Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
7STDRD_1_SOLAR1 Shafter Solar Forced 20.00 0.00 PGAE South
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 9.00 PGAE Gen
ALAMIT_2_PL1X3 Alamitos Energy Center Unit 7 Forced 674.70 0.00 SCE Gen
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Planned 332.18 332.18 SCE Gen
ALAMIT_7_UNIT 5 ALAMITOS GEN STA. UNIT 5 Planned 497.97 497.97 SCE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 25.00 2.00 PGAE South
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Planned 25.00 25.00 PGAE South
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 6.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 6.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 6.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 9.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.35 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 6.90 SCE Gen
ANAHM_7_CT ANAHEIM COMBUSTION TURBINE Forced 42.81 42.81 SCE Gen
ANZA_6_SOLAR1 Seville Solar One Planned 20.00 0.00 SDGE Gen
ARBWD_6_QF Wind Resource II Forced 19.95 1.35 SCE Gen
ARCOGN_2_UNITS WATSON COGENERATION Forced 416.60 0.00 SCE Gen
ASTORA_2_SOLAR1 Astoria 1 Forced 100.00 0.00 SCE Gen
BASICE_2_UNITS King City Cogen Planned 120.00 0.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 6.08 PGAE South
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 4.21 PGAE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Planned 119.00 119.00 PGAE Gen
BGSKYN_2_AS2SR1 Antelope Solar 2 Forced 105.00 0.00 SCE Gen
BGSKYN_2_ASPSR2 Antelope Solar 2 San Pablo Forced 100.00 0.00 SCE Gen
BGSKYN_2_BS3SR3 Big Sky Solar 3 Forced 20.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 669.00 SCE Gen
BIGSKY_2_BSKSR6 Big Sky Solar 6 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR7 Big Sky Solar 7 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR8 Big Sky Solar 8 Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BIOMAS_1_UNIT 1 WOODLAND BIOMASS Planned 25.50 25.50 PGAE North
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned/Forced 13.40 9.40 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned 15.80 13.80 SCE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Forced 85.00 2.00 PGAE North
BLACK_7_UNIT 2 JAMES B. BLACK 2 Forced 84.10 1.10 PGAE North
BLCKBT_2_STONEY BLACK BUTTE HYDRO Forced 6.20 6.20 PGAE Gen
BLULKE_6_BLUELK Blue Lake Power Forced 12.00 12.00 PGAE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 0.00 SDGE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 10.80 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 6.90 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 2.30 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 3.00 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 4.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 8.20 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 9.00 SCE Gen
BUCKCK_2_HYDRO Lassen Station Hydro Forced 0.99 0.99 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 1.50 SCE Gen
CABZON_1_WINDA1 Cabazon Wind Project Forced 41.00 0.00 SCE Gen
CAMCHE_1_PL1X3 CAMANCHE UNITS 1, 2 & 3 AGGREGATE Forced 9.99 7.99 PGAE Gen
CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE Forced 49.00 49.00 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Forced 24.00 24.00 PGAE North
CARLS1_2_CARCT1 Carlsbad 1 Planned 422.00 0.00 SDGE Gen
CARLS2_1_CARCT1 Carlsbad 2 Planned 105.50 0.00 SDGE Gen
CAVLSR_2_BSOLAR California Valley Solar Ranch-Phase B Forced 40.00 0.00 PGAE Gen
CENTER_2_RHONDO MWD Rio Hondo Hydroelectric Recovery Pla Forced 1.91 1.91 SCE Gen
CENTER_6_PEAKER Center Peaker Planned 47.11 47.11 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 6.67 PGAE Gen
CHILLS_7_UNITA1 Sycamore Energy 2 Planned 2.25 2.25 SDGE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
CHWCHL_1_BIOMAS Chow II Biomass to Energy Forced 10.80 10.80 PGAE South
CLOVDL_1_SOLAR Cloverdale Solar I Forced 1.50 0.00 PGAE Gen
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00 PGAE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 0.00 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 0.00 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 5.09 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 0.00 PGAE South
COCOSB_6_SOLAR Oakley Solar Project Forced 1.50 0.00 PGAE Gen
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned 176.72 176.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Planned/Forced 175.67 23.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 9.79 PGAE North
CONTRL_1_CASAD3 Mammoth G3 Forced 14.00 0.00 SCE Gen
CONTRL_1_LUNDY LUNDY Planned 3.00 2.70 SCE Gen
CONTRL_1_OXBOW Dixie Valley Geo Forced 60.00 2.50 SCE Gen
CONTRL_1_POOLE POOLE HYDRO PLANT 1 Planned 10.90 10.80 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Planned 11.94 4.94 SCE Gen
CORCAN_1_SOLAR1 CID Solar Forced 20.00 10.00 PGAE Gen
COVERD_2_MCKHY1 Montgomery Creek Hydro Forced 2.80 1.30 PGAE Gen
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Forced 3.20 3.20 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20 PGAE Gen
CROKET_7_UNIT CROCKETT COGEN Planned/Forced 240.00 240.00 PGAE North
CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN Forced 7.00 0.00 PGAE South
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 0.53 PGAE South
CUMBIA_1_SOLAR Columbia Solar Energy II Forced 19.00 0.00 PGAE Gen
CUMMNG_6_SUNCT1 SunSelect 1 Forced 4.00 4.00 SCE Gen
DAIRLD_1_MD2BM1 Madera Digester Genset 2 Forced 0.80 0.00 PGAE Gen
DELAMO_2_SOLRC1 Golden Springs Building C1 Forced 1.16 0.00 SCE Gen
DELAMO_2_SOLRD Golden Solar Building D Forced 1.25 0.00 SCE Gen
DELSUR_6_CREST Delsur Aggregate Solar Resources Forced 10.00 0.00 SCE Gen
DELSUR_6_SOLAR4 Radiance Solar 4 Forced 1.50 0.00 SCE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 0.00 PGAE Gen
DMDVLY_1_UNITS DIAMOND VALLEY LAKE PUMP-GEN PLANT Forced 21.00 21.00 SCE Gen
DONNLS_7_UNIT Donnells Hydro Forced 72.00 3.50 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 2.53 PGAE South
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Forced 125.00 0.00 SCE Gen
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 23.40 SCE Gen
DSABLA_7_UNIT De Sabla Hydro Forced 18.50 18.50 PGAE North
DSFLWR_2_WS2SR1 Willow Springs 2 Forced 100.00 0.00 SCE Gen
DSRTSL_2_SOLAR1 Desert Stateline Forced 296.19 3.79 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 54.80 PGAE South
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Forced 235.00 75.00 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Planned 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 45.00 APS Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 45.00 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Planned 7.50 0.00 SDGE Gen
ELCAJN_6_LM6K El Cajon Energy Center Planned 48.10 48.10 SDGE Gen
ELDORO_7_UNIT 1 El Dorado Unit 1 Forced 11.00 0.00 PGAE North
ELDORO_7_UNIT 2 El Dorado Unit 2 Forced 11.00 11.00 PGAE North
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Forced 93.00 60.00 PGAE North
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 16.70 PGAE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Planned/Forced 263.00 263.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Planned 263.68 263.68 SCE Gen
ENERSJ_2_WIND ESJ Wind Energy Forced 155.10 3.30 SDGE Gen
ENWIND_2_WIND1 Cameron Ridge Forced 47.10 3.10 SCE Gen
ESQUON_6_LNDFIL Neal Road Landfill Generating Facility Forced 2.10 1.00 PGAE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned/Forced 2.56 2.56 SCE Gen
ETIWND_2_UNIT1 ETIWND_2_UNIT1 Planned 33.60 32.60 SCE Gen
ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO Forced 24.00 24.00 SCE Gen
EXCLSG_1_SOLAR Excelsior Solar Planned 60.00 2.50 PGAE Gen
FAIRHV_6_UNIT FAIRHAVEN POWER CO. Forced 18.75 18.75 PGAE North
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 0.00 PGAE Gen
FMEADO_7_UNIT FRENCH MEADOWS HYDRO Forced 16.00 0.00 PGAE North
FORBST_7_UNIT 1 FORBESTOWN HYDRO Planned 37.50 37.50 PGAE North
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 0.00 PGAE Gen
FROGTN_1_UTICAM Murphys Powerhouse Planned/Forced 3.60 3.60 PGAE Gen
GARNET_1_SOLAR2 Garnet Solar Power Generation Station 1 Forced 4.00 0.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 8.25 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 3.00 SCE Gen
GARNET_2_DIFWD1 Difwind Forced 7.88 7.88 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Forced 11.70 1.50 SCE Gen
GARNET_2_WIND5 Eastwind Forced 3.00 0.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATES_2_SOLAR Gates Solar Station Forced 20.00 2.00 PGAE South
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 585.00 36.18 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 0.00 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 12.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 42.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 13.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 35.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 0.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 24.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 24.00 PGAE Gen
GIFENS_6_BUGSL1 Burford Giffen Planned 20.00 0.00 PGAE Gen
GILRPP_1_PL1X2 GILROY ENERGY CENTER UNITS 1&2 AGGREGATE Forced 95.20 0.00 PGAE South
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Planned 22.07 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIDLY_6_SOLAR GRIDLEY MAIN TWO Forced 2.50 0.00 PGAE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Forced 20.00 20.00 PGAE North
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Forced 3.04 1.03 PGAE South
GUERNS_6_HD3BM3 Hanford Digester Genset 3 Forced 1.00 0.00 PGAE Gen
GUERNS_6_VH2BM1 Hanford Digester Genset 2 Forced 1.00 0.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Forced 98.46 1.32 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 0.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 0.00 PGAE Gen
HATLOS_6_LSCRK Lost Creek 1 & 2 Hydro Conversion Forced 1.70 0.64 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.00 PGAE Gen
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Forced 407.00 0.00 PGAE South
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Planned/Forced 407.00 407.00 PGAE South
HENRTA_6_SOLAR1 Lemoore 1 Forced 1.50 0.00 PGAE Gen
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.74 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 1.28 PGAE South
HENRTS_1_SOLAR Henrietta Solar Project Forced 100.00 2.00 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 40.00 SCE Gen
HINSON_6_CARBGN BP WILMINGTON CALCINER Planned 30.00 30.00 SCE Gen
HINSON_6_LBECH3 Long Beach Unit 3 Forced 65.00 65.00 SCE Gen
HINSON_6_SERRGN Southeast Resource Recovery Forced 34.00 17.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Forced 4.90 4.90 PGAE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Planned 65.08 16.27 PGAE North
HURON_6_SOLAR Huron Solar Station Forced 20.00 2.00 PGAE South
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 117.10 PGAE Gen
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 376.20 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 113.00 PGAE Gen
INTMNT_3_ANAHEIM Intermountain Power Project Planned/Forced 236.00 119.00 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 136.00 69.00 SCE Gen
IVANPA_1_UNIT1 Ivanpah 1 Forced 126.00 0.00 SCE Gen
IVANPA_1_UNIT2 Ivanpah 2 Forced 133.00 5.00 SCE Gen
IVANPA_1_UNIT3 Ivanpah 3 Forced 133.00 13.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 4.80 SCE Gen
KEKAWK_6_UNIT STS HYDROPOWER LTD. (KEKAWAKA) Forced 5.50 5.50 PGAE Gen
KELSO_2_UNITS Mariposa Energy Forced 198.03 0.03 PGAE Gen
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 2.70 PGAE South
KERNRG_1_UNITS South Belridge Cogen Facility Planned 55.20 15.20 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Planned/Forced 25.60 7.60 SCE Gen
KILARC_2_UNIT 1 KILARC HYDRO Forced 1.50 1.50 PGAE North
KINGCO_1_KINGBR Kingsburg Cogen Forced 34.50 0.00 PGAE South
KNGCTY_6_UNITA1 King City Energy Center, Unit 1 Planned 44.60 0.00 PGAE Gen
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LACIEN_2_VENICE MWD Venice Hydroelectric Recovery Plant Forced 9.95 9.95 SCE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 267.00 7.00 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 266.00 8.00 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 266.00 7.00 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Planned 253.29 253.29 PGAE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 12.00 SDGE Gen
LASSEN_6_UNITS Honey Lake Power Forced 30.00 6.00 PGAE North
LEBECS_2_UNITS Pastoria Energy Facility Planned/Forced 799.47 799.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 6.84 PGAE South
LIVEOK_6_SOLAR Harris Forced 1.25 0.00 PGAE Gen
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Planned 49.70 49.70 PGAE South
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 580.00 0.00 PGAE Gen
LNCSTR_6_CREST Lanacaster Aggregate Solar Resources Forced 5.50 0.00 SCE Gen
LODI25_2_UNIT 1 LODI GAS TURBINE Forced 25.00 2.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 302.58 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 0.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 7.50 SCE Gen
MCARTH_6_FRIVRB Fall River Mills Project B Forced 1.50 1.50 PGAE Gen
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 14.16 PGAE Gen
MIDWD_6_WNDLND Windland Refresh 1 Forced 7.45 0.00 SCE Gen
MIRLOM_2_CORONA MWD Corona Hydroelectric Recovery Plant Forced 2.85 2.85 SCE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MIRLOM_2_TEMESC MWD Temescal Hydroelectric Recovery Plan Planned 2.85 2.85 SCE Gen
MIRLOM_7_MWDLKM Lake Mathews Hydroelectric Recovery Plan Forced 5.00 5.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.49 PGAE South
MOJAVW_2_SOLAR Mojave West Forced 20.00 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 1.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Forced 11.00 11.00 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 9.58 SDGE Gen
MSHGTS_6_MMARLF MIRAMAR LANDFILL Planned 5.00 2.50 SDGE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Forced 46.64 0.00 PGAE South
MURRAY_6_UNIT Grossmont Hospital Planned 4.12 4.12 SDGE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Forced 12.00 12.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Planned/Forced 55.00 45.50 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 2.00 APS Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 2.00 SDGE Gen
NZWIND_6_CALWND Wind Resource I Forced 9.00 0.00 SCE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OASIS_6_CREST CREST Contracts Forced 13.50 0.00 SCE Gen
OASIS_6_SOLAR3 Soccer Center Forced 3.00 0.00 SCE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 0.60 PGAE South
OLDRIV_6_CESDBM Ces Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLDRIV_6_LKVBM1 Lakeview Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLINDA_2_COYCRK MWD Coyote Creek Hydroelectric Recovery Forced 3.13 3.13 SCE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Planned 78.00 78.00 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Planned 78.11 78.11 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Planned 81.41 81.41 SCE Gen
OMAR_2_UNIT 4 KERN RIVER COGENERATION CO. UNIT 4 Planned 81.44 81.44 SCE Gen
ORMOND_7_UNIT 1 ORMOND BEACH GEN STA. UNIT 1 Planned 741.27 741.27 SCE Gen
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Planned 750.00 0.00 SCE Gen
OROLOM_1_SOLAR2 Oro Loma Solar 2 Forced 10.00 0.00 PGAE South
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 4.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 1.12 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 0.92 SCE Gen
PADUA_6_MWDSDM San Dimas Hydroelectric Recovery Plant Forced 9.90 9.90 SCE Gen
PALALT_7_COBUG Cooperatively Owned Back Up Generator Forced 4.50 3.29 PGAE Gen
PANSEA_1_PANARO Mesa Wind Project Planned/Forced 30.00 21.81 SCE Gen
PARDEB_6_UNITS Pardee Power House Planned/Forced 30.00 30.00 PGAE Gen
PEORIA_1_SOLAR Sonora 1 Forced 1.50 0.00 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 198.51 66.51 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 111.30 1.40 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.70 0.00 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 0.00 SDGE Gen
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Planned 54.60 54.60 PGAE North
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 299.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.00 PGAE Gen
PNOCHE_1_PL1X2 Panoche Peaker Forced 49.97 4.97 PGAE South
POTTER_6_UNITS Potter Valley Forced 10.10 4.80 PGAE North
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Forced 635.00 0.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 359.60 322.60 SCE Gen
RATSKE_2_NROSR1 North Rosamond Solar Forced 150.00 0.00 SCE Gen
RDWAY_1_CREST CREST Contracts Forced 6.50 0.00 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 4.00 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Forced 2.25 2.25 SCE Gen
REDMAN_2_SOLAR Lancaster East Avenue F Forced 3.75 0.00 SCE Gen
REDMAN_6_AVSSR1 Antelope Valley Solar Forced 3.00 0.00 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Planned 495.90 495.90 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 1.00 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.70 PGAE Gen
RIOBRV_6_UNIT 1 RIO BRAVO HYDRO Forced 14.00 14.00 PGAE Gen
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Forced 140.00 0.00 SCE Gen
RSMSLR_6_SOLAR1 Rosamond One Planned 20.00 0.00 SCE Gen
RTREE_2_WIND2 Rising Tree 2 Forced 19.80 0.00 SCE Gen
RTREE_2_WIND3 Rising Tree 3 Forced 99.00 0.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 620.50 0.40 PGAE South
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Planned 48.50 0.00 SCE Gen
SALIRV_2_UNIT Salinas River Cogeneration Planned 39.00 0.00 PGAE South
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Planned/Forced 46.00 46.00 PGAE North
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 31.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Forced 31.00 1.80 SCE Gen
SAUGUS_7_CHIQCN Chiquita Canyon Landfill Fac Planned/Forced 8.00 0.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 5.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 1.83 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 69.01 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 336.04 14.25 PGAE Gen
SCHNDR_1_WSTSDE Westside Solar Station Forced 15.00 2.00 PGAE Gen
SENTNL_2_CTG1 Sentinel Unit 1 Forced 103.76 0.00 SCE Gen
SENTNL_2_CTG2 Sentinel Unit 2 Forced 95.34 95.34 SCE Gen
SENTNL_2_CTG6 Sentinel Unit 6 Planned/Forced 100.99 8.99 SCE Gen
SHELRF_1_UNITS SHELL OIL REFINERY AGGREGATE Planned 100.00 40.00 PGAE Gen
SHUTLE_6_CREST CREST Contracts Forced 4.00 0.00 SCE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 2.73 PGAE Gen
SLST13_2_SOLAR1 Quinto Solar PV Project Forced 107.60 2.30 PGAE Gen
SLSTR1_2_SOLAR1 Solar Star 1 Forced 310.00 0.00 SCE Gen
SLSTR2_2_SOLAR2 Solar Star 2 Forced 276.00 0.00 SCE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 174.43 PGAE Gen
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 0.00 PGAE Gen
SNCLRA_2_UNIT Channel Islands Power Forced 27.50 0.00 SCE Gen
SNCLRA_2_UNIT1 New Indy Oxnard Planned 27.80 16.80 SCE Gen
SNCLRA_6_OXGEN E.F. OXNARD INCORPORATED Planned 48.50 48.50 SCE Gen
SNDBAR_7_UNIT 1 SANDBAR Forced 16.20 16.20 PGAE North
SPOINT_2_MEADDYN SPOINT_2_MEADDYN Forced 325.00 325.00 SCE Gen
SPOINT_2_PARKERDYN Southpoint Energy Center Forced 200.00 200.00 SCE Gen
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STOILS_1_UNITS Chevron Richmond Refinery Forced 56.20 0.00 PGAE Gen
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 11.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 12.00 PGAE South
SUNSLR_1_SSVSR1 Sunshine Valley Solar 1 Forced 100.00 0.00 VEA Gen
SUTTER_2_TESLADYN Sutter Energy Center Dynamic 2 Forced 270.00 270.00 PGAE Gen
SUTTER_2_WASNDYN Sutter Energy Center Dynamic Forced 270.00 270.00 PGAE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 4.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Planned/Forced 86.00 86.00 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Planned/Forced 78.00 78.00 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Planned/Forced 78.00 78.00 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Planned/Forced 78.00 78.00 SCE Gen
S_RITA_6_SOLAR1 Sun Harvest Solar Forced 1.50 0.00 PGAE Gen
TANHIL_6_SOLART Berry Cogen 18 Forced 17.00 0.00 PGAE South
TEHAPI_2_WIND1 Wind Wall Monolith 1 Forced 14.89 14.89 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Forced 21.24 21.24 SCE Gen
TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE Planned 62.00 62.00 PGAE North
TOADTW_6_UNIT TOAD TOWN Forced 1.50 1.50 PGAE North
TRNQLT_2_SOLAR Tranquillity Forced 200.00 33.00 PGAE Gen
TRNSWD_1_QF FPL Energy C Wind Planned/Forced 38.97 38.97 SCE Gen
TWISSL_6_SOLAR1 Coronal Lost Hills Forced 20.00 0.00 PGAE Gen
UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT Forced 19.00 8.00 PGAE Gen
UNVRSY_1_UNIT 1 Berry Cogen 38 - Unit 1 Forced 38.00 0.00 PGAE Gen
USWND2_1_WIND1 Golden Hills A Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 2.30 PGAE Gen
USWNDR_2_LABWD1 LaBrisa Wind Project Forced 9.00 0.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 1.80 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 1.85 PGAE North
VALLEY_5_PERRIS MWD Perris Hydroelectric Recovery Plant Forced 7.94 7.94 SCE Gen
VALLEY_5_REDMTN MWD Red Mountain Hydroelectric Recovery Planned 5.90 2.90 SCE Gen
VENWD_1_WIND1 Windpark Unlimited 1 Forced 9.43 9.43 SCE Gen
VENWD_1_WIND2 Windpark Unlimited 2 Forced 16.05 16.05 SCE Gen
VENWD_1_WIND3 Painted Hills Windpark Forced 19.04 19.04 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Forced 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 22.30 SCE Gen
VESTAL_2_WELLHD Wellhead Power Delano Forced 49.00 0.00 SCE Gen
VICTOR_1_CREST Victor Aggregate Solar Resources Forced 24.50 0.00 SCE Gen
VICTOR_1_LVSLR1 Lone Valley Solar Park 1 Forced 10.00 0.00 SCE Gen
VICTOR_1_LVSLR2 Lone Valley Solar Park 2 Forced 20.00 0.00 SCE Gen
VILLPK_2_VALLYV MWD Valley View Hydroelectric Recovery P Forced 4.10 4.10 SCE Gen
VINCNT_2_WESTWD Oasis Power Plant Forced 59.00 0.00 SCE Gen
VOLTA_2_UNIT 1 VOLTA HYDRO UNIT 1 Planned 9.10 9.10 PGAE North
VOLTA_2_UNIT 2 Volta Hydro Unit 2 Planned 1.00 1.00 PGAE North
VOLTA_7_QFUNTS VOLTA_7_QFUNTS Forced 1.30 1.17 PGAE North
VOYAGR_2_VOYWD4 Voyager Wind 4 Forced 21.60 0.00 SCE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SCE Gen
WDLEAF_7_UNIT 1 WOODLEAF HYDRO Forced 60.00 20.00 PGAE North
WFRESN_1_SOLAR Joya Del Sol Forced 1.50 0.00 PGAE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 11.50 SCE Gen
WISE_1_UNIT 2 WISE HYDRO UNIT 2 Forced 3.20 3.20 PGAE North
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00 PGAE Gen
WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS Forced 2.50 1.50 PGAE Gen
WSTWND_2_M89WD1 Mojave 89 Forced 82.65 0.00 SCE Gen
YUBACT_6_UNITA1 Yuba City Energy Center (Calpine) Planned 47.60 47.60 PGAE North
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
LOTUS_6_LSFSR1 Lotus Solar Farm Forced 50.00 50.00
MAGNLA_6_CERRITOS Magnolia Power Plant Cerritos Forced 10.00 0.00
MAGNLA_6_COLTON Magnolia Power Project Forced 10.00 0.00
MIRLOM_2_CREST Temescal Canyon RV Forced 1.50 0.00
RNDSBG_1_HZASR1 Hazel A Forced 2.99 0.00


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
APS Gen 0 2 47.00 0.00
PGAE Gen 21 111 1213.25 1373.78
PGAE North 17 34 197.10 911.32
PGAE South 5 45 169.08 534.60
SCE Gen 59 150 1740.18 5798.41
SDGE Gen 8 9 35.46 54.47
VEA Gen 0 1 0.00 0.00
0 5 0.00 50.00
Total 110 357 3402.07 8722.58


Report Generated on:
03/23/2020 08:30:00 (PPT)
Filtered Parameters:
Date = 03/24/2020
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.