Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADERA_1_SOLAR1 Adera Solar Forced 20.00 0.00 PGAE Gen
ADERA_1_SOLAR1 Adera Solar Forced 20.00 0.00 SCE Gen
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 9.00 PGAE Gen
AGRICO_6_PL3N5 Fresno Peaker Forced 22.69 0.00 PGAE South
ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 Planned 321.40 321.40 SCE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 25.00 2.00 PGAE South
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Forced 25.00 2.00 PGAE South
ALT6DN_2_WIND7 Pinyon Pines 1 Forced 164.31 0.00 SCE Gen
ALT6DS_2_WIND9 Pinyon Pines 2 Forced 132.00 0.00 SCE Gen
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 0.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 3.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 1.50 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 3.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW6 Mustang Hills Planned 150.00 6.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 88.15 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 134.84 3.74 SCE Gen
ALTWD_1_QF Altwind Forced 28.84 28.84 SCE Gen
ARCOGN_2_UNITS WATSON COGENERATION Planned 416.60 206.60 SCE Gen
ATWELL_1_SOLAR Atwell Island PV Solar Generating Faci. Planned 20.00 0.00 PGAE South
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BASICE_2_UNITS King City Cogen Planned/Forced 120.00 29.99 PGAE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 428.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 6.08 PGAE South
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 4.21 PGAE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Planned 119.00 119.00 PGAE Gen
BGSKYN_2_AS2SR1 Antelope Solar 2 Forced 105.00 0.00 SCE Gen
BGSKYN_2_ASPSR2 Antelope Solar 2 San Pablo Forced 100.00 0.00 SCE Gen
BGSKYN_2_BS3SR3 Big Sky Solar 3 Forced 20.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 598.00 SCE Gen
BIGSKY_2_BSKSR6 Big Sky Solar 6 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR7 Big Sky Solar 7 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR8 Big Sky Solar 8 Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR1 Antelope Big Sky Ranch Forced 20.00 2.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 2.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BIOMAS_1_UNIT 1 WOODLAND BIOMASS Forced 25.50 25.50 PGAE North
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned 13.40 11.50 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned 15.80 12.70 SCE Gen
BKRFLD_2_SOLAR1 Bakersfield 111 Forced 1.38 0.00 PGAE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Forced 85.00 2.00 PGAE North
BLAST_1_WIND Mountain View IV Wind Planned 49.00 49.00 SCE Gen
BLCKBT_2_STONEY BLACK BUTTE HYDRO Forced 6.20 6.20 PGAE Gen
BLYTHE_1_SOLAR1 Blythe Solar 1 Project Forced 21.00 0.00 SCE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 0.00 SDGE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 0.00 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 2.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 4.10 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00 PGAE Gen
BREGGO_6_SOLAR NRG Borrego Solar One Forced 26.00 1.00 SDGE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 6.00 SCE Gen
BUCKBL_2_PL1X3 Blythe Energy Center Planned 493.63 493.63 SCE Gen
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Planned 57.25 57.25 PGAE Gen
BUCKWD_1_NPALM1 North Palm Springs 1A Forced 2.40 0.00 SCE Gen
BURNYF_2_UNIT 1 Burney Forest Power Planned 29.00 29.00 PGAE Gen
CALFTS_2_CFSSR1 California Flats Solar South Planned 150.00 0.00 PGAE Gen
CALPIN_1_AGNEW Agnews Power Plant Forced 28.56 0.56 PGAE Gen
CAMCHE_1_PL1X3 CAMANCHE UNITS 1, 2 & 3 AGGREGATE Forced 9.99 8.39 PGAE Gen
CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE Forced 49.00 49.00 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned 24.00 24.00 PGAE North
CARLS1_2_CARCT1 Carlsbad 1 Planned 422.00 0.00 SDGE Gen
CARLS2_1_CARCT1 Carlsbad 2 Planned 105.50 0.00 SDGE Gen
CENTER_2_RHONDO MWD Rio Hondo Hydroelectric Recovery Pla Forced 1.91 1.91 SCE Gen
CENTER_2_SOLAR1 Pico Rivera Forced 0.90 0.00 SCE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 47.11 SCE Gen
CENTRY_6_PL1X4 CENTURY GENERATING PLANT (AGGREGATE) Forced 41.40 0.00 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 6.67 PGAE Gen
CHICPK_7_UNIT 1 Chicago Park Powerhouse Forced 42.00 34.80 PGAE North
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 1.90 SCE Gen
CLOVDL_1_SOLAR Cloverdale Solar I Forced 1.50 0.00 PGAE Gen
CLOVER_2_UNIT Clover Creek Forced 0.99 0.99 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 0.00 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 0.00 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Planned 208.96 208.96 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Planned 204.29 204.29 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned 176.72 29.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Planned 175.67 28.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Planned 641.00 641.00 PGAE North
CONTRL_1_CASAD2 Mammoth G2 Forced 10.50 0.00 SCE Gen
CONTRL_1_LUNDY LUNDY Planned 3.00 2.15 SCE Gen
CONTRL_1_POOLE POOLE HYDRO PLANT 1 Planned 10.90 10.65 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Planned 11.94 11.84 SCE Gen
CORONS_6_CLRWTR Clearwater Power Plant Planned 28.00 28.00 SCE Gen
COVERD_2_HCKHY1 HATCHET CREEK Forced 6.89 5.69 PGAE Gen
COVERD_2_MCKHY1 Montgomery Creek Hydro Forced 2.80 2.60 PGAE Gen
COVERD_2_RCKHY1 ROARING CREEK Forced 2.00 1.50 PGAE Gen
COWCRK_2_UNIT Cow Creek Hydro Forced 2.00 2.00 PGAE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Forced 70.40 44.96 PGAE North
CRNEVL_6_CRNVA Crane Valley Forced 0.90 0.90 PGAE Gen
CROKET_7_UNIT CROCKETT COGEN Planned 240.00 240.00 PGAE North
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Planned 50.00 0.00 SDGE Gen
CRWCKS_1_SOLAR1 Crow Creek Solar 1 Planned 20.00 0.00 PGAE Gen
CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN Planned/Forced 7.00 7.00 PGAE South
CSCGNR_1_UNIT 1 GIANERA PEAKER UNIT 1 Forced 24.75 24.75 PGAE South
CSCGNR_1_UNIT 2 GIANERA PEAKER UNIT 2 Forced 24.75 24.75 PGAE South
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 0.13 PGAE South
DAIRLD_1_MD2BM1 Madera Digester Genset 2 Forced 0.80 0.00 PGAE Gen
DAVIS_1_SOLAR1 Grasslands 3 Forced 1.00 0.00 PGAE Gen
DAVIS_1_SOLAR2 Grasslands 4 Forced 1.00 0.00 PGAE Gen
DEERCR_6_UNIT 1 DEER CREEK Forced 7.00 7.00 PGAE North
DELAMO_2_SOLAR5 Golden Springs Building L Forced 1.00 0.00 SCE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 30.00 PGAE Gen
DEVERS_1_SEPV05 SEPV 5 Forced 2.00 0.00 SCE Gen
DIABLO_7_UNIT 2 Diablo Canyon Unit 2 Planned 1150.00 1150.00 PGAE South
DMDVLY_1_UNITS DIAMOND VALLEY LAKE PUMP-GEN PLANT Forced 21.00 21.00 SCE Gen
DONNLS_7_UNIT Donnells Hydro Forced 72.00 3.50 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Planned/Forced 52.23 0.93 PGAE South
DRACKR_2_DSUBT2 Dracker Solar Unit 2 BESS Planned 115.00 0.00 SCE Gen
DRACKR_2_DSUBT3 Dracker Solar Unit 3 BESS Planned 115.00 115.00 SCE Gen
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Planned 125.00 0.00 SCE Gen
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 20.70 SCE Gen
DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 Forced 50.00 35.00 PGAE North
DSRTHV_2_DH2BT1 Desert Harvest BESS Forced 35.00 0.00 SCE Gen
DSRTSN_2_SOLAR1 Desert Sunlight 300 Forced 300.00 0.00 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 76.80 PGAE South
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Planned 22.00 22.00 PGAE North
DUTCH2_7_UNIT 1 DUTCH FLAT 2 PH Forced 26.00 19.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned/Forced 235.00 75.00 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Planned/Forced 200.00 200.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 29.00 APS Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 29.00 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Planned 7.50 0.00 SDGE Gen
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Planned 93.00 31.00 PGAE North
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 24.70 PGAE Gen
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Planned 263.00 263.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Planned 263.68 263.68 SCE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned/Forced 2.56 1.16 SCE Gen
ETIWND_2_SOLAR1 Dedeaux Ontario Forced 1.00 0.00 SCE Gen
ETIWND_2_SOLAR2 Rochester Forced 1.00 0.00 SCE Gen
ETIWND_2_UNIT1 ETIWND_2_UNIT1 Planned 33.60 31.60 SCE Gen
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Forced 94.50 18.50 PGAE South
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 1.80 PGAE Gen
FORBST_7_UNIT 1 FORBESTOWN HYDRO Planned 37.50 37.50 PGAE North
FROGTN_1_UTICAM Murphys Powerhouse Forced 3.60 2.00 PGAE Gen
GARNET_1_SOLAR North Palm Springs 4A Forced 4.00 0.00 SCE Gen
GARNET_1_SOLAR2 Garnet Solar Power Generation Station 1 Forced 4.00 4.00 SCE Gen
GARNET_1_UNITS GARNET GREEN POWER PROJECT AGGREGATE Forced 16.50 9.09 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 0.00 SCE Gen
GARNET_2_WIND4 Windustries Forced 9.80 0.00 SCE Gen
GARNET_2_WIND5 Eastwind Forced 3.00 0.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATES_2_SOLAR Gates Solar Station Forced 20.00 10.00 PGAE South
GATEWY_2_GESBT1 Gateway Energy Stroage Forced 250.00 0.00 SDGE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Forced 585.00 45.00 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 86.80 11.80 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 15.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 73.00 22.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 13.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 63.00 63.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 75.50 14.50 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 27.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 50.00 14.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 12.00 PGAE South
GILRPP_1_PL1X2 GILROY ENERGY CENTER UNITS 1&2 AGGREGATE Forced 95.20 47.50 PGAE South
GLNARM_2_UNIT 5 Glenarm Turbine 5 Forced 65.81 12.49 SCE Gen
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Planned 22.07 22.07 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_2_VALBT1 Vallecito Energy Storage Forced 10.00 0.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GONZLS_6_UNIT Johnson Canyon Landfill Forced 1.42 0.67 PGAE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Forced 20.00 20.00 PGAE North
GUERNS_6_HD3BM3 Hanford Digester Genset 3 Forced 1.00 0.00 PGAE Gen
GUERNS_6_VH2BM1 Hanford Digester Genset 2 Forced 1.00 0.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Planned/Forced 98.46 98.46 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 98.43 12.43 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 95.80 14.80 PGAE Gen
HATLOS_6_BWDHY1 Bidwell Ditch Forced 2.00 0.50 PGAE Gen
HATLOS_6_LSCRK Lost Creek 1 & 2 Hydro Conversion Forced 1.70 0.71 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.00 PGAE Gen
HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 Planned 407.00 407.00 PGAE South
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 1.66 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 1.92 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 83.00 SCE Gen
HINSON_6_LBECH1 Long Beach Unit 1 Forced 63.00 7.00 SCE Gen
HINSON_6_LBECH2 Long Beach Unit 2 Forced 63.00 9.00 SCE Gen
HINSON_6_LBECH3 Long Beach Unit 3 Forced 63.00 12.00 SCE Gen
HINSON_6_LBECH4 Long Beach Unit 4 Forced 63.00 11.00 SCE Gen
HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) Forced 4.90 4.90 PGAE Gen
HNTGBH_7_UNIT 2 HUNTINGTON BEACH GEN STA. UNIT 2 Planned/Forced 225.80 225.80 SCE Gen
HOOVER_2_MWDDYN HOOVER Planned/Forced 249.00 108.00 SCE Gen
HOOVER_2_VEADYN HOOVER Forced 16.00 6.00 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 16.27 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 748.10 PGAE Gen
INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 Planned/Forced 44.00 44.00 SCE Gen
INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 Forced 44.53 0.00 SCE Gen
INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 Forced 43.69 0.00 SCE Gen
INSKIP_2_UNIT INSKIP HYDRO Forced 8.00 8.00 PGAE North
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Planned/Forced 405.00 129.00 PGAE Gen
INTMNT_3_ANAHEIM Intermountain Power Project Planned/Forced 236.00 0.00 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Planned 136.00 0.00 SCE Gen
IVSLRP_2_SOLAR1 Silver Ridge Mount Signal Forced 200.00 0.00 SDGE Gen
IVWEST_2_SOLAR1 Imperial Valley West ( Q # 608) Forced 150.00 0.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 0.00 SCE Gen
JAYNE_6_WLSLR Westlands Solar Farm PV 1 Forced 18.00 0.00 PGAE Gen
JOANEC_2_STABT1 Santa Ana Storage 1 Forced 20.00 20.00 SCE Gen
KEKAWK_6_UNIT STS HYDROPOWER LTD. (KEKAWAKA) Forced 5.50 5.50 PGAE Gen
KELSO_2_UNITS Mariposa Energy Planned/Forced 198.03 0.03 PGAE Gen
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE North
KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 Forced 13.00 13.00 PGAE South
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE North
KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 Forced 12.80 12.80 PGAE South
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Planned/Forced 153.90 153.90 PGAE North
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Planned/Forced 153.90 153.90 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.10 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 10.60 SCE Gen
KILARC_2_UNIT 1 KILARC HYDRO Forced 1.50 1.50 PGAE North
KINGCO_1_KINGBR Kingsburg Cogen Planned 34.50 34.50 PGAE South
KINGRV_7_UNIT 1 KINGS RIVER HYDRO UNIT 1 Planned 51.20 51.20 PGAE South
KNGCTY_6_UNITA1 King City Energy Center, Unit 1 Forced 44.60 44.60 PGAE Gen
KRNCNY_6_UNIT KERN CANYON Forced 11.50 11.50 PGAE South
LAMONT_1_SOLAR3 Woodmere Solar Farm Forced 14.99 1.69 PGAE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 12.66 PGAE South
LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA Forced 20.00 20.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Planned 267.00 267.00 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 266.00 25.00 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 266.00 10.00 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 267.00 28.00 PGAE Gen
LAROA2_2_UNITA1 LR2 Planned/Forced 322.00 322.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Forced 799.47 7.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 10.84 PGAE South
LITLRK_6_GBCSR1 Green Beanworks C Forced 3.00 1.50 SCE Gen
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Planned/Forced 49.70 49.70 PGAE South
LMBEPK_2_UNITA1 Lambie Energy Center, Unit #1 Forced 47.50 1.50 PGAE Gen
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 580.00 308.00 PGAE Gen
LNCSTR_6_SOLAR2 SEPV Sierra NGR Forced 2.75 1.55 SCE Gen
LOCKFD_1_BEARCK Bear Creek Solar Forced 1.50 0.00 PGAE Gen
LODI25_2_UNIT 1 LODI GAS TURBINE Forced 25.00 2.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 3.58 PGAE Gen
MAGNLA_6_ANAHEIM Magnolia Power Plant Anaheim Planned 109.00 109.00 SCE Gen
MAGNLA_6_CERRITOS Magnolia Power Plant Cerritos Planned 12.00 12.00 SCE Gen
MAGNLA_6_COLTON Magnolia Power Project Planned 12.00 12.00 SCE Gen
MAGUND_1_BKISR1 Bakersfield Industrial 1 Forced 1.00 0.00 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 0.00 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 75.00 PGAE Gen
MARCPW_6_SOLAR1 Maricopa West Solar PV Forced 20.00 6.00 PGAE Gen
MCCALL_1_QF Fish Water Forced 0.52 0.52 PGAE Gen
MDFKRL_2_PROJCT MIDDLE FORK AND RALSTON PSP Forced 210.00 15.00 PGAE North
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 17.16 PGAE Gen
MIRLOM_2_CORONA MWD Corona Hydroelectric Recovery Plant Forced 2.85 2.85 SCE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MIRLOM_2_TEMESC MWD Temescal Hydroelectric Recovery Plan Forced 2.85 2.85 SCE Gen
MIRLOM_6_PEAKER Mira Loma Peaker Planned/Forced 46.00 46.00 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 5.49 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 4.18 SCE Gen
MOJAVW_2_SOLAR Mojave West Forced 20.00 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 3.99 SCE Gen
MONTPH_7_UNITS MONTICELLO HYDRO AGGREGATE Forced 12.50 9.80 PGAE Gen
MOORPK_2_ACOBT1 Acorn I BESS Forced 2.00 2.00 SCE Gen
MOORPK_2_CALABS Calabasas Gas-to-Energy Facility Forced 6.96 4.46 SCE Gen
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Planned/Forced 510.00 260.00 PGAE South
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Forced 510.00 10.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 19.58 SDGE Gen
MRGT_6_MMAREF Miramar Energy Facility Planned/Forced 45.00 45.00 SDGE Gen
MRGT_6_TGEBT1 Top Gun Energy Storage Planned 30.00 0.00 SDGE Gen
MSOLAR_2_SOLAR2 Mesquite Solar 2 Forced 100.81 1.83 SDGE Gen
MSTANG_2_SOLAR Mustang Forced 30.00 5.00 PGAE Gen
MSTANG_2_SOLAR3 Mustang 3 Forced 40.00 7.00 PGAE Gen
MSTANG_2_SOLAR4 Mustang 4 Forced 30.00 2.00 PGAE Gen
MTNPOS_1_UNIT MT.POSO COGENERATION CO. Planned 46.64 46.64 PGAE South
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 6.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 1.80 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 1.32 SCE Gen
MURRAY_6_UNIT Grossmont Hospital Forced 4.12 4.12 SDGE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Forced 12.00 3.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Planned 55.00 55.00 PGAE North
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NEENCH_6_SOLAR Alpine Solar Forced 66.00 0.00 SCE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 1.00 APS Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 1.00 SDGE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Forced 55.00 28.00 PGAE South
OASIS_6_SOLAR2 Oasis Solar Forced 20.00 0.00 SCE Gen
OCTILO_5_WIND Ocotillo Wind Energy Facility Forced 265.00 20.70 SDGE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 3.60 PGAE South
OLDRIV_6_CESDBM Ces Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLDRIV_6_LKVBM1 Lakeview Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLINDA_2_COYCRK MWD Coyote Creek Hydroelectric Recovery Forced 3.13 3.13 SCE Gen
OLINDA_2_LNDFL2 Brea Power II Forced 28.10 3.10 SCE Gen
OLSEN_2_UNIT OLSEN POWER PARTNERS Forced 5.80 5.80 PGAE Gen
OMAR_2_UNIT 4 KERN RIVER COGENERATION CO. UNIT 4 Forced 81.44 7.44 SCE Gen
ORLND_6_HIGHLI High Line Canal Hydro Forced 0.50 0.50 PGAE Gen
ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 Planned 750.00 750.00 SCE Gen
OROVIL_6_UNIT Oroville Cogeneration, LP Forced 7.50 2.50 PGAE Gen
ORTGA_6_ME1SL1 Merced 1 Forced 3.00 0.00 PGAE Gen
OSO_6_NSPIN OSO_6_NSPIN Forced 70.00 0.00 SCE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Planned/Forced 603.68 603.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Planned/Forced 10.62 10.62 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 20.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned 1.92 0.92 SCE Gen
PALALT_7_COBUG Cooperatively Owned Back Up Generator Forced 4.50 4.50 PGAE Gen
PARDEB_6_UNITS Pardee Power House Forced 30.00 30.00 PGAE Gen
PEARBL_2_NSPIN PEARBL_2_NSPIN Forced 118.00 0.00 SCE Gen
PEORIA_1_SOLAR Sonora 1 Forced 1.50 0.00 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned 198.51 168.51 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 111.30 1.60 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.70 0.68 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 0.00 SDGE Gen
PIT1_7_UNIT 1 PIT PH 1 UNIT 1 Planned/Forced 32.00 32.00 PGAE North
PIT3_7_PL1X3 PIT PH 3 UNITS 1, 2 & 3 AGGREGATE Planned 70.60 34.60 PGAE North
PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE Planned 95.00 95.00 PGAE North
PIT5_7_PL1X2 PIT PH 5 UNITS 1 & 2 AGGREGATE Planned 82.00 82.00 PGAE North
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Planned 82.00 30.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 0.40 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 1.40 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 2.99 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 1.89 PGAE North
PLACVL_1_CHILIB Chili Bar Hydro Forced 8.40 8.40 PGAE Gen
PLMSSR_6_HISIER High Sierra Cogeneration Aggregate Forced 6.00 2.99 PGAE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.00 PGAE Gen
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 0.00 PGAE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Forced 69.00 69.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Forced 68.50 6.50 PGAE North
POTTER_6_UNITS Potter Valley Forced 10.10 9.10 PGAE North
PRCTVY_1_MIGBT1 Miguel BESS Planned 2.00 2.00 SDGE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 106.18 38.18 SCE Gen
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Forced 57.00 27.55 PGAE North
RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 Forced 56.90 56.90 PGAE North
RECTOR_2_CREST Rector Aggregate Solar Resources Planned 14.00 1.50 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 5.95 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Forced 2.25 2.25 SCE Gen
RECTOR_2_QF Kaweah Unit 1 Planned 20.09 20.09 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Planned 480.00 480.00 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.95 PGAE Gen
RIOBRV_6_UNIT 1 RIO BRAVO HYDRO Forced 14.00 14.00 PGAE Gen
ROLLIN_6_UNIT ROLLINS HYDRO Forced 13.50 10.31 PGAE North
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 2.00 SCE Gen
RSMSLR_6_SOLAR2 Rosamond Two Forced 20.00 0.00 SCE Gen
RTEDDY_2_SOLAR1 Rosamond West Solar 1 Forced 54.00 20.00 SCE Gen
RTEDDY_2_SOLAR2 Rosamond West Solar 2 Forced 54.00 0.00 SCE Gen
RTREE_2_WIND2 Rising Tree 2 Forced 19.80 0.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 615.18 0.00 PGAE South
RVSIDE_6_SOLAR1 Tequesquite Landfill Solar Project Forced 7.50 1.50 SCE Gen
SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE Forced 46.00 12.00 PGAE North
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Forced 72.00 12.00 PGAE Gen
SANTGO_2_LNDFL1 Bowerman Power Forced 19.60 3.60 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 10.72 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 555.00 0.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 555.00 0.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.43 SCE Gen
SCEN_6_PDRP28 CBP-DA-N-LNEI1 Forced 1.65 1.65 SCE Gen
SCEW_2_PDRP03 LCR AMS Hybrid Irvine 1-W-LPIPO Forced 5.00 0.00 SCE Gen
SCEW_2_PDRP10 LCR AMS Hybrid Irvine 2-W-LSCE Forced 2.50 0.00 SCE Gen
SCEW_2_PDRP114 LCR AMS Hybrid West LA 1-W-SCE Forced 18.71 0.00 SCE Gen
SCEW_2_PDRP115 LCR AMS Hybrid West LA 1-W-LCRLL Forced 3.50 0.00 SCE Gen
SCEW_2_PDRP160 LCR AMS Hybrid West LA 2-W-LSCE Forced 7.82 0.00 SCE Gen
SCEW_2_PDRP162 LCR AMS Hybrid West LA 2-W-LNEI1 Forced 0.24 0.00 SCE Gen
SCEW_2_PDRP163 LCR AMS Hybrid West LA 2-W-LPIPO Forced 2.64 0.00 SCE Gen
SCEW_2_PDRP164 LCR AMS Hybrid West LA 2-W-LLACC Forced 0.45 0.00 SCE Gen
SCEW_2_PDRP167 LCR AMS Hybrid West LA 1-W-2-SCE Forced 9.05 0.00 SCE Gen
SCEW_2_PDRP169 LCR AMS Hybrid West LA 1-C-LUCOP Forced 1.80 0.00 SCE Gen
SCEW_2_PDRP22 LCR AMS Hybrid West LA 1-W-LPIPO Forced 0.70 0.00 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 336.04 12.10 PGAE Gen
SCHNDR_1_WSTSDE Westside Solar Station Forced 15.00 5.00 PGAE Gen
SENTNL_2_CTG2 Sentinel Unit 2 Forced 95.34 3.34 SCE Gen
SENTNL_2_CTG4 Sentinel Unit 4 Planned 102.47 27.47 SCE Gen
SENTNL_2_CTG5 Sentinel Unit 5 Forced 103.81 11.81 SCE Gen
SENTNL_2_CTG6 Sentinel Unit 6 Planned 100.99 9.99 SCE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 1.13 PGAE Gen
SKERN_6_SOLAR2 SKIC Solar Planned 10.00 1.70 PGAE South
SLSTR1_2_SOLAR1 Solar Star 1 Forced 310.00 0.00 SCE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 197.43 PGAE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 5.14 PGAE North
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 64.80 10.80 PGAE Gen
SNCLRA_2_SILBT1 Silverstrand BESS Planned 11.00 11.00 SCE Gen
SNCLRA_2_UNIT1 New Indy Oxnard Planned/Forced 27.80 16.80 SCE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Forced 6.50 5.70 PGAE North
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Forced 11.40 11.40 PGAE North
SPOINT_2_MEADDYN SPOINT_2_MEADDYN Forced 325.00 325.00 SCE Gen
SPOINT_2_PARKERDYN Southpoint Energy Center Forced 200.00 200.00 SCE Gen
SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) Forced 6.40 6.40 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
SPRV_3_COAL_SPV3 SPRV_3_COAL_SPV3 Forced 317.00 317.00 PNM Gen
STIGCT_2_LODI LODI STIG UNIT Forced 49.90 0.00 PGAE Gen
STOILS_1_UNITS Chevron Richmond Refinery Forced 56.20 0.00 PGAE Gen
STROUD_6_SOLAR Stroud Solar Station Forced 20.00 2.00 PGAE South
STROUD_6_WWHSR1 Winter Wheat Solar Farm Forced 1.50 0.00 PG&E South
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Planned/Forced 586.02 314.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Planned/Forced 248.00 165.00 PGAE South
SUNSHN_2_LNDFL Sunshine Gas Producers Forced 20.00 0.00 SCE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 4.80 PGAE South
S_RITA_6_SOLAR1 Sun Harvest Solar Forced 1.50 0.00 PGAE Gen
TEHAPI_2_WIND1 Wind Wall Monolith 1 Forced 19.85 12.65 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Forced 23.66 5.66 SCE Gen
TENGEN_2_PL1X2 Berry Cogen 42 Forced 40.20 20.20 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 0.00 SDGE Gen
TKOPWR_6_HYDRO Bear Creek Hydroelectric Project Planned 2.83 2.83 PGAE Gen
TRNSWD_1_QF FPL Energy C Wind Forced 38.97 23.97 SCE Gen
TWISSL_6_SOLAR Nickel 1 ("NLH1") Forced 1.50 0.00 PGAE Gen
TX-ELK_6_SOLAR1 Castor Forced 1.50 0.00 PGAE Gen
ULTPCH_1_UNIT 1 Pacific Ultrapower Chinese Station Planned 18.00 18.00 PGAE North
ULTRCK_2_UNIT Rio Bravo Rocklin Forced 24.40 24.40 PGAE North
UNOCAL_1_UNITS TOSCO (RODEO PLANT) Forced 49.85 0.00 PGAE South
USWND2_1_WIND1 Golden Hills A Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 2.30 PGAE Gen
USWNDR_2_LABWD1 LaBrisa Wind Project Forced 9.00 0.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.66 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 9.20 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 0.70 0.70 PGAE North
VALLEY_5_PERRIS MWD Perris Hydroelectric Recovery Plant Forced 7.94 7.94 SCE Gen
VENWD_1_WIND3 Painted Hills Forced 44.53 0.00 SCE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Forced 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 36.80 SCE Gen
VESTAL_2_WELLHD Wellhead Power Delano Planned 49.00 49.00 SCE Gen
VICTOR_1_CREST Victor Aggregate Solar Resources Forced 24.50 4.00 SCE Gen
VICTOR_1_EXSLRB Expressway Solar B Forced 2.00 1.00 SCE Gen
VILLPK_2_VALLYV MWD Valley View Hydroelectric Recovery P Forced 4.10 4.10 SCE Gen
VSTAES_6_VESBT1 Vista Energy Storage Forced 40.00 10.00 SDGE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Planned/Forced 96.65 96.65 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Planned/Forced 96.49 96.49 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Planned/Forced 96.65 96.65 SCE Gen
WDLEAF_7_UNIT 1 WOODLEAF HYDRO Forced 60.00 20.00 PGAE North
WFRESN_1_SOLAR Joya Del Sol Forced 1.50 0.00 PGAE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 11.50 SCE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 14.70 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 1.00 PGAE Gen
WNDSTR_2_WIND Windstar Forced 120.00 6.00 SCE Gen
WSTWND_2_M90WD2 Mojave 90 Forced 48.85 0.00 SCE Gen
YUBACT_1_SUNSWT YUBA CITY COGEN Planned 49.97 49.97 PGAE North
YUBACT_6_UNITA1 Yuba City Energy Center (Calpine) Forced 47.60 0.00 PGAE North
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
ALTWD_2_COAWD1 Coachella 1 Forced 50.40 0.00
APLHIL_1_SFKHY1 South Fork Powerhouse Forced 2.68 2.68
GARNET_2_COAWD2 Coachella 2 Forced 10.80 0.00
MALIN_5_HERMDYN MALIN_5_HERMDYN Forced 308.00 308.00
SUTTER_2_CISO Sutter Power Plant Pseudo-CISO Planned 275.00 275.00
TEHAPI_2_PW1WD1 Point Wind 1 Forced 47.49 0.00
VISTRA_5_DALBT1 Dallas Energy Storage Planned/Forced 100.00 100.00
VISTRA_5_DALBT2 Dallas Energy Storage 2 Forced 100.00 100.00
VISTRA_5_DALBT3 Dallas Energy Storage 3 Forced 100.00 50.00
VOLTA_7_PONHY1 VOLTA_7_PONHY1 Forced 1.25 1.25


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
APS Gen 0 3 30.00 0.00
PG&E South 0 1 0.00 0.00
PGAE Gen 22 141 2418.27 1277.77
PGAE North 22 43 447.80 1749.57
PGAE South 21 57 726.41 2415.41
PNM Gen 0 1 0.00 317.00
SCE Gen 63 162 1590.32 4618.92
SDGE Gen 10 25 56.39 976.80
4 9 50.00 786.93
Total 142 442 5319.19 12142.40


Report Generated on:
03/19/2021 08:30:00 (PPT)
Filtered Parameters:
Date = 03/19/2021
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.