT PH 1 UNIT 1 Planned 32.00 32.00 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Planned 54.60 54.60 PGAE North
PLACVL_1_CHILIB Chili Bar Hydro Planned 8.40 8.40 PGAE Gen
PLAINV_6_BSOLAR Western Antelope Blue Sky Ranch A Forced 20.00 1.00 SCE Gen
PMDLET_6_SOLAR1 SEPV Palmdale East, LLC Forced 10.00 2.00 SCE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 197.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 4.91 PGAE Gen
PNOCHE_1_PL1X2 Panoche Peaker Forced 49.97 4.97 PGAE South
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 4.01 PGAE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Planned 69.00 69.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Planned 68.50 68.50 PGAE North
POTTER_6_UNITS Potter Valley Forced 10.10 10.10 PGAE North
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Forced 635.00 2.00 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 239.60 SCE Gen
RAWHIDE_6_UNIT Chevron Wind Forced 16.50 1.50 PACE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Forced 2.25 2.25 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Forced 495.90 127.47 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 1.00 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.70 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 4.00 SCE Gen
RTREE_2_WIND2 Rising Tree 2 Forced 19.80 3.30 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 620.50 0.00 PGAE South
RVRVEW_1_UNITA1 Riverview Energy Center (GP Antioch) Planned 47.60 0.00 PGAE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Planned 48.35 48.35 SCE Gen
SANDLT_2_SUNITS Mojave Solar Forced 275.00 27.00 SCE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 92.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 2.42 SCE Gen
SAUGUS_6_MWDFTH Foothill Hydroelectric Recovery Plant Forced 9.10 6.10 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 555.00 0.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 555.00 0.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 4.75 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 1.03 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 106.01 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 336.04 7.51 PGAE Gen
SEGS_1_SR2SL2 Sunray 2 Forced 20.00 2.20 SCE Gen
SENTNL_2_CTG1 Sentinel Unit 1 Forced 103.76 103.76 SCE Gen
SENTNL_2_CTG2 Sentinel Unit 2 Forced 95.34 3.34 SCE Gen
SENTNL_2_CTG4 Sentinel Unit 4 Forced 102.47 10.47 SCE Gen
SENTNL_2_CTG5 Sentinel Unit 5 Forced 103.81 11.81 SCE Gen
SENTNL_2_CTG6 Sentinel Unit 6 Forced 100.99 8.99 SCE Gen
SENTNL_2_CTG7 Sentinel Unit 7 Forced 97.06 97.06 SCE Gen
SENTNL_2_CTG8 Sentinel Unit 8 Forced 101.80 101.80 SCE Gen
SGREGY_6_SANGER Algonquin Power Sanger 2 Forced 48.30 0.00 PGAE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 3.13 PGAE Gen
SLST13_2_SOLAR1 Quinto Solar PV Project Forced 107.60 5.60 PGAE Gen
SLSTR1_2_SOLAR1 Solar Star 1 Forced 310.00 0.00 SCE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 188.43 PGAE Gen
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 53.00 PGAE Gen
SMYRNA_1_DL1SR1 Delano Land 1 Forced 1.00 0.00 PGAE Gen
SNCLRA_2_UNIT1 New Indy Oxnard Planned 27.80 16.80 SCE Gen
SPOINT_2_MEADDYN SPOINT_2_MEADDYN Forced 325.00 0.00 SCE Gen
SPOINT_2_PARKERDYN Southpoint Energy Center Planned 200.00 0.00 SCE Gen
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STNRES_1_UNIT Covanta Stanislaus Forced 19.90 11.40 PGAE North
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 9.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 9.00 PGAE South
SUNSLR_1_SSVSR1 Sunshine Valley Solar 1 Forced 100.00 0.00 VEA Gen
SUNSPT_2_WNASR1 Windhub Solar A Forced 20.00 0.00 SCE Gen
SUNSTR_5_SS1SCEDYN Sunstream Solar 1 Forced 150.00 50.00 SCE Gen
SUTTER_2_TESLADYN Sutter Energy Center Dynamic 2 Forced 270.00 0.00 PGAE Gen
SUTTER_2_WASNDYN Sutter Energy Center Dynamic Forced 270.00 0.00 PGAE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 4.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 80.00 0.00 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 80.00 2.00 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 80.00 2.50 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 80.00 4.00 SCE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Forced 14.89 14.89 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Forced 21.24 21.24 SCE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 0.00 SCE Gen
TORTLA_1_SOLAR Longboat Solar Forced 20.00 0.00 SCE Gen
TULARE_2_TULBM1 Tulare BioMAT Fuel Cell Forced 2.80 2.80 SCE Gen
TULEWD_1_TULWD1 Tule Wind Planned/Forced 127.60 127.60 SDGE Gen
TWISSL_6_SOLAR Nickel 1 ("NLH1") Forced 1.50 0.00 PGAE Gen
TX-ELK_6_SOLAR1 Castor Forced 1.50 1.50 PGAE Gen
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 8.00 PGAE Gen
UNOCAL_1_UNITS TOSCO (RODEO PLANT) Forced 49.85 0.00 PGAE South
USWND2_1_WIND1 Golden Hills A Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 1.79 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 0.00 PGAE Gen
USWNDR_2_LABWD1 LaBrisa Wind Project Forced 9.00 1.50 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 1.85 PGAE North
VACADX_1_SOLAR Vaca-Dixon Solar Station Forced 2.50 0.50 PGAE North
VACADX_1_UNITA1 CalPeak Power Vaca Dixon Unit 1 Forced 50.61 2.61 PGAE Gen
VALLEY_5_REDMTN MWD Red Mountain Hydroelectric Recovery Planned 5.90 2.90 SCE Gen
VEGA_6_SOLAR1 Vega Solar Forced 20.00 20.00 PGAE Gen
VENWD_1_WIND1 Windpark Unlimited 1 Forced 9.43 9.43 SCE Gen
VENWD_1_WIND2 Windpark Unlimited 2 Forced 16.05 16.05 SCE Gen
VENWD_1_WIND3 Painted Hills Windpark Forced 19.04 19.04 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 18.80 SCE Gen
VICTOR_1_CREST Victor Aggregate Solar Resources Forced 24.50 0.00 SCE Gen
VICTOR_1_EXSLRA Expressway Solar A Forced 2.00 0.00 SCE Gen
VICTOR_1_EXSLRB Expressway Solar B Forced 2.00 0.00 SCE Gen
VICTOR_1_VDRYFA Victor Dry Farm Ranch A Forced 5.00 0.00 SCE Gen
VICTOR_1_VDRYFB Victor Dry Farm Ranch B Forced 5.00 0.00 SCE Gen
VILLPK_2_VALLYV MWD Valley View Hydroelectric Recovery P Forced 4.10 4.10 SCE Gen
VILLPK_6_MWDYOR Yorba Linda Hydroelectric Recovery Plant Planned 5.10 5.10 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Planned/Forced 59.00 0.00 SCE Gen
VOLTA_7_QFUNTS VOLTA_7_QFUNTS Forced 1.30 1.30 PGAE North
VSTAES_6_VESBT1 Vista Energy Storage Forced 40.00 2.00 SDGE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SCE Gen
WARNE_2_UNIT WARNE HYDRO AGGREGATE Planned 76.00 76.00 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 21.50 SCE Gen
WISE_1_UNIT 2 WISE HYDRO UNIT 2 Forced 3.20 3.20 PGAE North
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 1.00 PGAE Gen
WNDSTR_2_WIND Windstar Planned 120.00 4.00 SCE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 1.50 PGAE Gen
WRGTSR_2_WSFSR1 Wright Solar Freeman Forced 200.00 200.00 PGAE Gen
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
SDG1_1_PDRP18 PDR-E SDG1 3 Forced 0.50 0.50
TX-ELK_6_ECKSR2 Eagle Creek Forced 3.00 0.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
APS Gen 0 1 35.00 0.00
PACE Gen 0 1 1.50 0.00
PGAE Gen 22 130 1734.81 1709.65
PGAE North 14 22 86.47 732.05
PGAE South 5 38 96.47 617.40
SCE Gen 40 163 1063.56 1314.06
SDGE Gen 10 17 53.15 325.20
VEA Gen 0 1 0.00 0.00
0 4 0.00 0.50
Total 91 377 3070.96 4698.86


Report Generated on:
12/19/2019 08:30:00 (PPT)
Filtered Parameters:
Date = 12/20/2019
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.