Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Planned/Forced 22.00 22.00 PGAE Gen
ADMEST_6_SOLAR Adams East Forced 19.00 1.45 PGAE Gen
AGRICO_6_PL3N5 Fresno Peaker Forced 22.69 0.00 PGAE South
ALAMIT_7_UNIT 5 ALAMITOS GEN STA. UNIT 5 Planned/Forced 480.00 0.00 SCE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 25.00 3.00 PGAE South
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Forced 25.00 3.00 PGAE South
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 0.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 3.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 3.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 88.15 0.00 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 134.84 52.59 SCE Gen
ALTWD_2_AT3WD3 Altech 3 Forced 9.80 9.40 SCE Gen
AVENAL_6_AVPARK Avenal Park Solar Project Forced 6.00 0.00 PGAE South
AVENAL_6_SANDDG Sand Drag Solar Project Forced 19.00 0.00 PGAE Gen
AVENAL_6_SUNCTY Sun City Solar Project Forced 20.00 0.00 PGAE Gen
BALCHS_7_UNIT 3 BALCH 2 PH UNIT 3 Planned 54.60 54.60 PGAE South
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BASICE_2_UNITS King City Cogen Forced 120.00 0.00 PGAE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 428.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 4.08 PGAE South
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 4.21 PGAE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 119.00 PGAE Gen
BGSKYN_2_AS2SR1 Antelope Solar 2 Forced 105.00 30.00 SCE Gen
BGSKYN_2_BS3SR3 Big Sky Solar 3 Forced 20.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 319.00 SCE Gen
BIGSKY_2_BSKSR6 Big Sky Solar 6 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR7 Big Sky Solar 7 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR8 Big Sky Solar 8 Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR1 Antelope Big Sky Ranch Forced 20.00 2.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR6 Solverde 1 Forced 85.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BIOMAS_1_UNIT 1 WOODLAND BIOMASS Forced 25.50 25.50 PGAE North
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Forced 13.40 5.15 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Forced 15.80 5.80 SCE Gen
BKRFLD_2_SOLAR1 Bakersfield 111 Forced 1.38 0.00 PGAE Gen
BLACK_7_UNIT 1 JAMES B. BLACK 1 Forced 85.00 2.00 PGAE North
BLCKBT_2_STONEY BLACK BUTTE HYDRO Planned/Forced 6.20 0.00 PGAE Gen
BLKCRK_2_GMCBT1 Genesis McCoy Bess Planned 230.00 185.00 SCE Gen
BNNIEN_7_ALTAPH ALTA POWER HOUSE Planned 1.00 1.00 PGAE Gen
BORDER_6_UNITA1 CalPeak Power Border Unit 1 Forced 51.25 26.25 SDGE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 49.00 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO1 Shiloh I Wind Project Forced 150.00 1.50 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 0.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 0.00 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 0.00 PGAE Gen
BRODIE_2_WIND Coram Brodie Wind Project Forced 102.00 0.00 SCE Gen
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Planned 57.25 57.25 PGAE Gen
BUCKWD_1_QF Buckwind Re-powering project Forced 16.50 0.00 SCE Gen
BURNYF_2_UNIT 1 Burney Forest Power Planned 29.00 0.00 PGAE Gen
CALGEN_1_UNITS Coso Navy 1 Planned 80.00 80.00 SCE Gen
CAMCHE_1_PL1X3 CAMANCHE UNITS 1, 2 & 3 AGGREGATE Forced 9.99 8.29 PGAE Gen
CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE Planned 49.00 0.00 PGAE North
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Planned 120.00 120.00 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned 24.00 24.00 PGAE North
CARLS1_2_CARCT1 Carlsbad 1 Forced 422.00 0.00 SDGE Gen
CARLS2_1_CARCT1 Carlsbad 2 Forced 105.50 0.00 SDGE Gen
CASTVL_2_FCELL PGE CSUEB Hayward Fuel Cell Forced 1.40 1.40 PGAE Gen
CENTER_2_RHONDO MWD Rio Hondo Hydroelectric Recovery Pla Forced 1.91 1.91 SCE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 0.00 SCE Gen
CENTRY_6_PL1X4 CENTURY GENERATING PLANT (AGGREGATE) Forced 41.40 10.20 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 4.67 PGAE Gen
CHICPK_7_UNIT 1 Chicago Park Powerhouse Forced 42.00 42.00 PGAE North
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 1.50 SDGE Gen
CHINO_2_SASOLR SS San Antonio West LLC Forced 1.50 0.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 1.90 SCE Gen
CLOVDL_1_SOLAR Cloverdale Solar I Forced 1.50 0.00 PGAE Gen
CLOVER_2_UNIT Clover Creek Forced 0.99 0.89 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 3.59 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 2.93 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 9.63 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 3.08 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned 176.72 27.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Planned 175.67 26.67 PGAE North
COLUSA_2_PL1X3 Colusa Generating Station Planned/Forced 641.00 307.40 PGAE North
CONTRL_1_CASAD2 Mammoth G2 Forced 10.50 0.00 SCE Gen
CONTRL_1_LUNDY LUNDY Forced 3.00 1.50 SCE Gen
CONTRL_1_POOLE POOLE HYDRO PLANT 1 Planned/Forced 10.90 9.95 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Planned/Forced 11.94 11.84 SCE Gen
COVERD_2_HCKHY1 HATCHET CREEK Forced 6.89 6.89 PGAE Gen
COVERD_2_RCKHY1 ROARING CREEK Forced 2.00 2.00 PGAE Gen
COWCRK_2_UNIT Cow Creek Hydro Forced 2.00 2.00 PGAE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Forced 70.40 70.40 PGAE North
CRSTWD_6_KUMYAY Kumeyaay Wind Farm Forced 50.00 0.00 SDGE Gen
CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN Forced 7.00 0.00 PGAE South
CSCGNR_1_UNIT 1 GIANERA PEAKER UNIT 1 Planned 24.75 24.75 PGAE South
CSCGNR_1_UNIT 2 GIANERA PEAKER UNIT 2 Forced 24.75 1.75 PGAE South
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 0.13 PGAE South
CUYAMS_6_CUYSR1 Cuyama Solar Forced 40.00 0.00 PGAE Gen
DAIRLD_1_MD2BM1 Madera Digester Genset 2 Forced 0.80 0.00 PGAE Gen
DELAMO_2_SOLAR3 Golden Springs Building G Forced 1.25 0.00 SCE Gen
DELAMO_2_SOLAR4 Golden Springs Building F Forced 1.30 0.00 SCE Gen
DELAMO_2_SOLAR5 Golden Springs Building L Forced 1.00 0.00 SCE Gen
DELSUR_6_CREST Delsur Aggregate Solar Resources Forced 10.00 0.00 SCE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Forced 880.00 321.00 PGAE Gen
DEVERS_1_SEPV05 SEPV 5 Forced 2.00 0.00 SCE Gen
DONNLS_7_UNIT Donnells Hydro Forced 72.00 72.00 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 0.93 PGAE South
DRACKR_2_DS3SR3 Dracker Solar Unit 3 Forced 125.00 0.00 SCE Gen
DRACKR_2_DSUBT3 Dracker Solar Unit 3 BESS Forced 115.00 85.00 SCE Gen
DRACKR_2_SOLAR2 Dracker Solar Unit 2 Planned 125.00 0.00 SCE Gen
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 20.70 SCE Gen
DRUM_7_PL3X4 Drum PH 1 Units 3 & 4 Aggregate Forced 28.90 28.90 PGAE North
DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 Forced 50.00 5.00 PGAE North
DSRTHV_2_DH2BT1 Desert Harvest BESS Forced 35.00 15.00 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Planned 147.80 147.80 PGAE South
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Forced 22.00 2.50 PGAE North
DUTCH2_7_UNIT 1 DUTCH FLAT 2 PH Forced 26.00 26.00 PGAE North
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 29.00 APS Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 29.00 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Planned 7.50 0.00 SDGE Gen
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Planned 93.00 31.00 PGAE North
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Forced 551.70 16.70 PGAE Gen
ELNIDP_6_BIOMAS El Nido Biomass to Energy Planned 10.50 10.50 PGAE South
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 0.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 0.00 SCE Gen
ENERSJ_2_WIND ESJ Wind Energy Planned 155.10 0.00 SDGE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Forced 2.56 1.56 SCE Gen
ETIWND_2_UNIT1 ETIWND_2_UNIT1 Planned 33.60 31.60 SCE Gen
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Forced 94.50 10.50 PGAE South
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 2.90 PGAE Gen
FMEADO_6_HELLHL FMEADO_6_HELLHL Planned 0.60 0.60 PGAE North
FMEADO_7_UNIT FRENCH MEADOWS HYDRO Planned 16.00 16.00 PGAE North
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30 PGAE Gen
GARLND_2_GASLR Garland B Forced 180.00 20.00 SCE Gen
GARNET_1_WINDS Garnet Winds Aggregation Forced 22.50 0.00 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 3.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATES_2_SOLAR Gates Solar Station Forced 20.00 10.00 PGAE South
GATEWY_2_GESBT1 Gateway Energy Stroage Planned 250.00 91.00 SDGE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Planned 585.00 585.00 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 86.80 10.80 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 16.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 73.00 24.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 14.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 63.00 19.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 75.50 13.50 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 23.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 50.00 16.00 PGAE Gen
GIFFEN_6_SOLAR Giffen Solar Station Forced 10.00 1.25 PGAE South
GIFFEN_6_SOLAR1 Aspiration Solar G Forced 9.00 0.00 PGAE Gen
GILROY_1_UNIT GILROY COGEN AGGREGATE Planned 120.00 120.00 PGAE South
GLNARM_2_UNIT 5 Glenarm Turbine 5 Forced 65.81 12.49 SCE Gen
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Planned 22.07 22.07 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_6_ELLWOD ELLWOOD ENERGY SUPPORT FACILITY Planned 54.00 54.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Forced 20.00 20.00 PGAE North
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GRZZLY_1_BERKLY Berkeley Cogeneration Forced 26.35 26.35 PGAE Gen
GUERNS_6_HD3BM3 Hanford Digester Genset 3 Forced 1.00 0.00 PGAE Gen
GUERNS_6_VH2BM1 Hanford Digester Genset 2 Forced 1.00 0.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Forced 98.46 2.39 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 98.43 15.43 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 95.80 17.80 PGAE Gen
HATCR2_7_UNIT Hat Creek #2 Planned 8.50 8.50 PGAE North
HATLOS_6_BWDHY1 Bidwell Ditch Forced 2.00 0.50 PGAE Gen
HATLOS_6_LSCRK Lost Creek 1 & 2 Hydro Conversion Forced 1.70 0.71 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.00 PGAE Gen
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 2.27 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 2.51 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 51.00 SCE Gen
HINSON_6_CARBGN BP WILMINGTON CALCINER Forced 30.00 30.00 SCE Gen
HINSON_6_LBECH1 Long Beach Unit 1 Forced 63.00 7.00 SCE Gen
HINSON_6_LBECH2 Long Beach Unit 2 Forced 63.00 9.00 SCE Gen
HINSON_6_LBECH3 Long Beach Unit 3 Forced 63.00 12.00 SCE Gen
HINSON_6_LBECH4 Long Beach Unit 4 Forced 63.00 11.00 SCE Gen
HOLGAT_1_BORAX U.S. Borax, Unit 1 Planned 48.20 48.20 SCE Gen
HOOVER_2_MWDDYN HOOVER Forced 249.00 100.00 SCE Gen
HOOVER_2_VEADYN HOOVER Forced 16.00 6.00 SCE Gen
HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 Planned 65.08 32.54 PGAE North
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 65.08 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 206.10 PGAE Gen
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 63.00 PGAE Gen
IVANPA_1_UNIT2 Ivanpah 2 Forced 133.00 0.00 SCE Gen
JACMSR_1_JACSR1 Jacumba Solar Farm Planned 20.00 0.00 SDGE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 6.40 SCE Gen
JOANEC_2_STABT1 Santa Ana Storage 1 Forced 20.00 20.00 SCE Gen
KEKAWK_6_UNIT STS HYDROPOWER LTD. (KEKAWAKA) Forced 5.50 5.50 PGAE Gen
KELSO_2_UNITS Mariposa Energy Planned/Forced 198.03 152.32 PGAE Gen
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Planned/Forced 153.90 153.90 PGAE North
KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 Planned/Forced 153.90 153.90 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.10 PGAE South
KERNRG_1_UNITS South Belridge Cogen Facility Forced 55.20 0.00 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 3.10 SCE Gen
KNTSTH_6_SOLAR Kent South Forced 20.00 0.00 PGAE South
LAKHDG_6_UNIT 1 Lake Hodges Pumped Storage-Unit1 Planned 20.00 20.00 SDGE Gen
LAKHDG_6_UNIT 2 Lake Hodges Pumped Storage-Unit2 Planned 20.00 20.00 SDGE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 12.66 PGAE South
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 267.00 267.00 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 266.00 266.00 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 266.00 9.00 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 267.00 23.00 PGAE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 2.00 SDGE Gen
LEBECS_2_UNITS Pastoria Energy Facility Forced 799.47 271.47 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Forced 309.84 10.84 PGAE South
LITLRK_6_GBCSR1 Green Beanworks C Forced 3.00 1.50 SCE Gen
LITLRK_6_SEPV01 Gestamp Solar 1 Forced 2.00 0.00 SCE Gen
LITLRK_6_SOLAR2 Palmdale 18 Forced 2.00 0.00 SCE Gen
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 6.70 PGAE South
LMBEPK_2_UNITA1 Lambie Energy Center, Unit #1 Forced 47.50 1.50 PGAE Gen
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 580.00 2.00 PGAE Gen
LOCKFD_1_BEARCK Bear Creek Solar Forced 1.50 0.00 PGAE Gen
LODI25_2_UNIT 1 LODI GAS TURBINE Forced 25.00 3.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 10.58 PGAE Gen
MAGNLA_6_CERRITOS Magnolia Power Plant Cerritos Forced 12.00 2.00 SCE Gen
MAGNLA_6_COLTON Magnolia Power Project Forced 12.00 2.00 SCE Gen
MAGUND_1_BKSSR2 Bakersfield Solar 1 Forced 5.25 1.25 PGAE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 32.50 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 125.00 PGAE Gen
MANZNA_2_WIND Manzana Wind Forced 189.00 6.00 SCE Gen
MCARTH_6_FRIVRB Fall River Mills Project B Forced 1.50 0.00 PGAE Gen
MCCALL_1_QF Fish Water Forced 0.52 0.52 PGAE Gen
METEC_2_PL1X3 Metcalf Energy Center Planned 593.16 593.16 PGAE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MIRLOM_6_PEAKER Mira Loma Peaker Forced 46.00 1.40 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 3.49 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Forced 47.20 4.18 SCE Gen
MOJAVW_2_SOLAR Mojave West Forced 20.00 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 5.99 SCE Gen
MONTPH_7_UNITS MONTICELLO HYDRO AGGREGATE Forced 12.50 5.80 PGAE Gen
MOORPK_2_CALABS Calabasas Gas-to-Energy Facility Forced 6.96 4.27 SCE Gen
MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 Planned 510.00 510.00 PGAE South
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Planned/Forced 510.00 510.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Planned 494.58 494.58 SDGE Gen
MSTANG_2_SOLAR Mustang Forced 30.00 2.00 PGAE Gen
MSTANG_2_SOLAR3 Mustang 3 Forced 40.00 2.00 PGAE Gen
MSTANG_2_SOLAR4 Mustang 4 Forced 30.00 16.00 PGAE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 3.00 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 2.40 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 11.22 SCE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Planned 12.00 4.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Planned 55.00 50.40 PGAE North
NCPA_7_GP1UN2 NCPA GEO PLANT 1 UNIT 2 Forced 39.94 0.00 PGAE Gen
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NEENCH_6_SOLAR Alpine Solar Forced 66.00 0.00 SCE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 2.00 APS Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 2.00 SDGE Gen
NOVATO_6_LNDFL Redwood Renewable Energy Forced 3.90 2.00 PGAE Gen
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Forced 12.00 12.00 PGAE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 1.50 PGAE South
OASIS_6_CREST CREST Contracts Forced 13.50 0.00 SCE Gen
OCTILO_5_WIND Ocotillo Wind Energy Facility Forced 265.00 19.00 SDGE Gen
OGROVE_6_PL1X2 Orange Grove Energy Center Planned 96.00 49.00 SDGE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 1.45 PGAE South
OLDRIV_6_CESDBM Ces Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLDRIV_6_LKVBM1 Lakeview Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLINDA_2_COYCRK MWD Coyote Creek Hydroelectric Recovery Forced 3.13 3.13 SCE Gen
ORLND_6_HIGHLI High Line Canal Hydro Forced 0.50 0.50 PGAE Gen
ORLND_6_SOLAR1 Enerparc California 2 Forced 1.50 0.00 PGAE Gen
OROLOM_1_SOLAR1 Oro Loma Solar 1 Forced 10.00 0.00 PGAE South
OROLOM_1_SOLAR2 Oro Loma Solar 2 Forced 10.00 0.00 PGAE South
OROVIL_6_UNIT Oroville Cogeneration, LP Forced 7.50 1.50 PGAE Gen
OSO_6_NSPIN OSO_6_NSPIN Forced 70.00 0.00 SCE Gen
OTAY_6_PL1X2 Chula Vista Energy Center, LLC Planned 35.50 35.50 SDGE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 23.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 1.02 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Forced 1.92 1.02 SCE Gen
PARDEB_6_UNITS Pardee Power House Forced 30.00 30.00 PGAE Gen
PEABDY_2_LNDFL1 Potrero Hills Energy Producers Forced 8.00 2.00 PGAE South
PEARBL_2_NSPIN PEARBL_2_NSPIN Forced 118.00 0.00 SCE Gen
PHOENX_1_UNIT PHOENIX PH Planned 2.00 2.00 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Planned/Forced 111.30 2.23 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.70 0.77 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 0.52 SDGE Gen
PIT1_7_UNIT 1 PIT PH 1 UNIT 1 Planned/Forced 32.00 32.00 PGAE North
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Forced 82.00 41.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 0.00 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 0.00 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 3.14 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 2.04 PGAE North
PLAINV_6_BSOLAR Western Antelope Blue Sky Ranch A Forced 20.00 1.00 SCE Gen
PLAINV_6_SOLAR3 Sierra Solar Greenworks LLC Forced 20.00 3.00 SCE Gen
PLMSSR_6_HISIER High Sierra Cogeneration Aggregate Forced 6.00 6.00 PGAE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Planned/Forced 401.00 0.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.91 PGAE Gen
PNOCHE_1_PL1X2 Panoche Peaker Forced 49.97 0.00 PGAE South
PNOCHE_1_UNITA1 CalPeak Power Panoche Unit 1 Forced 52.01 52.01 PGAE Gen
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Forced 69.00 67.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Forced 68.50 68.50 PGAE North
POTTER_6_UNITS Potter Valley Forced 10.10 10.10 PGAE North
PVERDE_5_SCEDYN PVERDE_5_SCEDYN Planned 635.00 215.00 SCE Gen
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 106.18 45.18 SCE Gen
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Forced 57.00 57.00 PGAE North
RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 Forced 56.90 56.90 PGAE North
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 5.25 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Forced 2.25 2.25 SCE Gen
RENWD_1_QF Renwind re-powering project Forced 10.00 0.00 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.95 PGAE Gen
RIOBRV_6_UNIT 1 RIO BRAVO HYDRO Forced 14.00 14.00 PGAE Gen
ROLLIN_6_UNIT ROLLINS HYDRO Forced 13.50 7.97 PGAE North
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 0.00 SCE Gen
RSMSLR_6_SOLAR2 Rosamond Two Forced 20.00 0.00 SCE Gen
RTEDDY_2_SOLAR2 Rosamond West Solar 2 Forced 54.00 10.00 SCE Gen
RTREE_2_WIND2 Rising Tree 2 Forced 19.80 0.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 615.18 7.48 PGAE South
RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 Planned 49.00 49.00 SCE Gen
RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 Planned 49.00 49.00 SCE Gen
RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 Planned 48.35 48.35 SCE Gen
RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 Planned 48.50 48.50 SCE Gen
RVSIDE_6_SOLAR1 Tequesquite Landfill Solar Project Forced 7.50 1.50 SCE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Planned/Forced 72.00 36.00 PGAE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 10.55 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 555.00 0.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Planned 555.00 555.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Forced 6.95 5.95 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.43 SCE Gen
SCEC_1_PDRP15 CBP-DA-C-LCRLL Forced 1.52 1.52 SCE Gen
SCEC_1_PDRP16 CBP-DA-C-LSCE Forced 4.57 4.57 SCE Gen
SCEC_1_PDRP17 CBP-DO-C-LSCE Forced 4.80 4.80 SCE Gen
SCEC_1_PDRP24 CBP-DA-C-LNEI1 Forced 2.22 2.22 SCE Gen
SCEC_1_PDRP35 CBP-DO-C-LSEL1 Forced 1.42 1.42 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 117.01 SCE Gen
SCEN_6_PDRP28 CBP-DA-N-LNEI1 Forced 1.65 1.65 SCE Gen
SCEW_2_PDRP12 CBP-DA-W-LNEI1 Forced 1.61 1.61 SCE Gen
SCEW_2_PDRP13 CBP-DO-W-LSEL1 Forced 1.36 1.36 SCE Gen
SCEW_2_PDRP14 CBP-DO-W-LNEI1 Forced 1.14 1.14 SCE Gen
SCEW_2_PDRP35 CBP-DO-W-LSCE Forced 1.61 1.61 SCE Gen
SCEW_2_PDRP36 CBP-DA-W-LSCE Forced 1.13 1.13 SCE Gen
SCHD_1_PDRP14 CBP-DO-HD-LSEL1 Forced 1.11 1.11 SCE Gen
SCHD_1_PDRP52 CBP-DA-H-LNEI1 Forced 1.15 1.15 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 336.04 336.04 PGAE Gen
SCHNDR_1_WSTSDE Westside Solar Station Forced 15.00 5.00 PGAE Gen
SCNW_6_PDRP05 CBP-DO-NW-LSCE Forced 1.10 1.10 SCE Gen
SCNW_6_PDRP57 CBP-DA-NW-LNEI1 Forced 1.12 1.12 SCE Gen
SENTNL_2_CTG7 Sentinel Unit 7 Forced 106.73 3.73 SCE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 1.13 PGAE Gen
SLSTR1_2_SOLAR1 Solar Star 1 Forced 310.00 0.00 SCE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 173.43 PGAE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 2.83 PGAE North
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 64.80 9.80 PGAE Gen
SNCLRA_2_UNIT1 New Indy Oxnard Planned/Forced 27.80 16.80 SCE Gen
SNCLRA_2_VESBT1 Ventura Energy Storage Forced 100.00 0.00 SCE Gen
SNCLRA_6_OXGEN OXGEN Planned 47.70 47.70 SCE Gen
SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE Forced 11.40 5.95 PGAE North
SPIFBD_1_PL1X2 SIERRA PACIFIC IND. (SONORA) Forced 7.50 0.00 PGAE Gen
SPOINT_2_MEADDYN SPOINT_2_MEADDYN Planned 325.00 325.00 SCE Gen
SPOINT_2_PARKERDYN Southpoint Energy Center Planned 200.00 200.00 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STANIS_7_UNIT 1 STANISLAUS HYDRO Planned 91.00 91.00 PGAE North
STIGCT_2_LODI LODI STIG UNIT Forced 49.90 0.90 PGAE Gen
STNRES_1_UNIT Covanta Stanislaus Forced 19.90 19.90 PGAE North
STROUD_6_SOLAR Stroud Solar Station Forced 20.00 2.00 PGAE South
SUMWHT_6_SWSSR1 Summer Wheat Solar Farm Forced 18.50 5.30 PGAE Gen
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Planned 586.02 586.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Planned/Forced 248.00 167.00 PGAE South
SUNSLR_1_SSVSR1 Sunshine Valley Solar 1 Forced 100.00 6.00 VEA Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 4.80 PGAE South
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 78.00 78.00 SCE Gen
TEHAPI_2_WIND2 Wind Wall Monolith 2 Forced 23.66 2.06 SCE Gen
TENGEN_2_PL1X2 Berry Cogen 42 Forced 40.20 20.20 SCE Gen
TERMEX_2_PL1X3 TDM Forced 625.00 2.00 SDGE Gen
TIFFNY_1_DILLON TIFFNY_1_DILLON Forced 45.00 0.00 SCE Gen
TRNQL8_2_VERSR1 Tranquillity 8 Verde Forced 60.00 20.00 PGAE Gen
TRNSWD_1_QF FPL Energy C Wind Forced 38.97 25.47 SCE Gen
TULEWD_1_TULWD1 Tule Wind Planned 130.50 0.00 SDGE Gen
TWISSL_6_SOLAR Nickel 1 ("NLH1") Forced 1.50 0.00 PGAE Gen
UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO Forced 3.50 3.50 PGAE Gen
ULTRCK_2_UNIT Rio Bravo Rocklin Planned 24.40 0.00 PGAE North
UNOCAL_1_UNITS TOSCO (RODEO PLANT) Forced 49.85 0.00 PGAE South
USWND2_1_WIND1 Golden Hills A Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 4.60 PGAE Gen
USWNDR_2_LABWD1 LaBrisa Wind Project Forced 9.00 0.00 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 3.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 0.00 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 0.70 0.00 PGAE North
VALLEY_5_PERRIS MWD Perris Hydroelectric Recovery Plant Forced 7.94 7.94 SCE Gen
VALLEY_5_SOLAR2 AP North Lake Solar Forced 20.00 0.00 SCE Gen
VEDDER_1_SEKERN TEXACO EXPLORATION & PROD (SE KERN RIVER Forced 34.47 12.47 PGAE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 13.80 SCE Gen
VICTOR_1_CREST Victor Aggregate Solar Resources Forced 24.50 0.00 SCE Gen
VICTOR_1_EXSLRA Expressway Solar A Forced 2.00 0.00 SCE Gen
VICTOR_1_EXSLRB Expressway Solar B Forced 2.00 0.00 SCE Gen
VICTOR_1_SOLAR2 Alamo Solar Forced 20.00 0.00 SCE Gen
VICTOR_1_VDRYFA Victor Dry Farm Ranch A Forced 5.00 0.00 SCE Gen
VICTOR_1_VDRYFB Victor Dry Farm Ranch B Forced 5.00 0.00 SCE Gen
VILLPK_2_VALLYV MWD Valley View Hydroelectric Recovery P Forced 4.10 4.10 SCE Gen
VSTAES_6_VESBT1 Vista Energy Storage Forced 40.00 1.50 SDGE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SCE Gen
WALNUT_6_HILLGEN Puente Hills Forced 47.00 0.00 SCE Gen
WFRESN_1_SOLAR Joya Del Sol Forced 1.50 0.00 PGAE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 16.50 SCE Gen
WISE_1_UNIT 1 Wise Hydro Unit 1 Forced 14.50 6.21 PGAE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 5.40 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 0.00 PGAE Gen
WOLFSK_1_UNITA1 Wolfskill Energy Center Planned/Forced 46.90 0.00 PGAE Gen
WSENGY_1_UNIT 1 Wheelabrator Shasta Forced 50.00 16.00 PGAE North
YUBACT_6_UNITA1 Yuba City Energy Center (Calpine) Planned 47.60 47.60 PGAE North
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
BANKPP_2_NSPIN BANKPP_2_NSPIN Forced 270.00 0.00
BGSKYN_2_ASSR3A Antelope Solar 3A Planned/Forced 15.00 0.00
BGSKYN_2_ASSR3B Antelope Solar 3B Planned/Forced 5.00 0.00
BLKDIA_2_BDEBT1 Black Diamond Energy Storage Forced 200.00 200.00
CABALO_2_M2WSR2 Mustang 2 Whirlaway Solar Planned 100.00 0.00
HARDWK_6_STWBM1 Still Water Ranch Dairy Forced 1.00 1.00
MALIN_5_HERMDYN MALIN_5_HERMDYN Forced 308.00 308.00
SUNST2_5_SS2SR1 Sun Streams Solar 2 Planned 150.00 0.00
SUTTER_2_CISO Sutter Power Plant Pseudo-CISO Forced 275.00 275.00
VISTRA_5_DALBT1 Dallas Energy Storage Forced 100.00 100.00
VISTRA_5_DALBT2 Dallas Energy Storage 2 Forced 100.00 100.00
VISTRA_5_DALBT3 Dallas Energy Storage 3 Forced 100.00 100.00
VOLTA_7_PONHY1 VOLTA_7_PONHY1 Forced 1.25 1.25


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
APS Gen 0 3 31.00 0.00
PGAE Gen 16 155 1370.89 3153.36
PGAE North 29 31 707.04 918.80
PGAE South 10 58 275.89 2121.35
SCE Gen 31 160 1904.16 1785.59
SDGE Gen 11 20 219.95 571.58
VEA Gen 0 1 6.00 0.00
4 14 0.00 1085.25
Total 101 442 4514.93 9635.93


Report Generated on:
05/16/2021 08:30:00 (PPT)
Filtered Parameters:
Date = 05/16/2021
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.