Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 10.00 PGAE Gen
ALAMIT_2_PL1X3 Alamitos Energy Center Unit 7 Forced 674.70 8.70 SCE Gen
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Forced 321.40 6.40 SCE Gen
ALAMIT_7_UNIT 4 ALAMITOS GEN STA. UNIT 4 Planned/Forced 335.67 210.67 SCE Gen
ALAMIT_7_UNIT 5 ALAMITOS GEN STA. UNIT 5 Forced 480.00 7.00 SCE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 25.00 4.00 PGAE South
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Forced 25.00 4.00 PGAE South
ALPSLR_1_NTHSLR Alpaugh North, LLC Forced 20.00 10.00 PGAE Gen
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 6.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 0.00 SCE Gen
ALTA3A_2_CPCE8 Alta Wind 8 Forced 150.00 6.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 90.00 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 138.00 6.90 SCE Gen
ANZA_6_SOLAR1 Seville Solar One Forced 20.00 0.00 SDGE Gen
ASTORA_2_SOLAR1 Astoria 1 Planned 100.00 0.00 SCE Gen
ASTORA_2_SOLAR2 Astoria 2 Planned 75.00 0.00 SCE Gen
AVENAL_6_AVPARK Avenal Park Solar Project Forced 6.00 0.00 PGAE South
BASICE_2_UNITS King City Cogen Forced 120.00 1.00 PGAE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 428.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 6.08 PGAE South
BEARDS_7_UNIT 1 Beardsley Hydro Planned 11.50 11.50 PGAE Gen
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 5.21 PGAE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 74.63 PGAE Gen
BGSKYN_2_AS2SR1 Antelope Solar 2 Forced 105.00 0.00 SCE Gen
BGSKYN_2_ASPSR2 Antelope Solar 2 San Pablo Forced 100.00 0.00 SCE Gen
BGSKYN_2_BS3SR3 Big Sky Solar 3 Forced 20.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Forced 820.00 387.00 SCE Gen
BIGSKY_2_BSKSR6 Big Sky Solar 6 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR7 Big Sky Solar 7 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR8 Big Sky Solar 8 Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BIOMAS_1_UNIT 1 WOODLAND BIOMASS Forced 25.50 25.50 PGAE North
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 5.10 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Forced 15.80 4.80 SCE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Forced 85.00 0.00 PGAE North
BLACK_7_UNIT 2 JAMES B. BLACK 2 Forced 84.10 0.00 PGAE North
BLAST_1_WIND Mountain View IV Wind Planned 49.00 2.00 SCE Gen
BLULKE_6_BLUELK Blue Lake Power Planned 12.00 12.00 PGAE Gen
BLYTHE_1_SOLAR1 Blythe Solar 1 Project Forced 21.00 3.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Planned 51.25 0.00 SDGE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 32.40 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.30 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 1.50 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 0.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 0.00 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 1.60 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 3.00 SCE Gen
BUCKCK_7_OAKFLT Oak Flat Forced 1.30 1.30 PGAE Gen
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Planned/Forced 57.25 57.25 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 3.00 SCE Gen
CALPIN_1_AGNEW Agnews Power Plant Forced 28.56 0.80 PGAE Gen
CANTUA_1_SOLAR Cantua Solar Station Forced 20.00 0.00 PGAE South
CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE Forced 49.00 49.00 PGAE North
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Forced 120.00 23.00 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned/Forced 24.00 24.00 PGAE North
CARLS1_2_CARCT1 Carlsbad 1 Planned/Forced 422.00 1.55 SDGE Gen
CARLS2_1_CARCT1 Carlsbad 2 Planned/Forced 105.50 1.58 SDGE Gen
CATLNA_2_SOLAR Catalina Solar - Phases 1 and 2 Forced 110.00 0.00 SCE Gen
CATLNA_2_SOLAR2 Catalina Solar 2 Forced 18.00 0.00 SCE Gen
CAVLSR_2_BSOLAR California Valley Solar Ranch-Phase B Forced 40.00 0.00 PGAE Gen
CAVLSR_2_RSOLAR California Valley Solar Ranch-Phase A Forced 210.00 0.00 PGAE Gen
CENTER_2_RHONDO MWD Rio Hondo Hydroelectric Recovery Pla Forced 1.91 1.91 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 48.67 PGAE Gen
CHICPK_7_UNIT 1 Chicago Park Powerhouse Forced 42.00 28.00 PGAE North
CHINO_2_SASOLR SS San Antonio West LLC Forced 1.50 0.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Planned 1.90 1.90 SCE Gen
CLOVDL_1_SOLAR Cloverdale Solar I Forced 1.50 0.00 PGAE Gen
CLOVER_2_UNIT Clover Creek Forced 0.99 0.99 PGAE Gen
CLRKRD_6_LIMESD Lime Saddle Hydro Forced 2.00 2.00 PGAE Gen
CNTRVL_6_UNIT Centerville Forced 6.40 6.40 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 4.77 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 4.05 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 11.10 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 5.05 PGAE South
COCOSB_6_SOLAR Oakley Solar Project Forced 1.50 0.00 PGAE Gen
COLEMN_2_UNIT Coleman Forced 13.00 13.00 PGAE North
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned 176.72 22.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Planned 175.67 21.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Forced 43.00 2.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Forced 641.00 34.45 PGAE North
CONTRL_1_LUNDY LUNDY Forced 3.00 2.60 SCE Gen
CONTRL_1_OXBOW Dixie Valley Geo Forced 60.00 3.50 SCE Gen
CONTRL_1_POOLE POOLE HYDRO PLANT 1 Forced 10.90 10.90 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Forced 11.94 9.94 SCE Gen
CORONS_6_CLRWTR Clearwater Power Plant Forced 28.00 28.00 SCE Gen
COVERD_2_HCKHY1 HATCHET CREEK Forced 6.89 6.89 PGAE Gen
COVERD_2_RCKHY1 ROARING CREEK Forced 2.00 2.00 PGAE Gen
COWCRK_2_UNIT Cow Creek Hydro Planned/Forced 2.00 2.00 PGAE Gen
CPVERD_2_SOLAR Campo Verde Solar Forced 139.00 0.00 SDGE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Forced 70.40 70.40 PGAE North
CRNEVL_6_CRNVA Crane Valley Forced 0.90 0.90 PGAE Gen
CRNEVL_6_SJQN 2 SAN JOAQUIN 2 Forced 3.20 3.20 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20 PGAE Gen
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 2.00 SDGE Gen
CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN Forced 7.00 0.00 PGAE South
CSCGNR_1_UNIT 1 GIANERA PEAKER UNIT 1 Forced 24.75 2.15 PGAE South
CSCGNR_1_UNIT 2 GIANERA PEAKER UNIT 2 Forced 24.75 2.15 PGAE South
CSLR4S_2_SOLAR Csolar IV South Planned 130.00 0.00 SDGE Gen
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 0.13 PGAE South
CUMBIA_1_SOLAR Columbia Solar Energy II Planned/Forced 19.00 0.00 PGAE Gen
CUMMNG_6_SUNCT1 SunSelect 1 Forced 4.00 2.15 SCE Gen
DAIRLD_1_MD2BM1 Madera Digester Genset 2 Forced 0.80 0.00 PGAE Gen
DAVIS_1_SOLAR1 Grasslands 3 Forced 1.00 0.00 PGAE Gen
DAVIS_1_SOLAR2 Grasslands 4 Forced 1.00 0.00 PGAE Gen
DELAMO_2_SOLAR1 Golden Springs Building H Forced 1.50 0.00 SCE Gen
DELAMO_2_SOLAR2 Golden Springs Building M Forced 1.75 0.00 SCE Gen
DELAMO_2_SOLAR3 Golden Springs Building G Forced 1.25 0.00 SCE Gen
DELAMO_2_SOLAR4 Golden Springs Building F Forced 1.30 0.00 SCE Gen
DELAMO_2_SOLAR5 Golden Springs Building L Forced 1.00 0.00 SCE Gen
DELAMO_2_SOLAR6 Freeway Springs Forced 2.00 0.00 SCE Gen
DELAMO_2_SOLRC1 Golden Springs Building C1 Forced 1.16 0.00 SCE Gen
DELAMO_2_SOLRD Golden Solar Building D Forced 1.25 0.00 SCE Gen
DELSUR_6_CREST Delsur Aggregate Solar Resources Forced 10.00 0.00 SCE Gen
DELSUR_6_DRYFRB Dry Farm Ranch B Forced 5.00 0.00 SCE Gen
DELSUR_6_SOLAR1 Summer Solar North Forced 6.50 0.00 SCE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 43.00 PGAE Gen
DISCOV_1_CHEVRN CHEVRON USA (EASTRIDGE) Forced 48.80 26.80 PGAE Gen
DMDVLY_1_UNITS DIAMOND VALLEY LAKE PUMP-GEN PLANT Forced 21.00 21.00 SCE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 3.73 PGAE South
DRACKR_2_DS4SR4 Dracker Solar Unit 4 Forced 125.00 62.50 SCE Gen
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 20.70 SCE Gen
DRUM_7_PL1X2 Drum PH 1 Units 1 & 2 Aggregate Forced 26.00 26.00 PGAE North
DRUM_7_PL3X4 Drum PH 1 Units 3 & 4 Aggregate Forced 28.90 28.90 PGAE North
DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 Forced 50.00 8.00 PGAE North
DSABLA_7_UNIT De Sabla Hydro Forced 18.50 18.50 PGAE North
DSFLWR_2_WS2SR1 Willow Springs 2 Forced 100.00 0.00 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 15.80 PGAE South
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Forced 22.00 3.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned/Forced 235.00 0.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 35.00 APS Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 35.00 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Planned 7.50 0.00 SDGE Gen
ELCAJN_6_LM6K El Cajon Energy Center Forced 48.10 0.00 SDGE Gen
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Planned 4.90 4.90 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 35.70 PGAE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 0.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 0.00 SCE Gen
ENERSJ_2_WIND ESJ Wind Energy Forced 155.10 3.30 SDGE Gen
ESCNDO_6_EB2BT2 Escondido BESS 2 Planned 10.00 1.25 SDGE Gen
ESCNDO_6_PL1X2 MMC Escondido Aggregate Forced 48.71 0.00 SDGE Gen
ESQUON_6_LNDFIL Neal Road Landfill Generating Facility Forced 2.10 0.90 PGAE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned/Forced 2.56 1.36 SCE Gen
ETIWND_2_SOLAR5 Dulles Forced 2.00 0.00 SCE Gen
ETIWND_2_UNIT1 ETIWND_2_UNIT1 Planned 33.60 32.60 SCE Gen
EXCLSG_1_SOLAR Excelsior Solar Forced 60.00 0.00 PGAE Gen
FAIRHV_6_UNIT FAIRHAVEN POWER CO. Forced 18.75 18.75 PGAE North
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 2.30 PGAE Gen
FORBST_7_UNIT 1 FORBESTOWN HYDRO Forced 37.50 37.50 PGAE North
FROGTN_1_UTICAA Angels Powerhouse Forced 1.40 1.40 PGAE Gen
FROGTN_1_UTICAM Murphys Powerhouse Forced 3.60 2.00 PGAE Gen
GARLND_2_GASLR Garland B Forced 180.00 0.00 SCE Gen
GARNET_1_SOLAR North Palm Springs 4A Forced 4.00 4.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 10.50 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 1.50 SCE Gen
GARNET_2_DIFWD1 Difwind Forced 7.88 7.88 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 1.95 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATES_2_SOLAR Gates Solar Station Forced 20.00 2.00 PGAE South
GATES_2_WSOLAR West Gates Solar Station Forced 10.00 0.00 PGAE Gen
GATEWY_2_GESBT1 Gateway Energy Stroage Forced 250.00 250.00 SDGE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 585.00 54.32 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 74.40 0.40 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 15.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 95.00 46.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 12.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 85.00 40.00 PGAE Gen
GEYS17_2_BOTRCK Bottle Rock Geothermal Forced 10.01 10.01 PGAE North
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 60.00 0.00 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 26.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 62.00 26.00 PGAE Gen
GIFFEN_6_SOLAR Giffen Solar Station Forced 10.00 0.00 PGAE South
GIFFEN_6_SOLAR1 Aspiration Solar G Forced 9.00 0.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Forced 120.00 12.00 PGAE South
GLDTWN_6_SOLAR Rio Grande Forced 5.00 0.00 SCE Gen
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Planned 22.07 0.00 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Planned/Forced 20.00 20.00 PGAE North
GRNLF2_1_UNIT GREENLEAF II COGEN Forced 49.20 2.20 PGAE North
GRNVLY_7_SCLAND SANTA CRUZ LANDFILL GENERATING PLANT Forced 3.04 0.00 PGAE South
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GUERNS_6_HD3BM3 Hanford Digester Genset 3 Forced 1.00 0.00 PGAE Gen
GUERNS_6_SOLAR Guernsey Solar Station Forced 20.00 0.00 PGAE Gen
GUERNS_6_VH2BM1 Hanford Digester Genset 2 Forced 1.00 0.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Planned/Forced 98.46 98.46 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 85.00 1.00 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 82.00 3.00 PGAE Gen
HALSEY_6_UNIT HALSEY HYDRO Forced 13.50 7.22 PGAE Gen
HARBGN_7_UNITS HARBOR COGEN COMBINED CYCLE Forced 109.01 29.01 SCE Gen
HATCR2_7_UNIT Hat Creek #2 Planned 8.50 8.50 PGAE North
HATLOS_6_BWDHY1 Bidwell Ditch Forced 2.00 0.50 PGAE Gen
HATLOS_6_LSCRK Lost Creek 1 & 2 Hydro Conversion Planned 1.70 0.72 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.00 PGAE Gen
HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 Forced 407.00 0.00 PGAE South
HENRTA_6_SOLAR1 Lemoore 1 Forced 1.50 1.50 PGAE Gen
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Planned/Forced 49.98 49.98 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Planned/Forced 49.42 49.42 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 64.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Forced 4.90 4.90 PGAE Gen
HNTGBH_7_UNIT 2 HUNTINGTON BEACH GEN STA. UNIT 2 Forced 225.80 225.80 SCE Gen
HOOVER_2_MWDDYN HOOVER Forced 249.00 232.00 SCE Gen
HOOVER_2_VEADYN HOOVER Forced 16.00 6.00 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned/Forced 97.62 0.00 PGAE North
HURON_6_SOLAR Huron Solar Station Forced 20.00 2.00 PGAE South
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned/Forced 933.10 132.10 PGAE Gen
INDVLY_1_UNITS Indian Valley Hydro Planned 3.01 0.00 PGAE North
INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 Planned 376.20 376.20 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned/Forced 405.00 134.00 PGAE Gen
IVANPA_1_UNIT3 Ivanpah 3 Forced 133.00 6.00 SCE Gen
IVSLR2_2_SM2SR1 Silver Ridge Mount Signal 2 Forced 150.00 0.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 8.00 SCE Gen
KANSAS_6_SOLAR RE Kansas South Forced 20.00 0.00 PGAE South
KEKAWK_6_UNIT STS HYDROPOWER LTD. (KEKAWAKA) Planned/Forced 5.50 5.50 PGAE Gen
KELSO_2_UNITS Mariposa Energy Forced 198.03 2.73 PGAE Gen
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Forced 153.90 153.90 PGAE North
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Forced 153.90 153.90 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 5.20 PGAE South
KERNRG_1_UNITS South Belridge Cogen Facility Forced 55.20 0.00 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 0.10 SCE Gen
KILARC_2_UNIT 1 KILARC HYDRO Planned/Forced 1.50 1.50 PGAE North
KNGCTY_6_UNITA1 King City Energy Center, Unit 1 Forced 44.60 0.60 PGAE Gen
KRAMER_2_SEGS 8 KRAMER JUNCTION 8 Forced 80.00 0.00 SCE Gen
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 12.66 PGAE South
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 267.00 13.00 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 266.00 4.00 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 266.00 9.00 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 253.29 5.29 PGAE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 32.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Forced 799.47 16.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 6.84 PGAE South
LITLRK_6_SOLAR1 Lancaster Little Rock C Forced 5.00 0.00 SCE Gen
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 6.70 PGAE South
LMBEPK_2_UNITA3 Goose Haven Energy Center, Unit #1 Forced 47.40 0.00 PGAE Gen
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 580.00 16.00 PGAE Gen
LNCSTR_6_CREST Lanacaster Aggregate Solar Resources Forced 5.50 0.00 SCE Gen
LNCSTR_6_SOLAR2 SEPV Sierra NGR Forced 2.75 1.55 SCE Gen
LOCKFD_1_BEARCK Bear Creek Solar Planned/Forced 1.50 1.50 PGAE Gen
LOCKFD_1_KSOLAR Kettleman Solar Forced 1.00 0.00 PGAE South
LODI25_2_UNIT 1 LODI GAS TURBINE Forced 25.00 3.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 16.58 PGAE Gen
MAGNLA_6_CERRITOS Magnolia Power Plant Cerritos Planned 12.00 2.00 SCE Gen
MAGNLA_6_COLTON Magnolia Power Project Planned 12.00 2.00 SCE Gen
MAGNLA_6_PASADENA Magnolia Power Plant - PASADENA Forced 18.00 0.00 SCE Gen
MAGUND_1_BKSSR2 Bakersfield Solar 1 Forced 5.25 0.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 0.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 0.00 SCE Gen
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 26.16 PGAE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.49 PGAE South
MOJAVW_2_SOLAR Mojave West Forced 20.00 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 5.99 SCE Gen
MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE Forced 11.00 11.00 SCE Gen
MONTPH_7_UNITS MONTICELLO HYDRO AGGREGATE Forced 12.50 5.80 PGAE Gen
MOORPK_2_CALABS Calabasas Gas-to-Energy Facility Forced 6.96 4.46 SCE Gen
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 29.58 SDGE Gen
MSHGTS_6_MMARLF MIRAMAR LANDFILL Forced 5.00 3.30 SDGE Gen
MSOLAR_2_SOLAR1 Mesquite Solar 1 Forced 165.00 10.50 SDGE Gen
MSOLAR_2_SOLAR3 Mesquite Solar 3, LLC Forced 152.00 0.00 SDGE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned 44.40 7.20 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned 22.20 3.00 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 3.30 SCE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Forced 12.00 12.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Planned 55.00 55.00 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 5.00 APS Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 5.00 SDGE Gen
NOVATO_6_LNDFL Redwood Renewable Energy Forced 3.90 2.20 PGAE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 1.00 PGAE South
OASIS_6_CREST CREST Contracts Forced 13.50 0.00 SCE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Planned 3.80 1.65 PGAE South
OLDRIV_6_CESDBM Ces Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLDRIV_6_LKVBM1 Lakeview Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLINDA_2_COYCRK MWD Coyote Creek Hydroelectric Recovery Forced 3.13 3.13 SCE Gen
OLINDA_2_LNDFL2 Brea Power II Forced 28.10 5.10 SCE Gen
OLSEN_2_UNIT OLSEN POWER PARTNERS Planned/Forced 5.80 5.80 PGAE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Forced 78.00 6.40 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 6.81 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Forced 81.41 7.71 SCE Gen
ORMOND_7_UNIT 1 ORMOND BEACH GEN STA. UNIT 1 Forced 741.27 91.27 SCE Gen
ORTGA_6_ME1SL1 Merced 1 Forced 3.00 0.00 PGAE Gen
OTAY_6_PL1X2 Chula Vista Energy Center, LLC Forced 35.50 0.00 SDGE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Planned/Forced 603.68 47.68 SDGE Gen
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 0.42 SCE Gen
PALALT_7_COBUG Cooperatively Owned Back Up Generator Forced 4.50 4.50 PGAE Gen
PANSEA_1_PANARO Mesa Wind Project Planned/Forced 30.00 30.00 SCE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 198.51 111.51 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 111.30 5.50 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.70 4.08 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 4.85 SDGE Gen
PIT1_7_UNIT 1 PIT PH 1 UNIT 1 Planned 32.00 0.00 PGAE North
PIT3_7_PL1X3 PIT PH 3 UNITS 1, 2 & 3 AGGREGATE Planned/Forced 70.60 0.00 PGAE North
PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE Planned 95.00 0.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Planned 39.00 39.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Planned 40.00 40.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 2.06 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 0.96 PGAE North
PLAINV_6_BSOLAR Western Antelope Blue Sky Ranch A Forced 20.00 2.00 SCE Gen
PLAINV_6_SOLAR3 Sierra Solar Greenworks LLC Forced 20.00 2.00 SCE Gen
PMDLET_6_SOLAR1 SEPV Palmdale East, LLC Forced 10.00 0.00 SCE Gen
PMPJCK_1_SOLAR1 Pumpjack Solar I Forced 20.00 0.00 PGAE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 4.91 PGAE Gen
PNOCHE_1_PL1X2 Panoche Peaker Planned/Forced 49.97 0.00 PGAE South
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Forced 69.00 67.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Forced 68.50 65.99 PGAE North
POTTER_6_UNITS Potter Valley Forced 10.10 4.80 PGAE North
PUTHCR_1_SOLAR1 Putah Creek Solar Farm Forced 1.98 0.00 PGAE Gen
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Forced 635.00 5.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 106.18 43.18 SCE Gen
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Forced 57.00 33.40 PGAE North
RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 Forced 56.90 49.90 PGAE North
RDWAY_1_CREST CREST Contracts Forced 6.50 0.00 SCE Gen
RECTOR_2_CREST Rector Aggregate Solar Resources Forced 14.00 0.00 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 6.55 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Forced 2.25 2.25 SCE Gen
RECTOR_2_QF Kaweah Unit 1 Planned 17.00 17.00 SCE Gen
REDBLF_6_UNIT RED BLUFF PEAKER PLANT Forced 44.00 10.60 PGAE Gen
REDOND_7_UNIT 5 REDONDO GEN STA. UNIT 5 Forced 178.87 68.87 SCE Gen
REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 Forced 175.00 175.00 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Forced 480.00 480.00 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 2.50 SCE Gen
RIOBRV_6_UNIT 1 RIO BRAVO HYDRO Forced 14.00 14.00 PGAE Gen
ROLLIN_6_UNIT ROLLINS HYDRO Forced 13.50 7.17 PGAE North
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 2.00 SCE Gen
RSMSLR_6_SOLAR2 Rosamond Two Forced 20.00 0.00 SCE Gen
RTEDDY_2_SOLAR1 Rosamond West Solar 1 Forced 54.00 16.00 SCE Gen
RTREE_2_WIND1 Rising Tree 1 Forced 79.20 0.00 SCE Gen
RTREE_2_WIND2 Rising Tree 2 Forced 19.80 0.00 SCE Gen
RTREE_2_WIND3 Rising Tree 3 Forced 99.00 0.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 620.50 19.60 PGAE South
RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 Forced 49.00 0.00 SCE Gen
RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 Forced 49.00 0.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Forced 48.35 0.00 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Forced 48.50 0.00 SCE Gen
RVSIDE_6_SPRING SPRINGS GENERATION PROJECT AGGREGATE Forced 36.00 9.00 SCE Gen
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Planned 46.00 46.00 PGAE North
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 92.10 34.10 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 4.29 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 555.00 8.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 555.00 8.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned/Forced 3.93 3.13 SCE Gen
SCEC_1_PDRP124 LCR AMS Hybrid West LA 1-C-LCRLL Forced 1.56 0.00 SCE Gen
SCEC_1_PDRP172 LCR AMS Hybrid West LA 1-C-LSCE Forced 0.52 0.00 SCE Gen
SCEC_1_PDRP173 LCR AMS Hybrid West LA 2-C-LSCE Forced 1.97 0.00 SCE Gen
SCEC_1_PDRP34 LCR AMS Hybrid West LA 1-C-LCRLL Forced 0.23 0.00 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 112.01 SCE Gen
SCEW_2_PDRP114 LCR AMS Hybrid West LA 1-W-SCE Forced 18.71 0.00 SCE Gen
SCEW_2_PDRP115 LCR AMS Hybrid West LA 1-W-LCRLL Forced 3.50 1.85 SCE Gen
SCEW_2_PDRP158 LCR AMS Hybrid West LA 1-W-LCEM1 Forced 0.26 0.00 SCE Gen
SCEW_2_PDRP159 LCR AMS Hybrid West LA 1-W-LNEI1 Forced 1.45 0.00 SCE Gen
SCEW_2_PDRP160 LCR AMS Hybrid West LA 2-W-LSCE Forced 7.82 0.00 SCE Gen
SCEW_2_PDRP162 LCR AMS Hybrid West LA 2-W-LNEI1 Forced 0.24 0.00 SCE Gen
SCEW_2_PDRP163 LCR AMS Hybrid West LA 2-W-LPIPO Forced 2.64 0.00 SCE Gen
SCEW_2_PDRP164 LCR AMS Hybrid West LA 2-W-LLACC Forced 0.45 0.00 SCE Gen
SCEW_2_PDRP167 LCR AMS Hybrid West LA 1-W-2-SCE Forced 9.05 0.00 SCE Gen
SCEW_2_PDRP169 LCR AMS Hybrid West LA 1-C-LUCOP Forced 1.80 0.00 SCE Gen
SCEW_2_PDRP22 LCR AMS Hybrid West LA 1-W-LPIPO Forced 0.70 0.00 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 336.04 21.81 PGAE Gen
SCHNDR_1_WSTSDE Westside Solar Station Forced 15.00 2.00 PGAE Gen
SEARLS_7_ARGUS Argus Cogeneration Forced 19.00 0.00 SCE Gen
SENTNL_2_CTG2 Sentinel Unit 2 Forced 95.34 3.34 SCE Gen
SENTNL_2_CTG4 Sentinel Unit 4 Forced 102.47 10.47 SCE Gen
SENTNL_2_CTG5 Sentinel Unit 5 Forced 103.81 11.81 SCE Gen
SENTNL_2_CTG6 Sentinel Unit 6 Forced 100.99 6.99 SCE Gen
SENTNL_2_CTG7 Sentinel Unit 7 Forced 97.06 5.06 SCE Gen
SENTNL_2_CTG8 Sentinel Unit 8 Forced 101.80 9.80 SCE Gen
SHUTLE_6_CREST CREST Contracts Forced 4.00 0.00 SCE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 3.93 PGAE Gen
SLSTR2_2_SOLAR2 Solar Star 2 Forced 276.00 0.00 SCE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned 374.43 0.00 PGAE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 0.00 PGAE North
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 53.00 1.00 PGAE Gen
SNCLRA_2_HOWLNG Houwelings Nurseries Oxnard, Inc Forced 13.00 0.00 SCE Gen
SNCLRA_2_UNIT1 New Indy Oxnard Planned 27.80 16.80 SCE Gen
SNDBAR_7_UNIT 1 SANDBAR Planned 16.20 16.20 PGAE North
SOUTH_2_UNIT SOUTH HYDRO Planned 7.10 7.10 PGAE Gen
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Forced 11.40 11.40 PGAE North
SPICER_1_UNITS SPICER HYDRO UNITS 1-3 AGGREGATE Planned 6.00 6.00 PGAE Gen
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Planned 7.00 7.00 PGAE North
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STANIS_7_UNIT 1 STANISLAUS HYDRO Forced 91.00 0.00 PGAE North
STIGCT_2_LODI LODI STIG UNIT Forced 49.90 1.90 PGAE Gen
STROUD_6_SOLAR Stroud Solar Station Forced 20.00 2.00 PGAE South
STROUD_6_WWHSR1 Winter Wheat Solar Farm Forced 1.50 0.30 PG&E South
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 40.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Forced 248.00 29.00 PGAE South
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 2.80 PGAE South
SYCAMR_2_UNIT 1 Sycamore Cogeneration Unit 1 Forced 86.00 8.41 SCE Gen
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 78.00 6.00 SCE Gen
SYCAMR_2_UNIT 3 Sycamore Cogeneration Unit 3 Forced 78.00 6.00 SCE Gen
SYCAMR_2_UNIT 4 Sycamore Cogeneration Unit 4 Forced 78.00 7.00 SCE Gen
TANHIL_6_SOLART Berry Cogen 18 Forced 17.00 0.00 PGAE South
TERMEX_2_PL1X3 TDM Forced 625.00 16.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 0.00 SCE Gen
TKOPWR_6_HYDRO Bear Creek Hydroelectric Project Planned/Forced 2.83 2.83 PGAE Gen
TRNQLT_2_SOLAR Tranquillity Forced 200.00 0.00 PGAE Gen
TRNSWD_1_QF FPL Energy C Wind Forced 38.97 38.97 SCE Gen
TXMCKT_6_UNIT McKittrick Cogen Forced 11.20 0.00 PGAE South
UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO Forced 3.50 1.00 PGAE Gen
ULTPFR_1_UNIT 1 Rio Bravo Fresno Forced 24.30 6.30 PGAE South
UNOCAL_1_UNITS TOSCO (RODEO PLANT) Forced 49.85 0.00 PGAE South
USWND2_1_WIND1 Golden Hills A Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 2.30 PGAE Gen
USWNDR_2_LABWD1 LaBrisa Wind Project Forced 9.00 0.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 3.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 2.30 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 1.85 1.85 PGAE North
VALLEY_5_PERRIS MWD Perris Hydroelectric Recovery Plant Forced 7.94 7.94 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Forced 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 36.30 SCE Gen
VICTOR_1_CREST Victor Aggregate Solar Resources Forced 24.50 0.00 SCE Gen
VICTOR_1_SOLAR1 Victor Phelan Solar One Forced 17.50 0.00 SCE Gen
VICTOR_1_SOLAR2 Alamo Solar Forced 20.00 0.00 SCE Gen
VILLPK_2_VALLYV MWD Valley View Hydroelectric Recovery P Forced 4.10 4.10 SCE Gen
WADHAM_6_UNIT Wadham Energy LP Forced 29.07 29.07 PGAE North
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SCE Gen
WDLEAF_7_UNIT 1 WOODLEAF HYDRO Forced 60.00 20.00 PGAE North
WFRESN_1_SOLAR Joya Del Sol Forced 1.50 0.00 PGAE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 26.50 SCE Gen
WISE_1_UNIT 1 Wise Hydro Unit 1 Forced 14.50 5.84 PGAE Gen
WISE_1_UNIT 2 WISE HYDRO UNIT 2 Planned/Forced 3.20 3.20 PGAE North
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 18.40 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 2.00 PGAE Gen
WOLFSK_1_UNITA1 Wolfskill Energy Center Forced 46.90 0.00 PGAE Gen
YUBACT_1_SUNSWT YUBA CITY COGEN Planned 49.97 0.00 PGAE North
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
APLHIL_1_SFKHY1 South Fork Powerhouse Forced 2.68 2.68
CABALO_2_M2WSR2 Mustang 2 Whirlaway Solar Forced 100.00 0.00
HARDWK_6_STWBM1 Still Water Ranch Dairy Forced 1.00 1.00
MALIN_5_HERMDYN MALIN_5_HERMDYN Forced 308.00 308.00
RTEDDY_2_SC1SR3 Rosamond West Solar Clean Forced 40.00 40.00
RTEDDY_2_SEBSR3 Rosamond West Solar East Bay 3 Forced 56.00 56.00
RTEDDY_2_SEBSR4 Rosamond West Solar East Bay 4 Forced 56.00 56.00
RTEDDY_2_SPASR4 Rosamond West Solar Palo Alto Forced 26.00 26.00
RTEDDY_2_SRXSR4 Rosamond West Solar Rosie X Forced 14.00 14.00
SUTTER_2_CISO Sutter Power Plant Pseudo-CISO Forced 275.00 11.00
VOLTA_7_PONHY1 VOLTA_7_PONHY1 Forced 1.25 1.25


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
APS Gen 0 3 40.00 0.00
PG&E South 0 2 0.30 0.00
PGAE Gen 24 155 1044.66 828.61
PGAE North 23 47 401.12 799.98
PGAE South 4 72 234.07 290.60
SCE Gen 28 207 1805.97 1554.66
SDGE Gen 7 35 168.17 250.00
0 12 11.00 504.93
Total 86 533 3705.29 4228.78


Report Generated on:
09/01/2020 08:30:01 (PPT)
Filtered Parameters:
Date = 09/01/2020
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

System conditions are dynamic and may change, affecting the accuracy of this report. This report includes all outages, curtailments and temporary operating constraints reflecting normal operations that are effective at the time of the report. Because outages may overlap or may not all be simultaneously in effect at the time of this report, Other real-time reports may indicate a different total outage/curtailment than this report. This report reflects the best available data at the date and time of the report. It is a snapshot of conditions existing at the time the report was posted. This report is initiated once daily 1515 Pacific Time.

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.