Curtailed and Non-Operational Generating Units
Resource ID Resource Name Outage Type Capacity (MW) Curtailed (MW) Zone Name
ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE Forced 22.00 10.00 PGAE Gen
ADMEST_6_SOLAR Adams East Forced 19.00 1.45 PGAE Gen
AGRICO_6_PL3N5 Fresno Peaker Forced 22.69 0.00 PGAE South
ALAMO_6_UNIT ALAMO POWER PLANT Planned 17.00 17.00 SCE Gen
ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 Forced 25.00 3.00 PGAE South
ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 Forced 25.00 3.00 PGAE South
ALTA3A_2_CPCE4 Alta Wind 4 Forced 102.00 0.00 SCE Gen
ALTA3A_2_CPCE5 Alta Wind 5 Forced 168.00 9.00 SCE Gen
ALTA4A_2_CPCW1 Alta Wind 1 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW2 Alta Wind 2 Forced 150.00 0.00 SCE Gen
ALTA4B_2_CPCW3 Alta Wind 3 Forced 150.00 3.00 SCE Gen
ALTA6B_2_WIND11 Alta Wind 11 Forced 88.15 0.20 SCE Gen
ALTA6E_2_WIND10 Alta Wind 10 Forced 134.84 5.70 SCE Gen
ALTWD_2_AT3WD3 Altech 3 Planned/Forced 9.80 9.40 SCE Gen
AVENAL_6_AVPARK Avenal Park Solar Project Forced 6.00 0.00 PGAE South
AVENAL_6_SANDDG Sand Drag Solar Project Forced 19.00 0.00 PGAE Gen
AVENAL_6_SUNCTY Sun City Solar Project Forced 20.00 0.00 PGAE Gen
BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 Planned 31.00 31.00 PGAE South
BANGOR_6_HYDRO Virginia Ranch Dam Powerplant Forced 1.00 1.00 PGAE Gen
BARRE_6_PEAKER Barre Peaker Forced 47.00 0.00 SCE Gen
BASICE_2_UNITS King City Cogen Planned/Forced 120.00 0.00 PGAE Gen
BCTSYS_5_PWXDYN BCTSYS_5_PWXDYN Forced 428.00 428.00 PGAE Gen
BDGRCK_1_UNITS BADGER CREEK LIMITED Forced 48.08 4.58 PGAE South
BEARMT_1_UNIT Bear Mountain Limited Forced 49.21 5.21 PGAE Gen
BELDEN_7_UNIT 1 BELDEN HYDRO Forced 119.00 117.00 PGAE Gen
BGSKYN_2_AS2SR1 Antelope Solar 2 Forced 105.00 6.00 SCE Gen
BGSKYN_2_ASPSR2 Antelope Solar 2 San Pablo Forced 100.00 0.00 SCE Gen
BGSKYN_2_BS3SR3 Big Sky Solar 3 Forced 20.00 0.00 SCE Gen
BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP Planned/Forced 820.00 473.00 SCE Gen
BIGSKY_2_BSKSR6 Big Sky Solar 6 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR7 Big Sky Solar 7 Forced 20.00 0.00 SCE Gen
BIGSKY_2_BSKSR8 Big Sky Solar 8 Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR1 Antelope Big Sky Ranch Forced 20.00 1.00 SCE Gen
BIGSKY_2_SOLAR2 Big Sky Solar 4 Forced 40.00 0.00 SCE Gen
BIGSKY_2_SOLAR3 Big Sky Summer Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR4 Western Antelope Blue Sky Ranch B Forced 20.00 0.00 SCE Gen
BIGSKY_2_SOLAR5 Big Sky Solar 2 Forced 5.00 0.00 SCE Gen
BIGSKY_2_SOLAR7 Big Sky Solar 1 Forced 50.00 0.00 SCE Gen
BIOMAS_1_UNIT 1 WOODLAND BIOMASS Forced 25.50 25.50 PGAE North
BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 Planned 13.40 5.90 SCE Gen
BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 Planned 15.80 9.30 SCE Gen
BKRFLD_2_SOLAR1 Bakersfield 111 Forced 1.38 0.00 PGAE Gen
BLAST_1_WIND Mountain View IV Wind Planned 49.00 2.00 SCE Gen
BLCKBT_2_STONEY BLACK BUTTE HYDRO Forced 6.20 6.20 PGAE Gen
BLKCRK_2_GMCBT1 Genesis McCoy Bess Planned 230.00 70.00 SCE Gen
BLKCRK_2_SOLAR1 McCoy Station Forced 250.00 0.00 SCE Gen
BOGUE_1_UNITA1 Feather River Energy Center, Unit #1 Forced 47.60 0.00 PGAE North
BOWMN_6_HYDRO NID Hydro Bowman Powerhouse Planned 3.60 3.60 PGAE Gen
BRDSLD_2_HIWIND High Winds Energy Center Forced 162.00 41.40 PGAE Gen
BRDSLD_2_MTZUM2 NextEra Energy Montezuma Wind II Forced 78.20 0.00 PGAE Gen
BRDSLD_2_MTZUMA FPL Energy Montezuma Wind Forced 36.80 0.00 PGAE Gen
BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 Forced 150.00 2.00 PGAE Gen
BRDSLD_2_SHLO3A Shiloh III Wind Project, LLC Forced 102.50 2.05 PGAE Gen
BRDSLD_2_SHLO3B Shiloh IV Wind Project Forced 100.00 1.60 PGAE Gen
BREGGO_6_SOLAR NRG Borrego Solar One Forced 26.00 1.60 SDGE Gen
BRODIE_2_WIND Coram Brodie Wind Project Planned/Forced 102.00 0.00 SCE Gen
BUCKBL_2_PL1X3 Blythe Energy Center Planned 493.63 0.00 SCE Gen
BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE Planned/Forced 57.25 57.25 PGAE Gen
BUCKWD_1_NPALM1 North Palm Springs 1A Forced 2.40 0.00 SCE Gen
CALFTN_2_SOLAR California Flats North Forced 130.00 0.00 PGAE Gen
CAMCHE_1_PL1X3 CAMANCHE UNITS 1, 2 & 3 AGGREGATE Forced 9.99 9.99 PGAE Gen
CAPWD_1_QF Edom Hills Wind Farm Forced 19.55 0.00 SCE Gen
CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE Forced 49.00 49.00 PGAE North
CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE Forced 120.00 102.07 PGAE North
CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 Planned 24.00 24.00 PGAE North
CARLS1_2_CARCT1 Carlsbad 1 Planned/Forced 422.00 105.50 SDGE Gen
CARLS2_1_CARCT1 Carlsbad 2 Forced 105.50 0.00 SDGE Gen
CAVLSR_2_BSOLAR California Valley Solar Ranch-Phase B Forced 40.00 0.00 PGAE Gen
CAVLSR_2_RSOLAR California Valley Solar Ranch-Phase A Forced 210.00 0.00 PGAE Gen
CENTER_2_RHONDO MWD Rio Hondo Hydroelectric Recovery Pla Forced 1.91 1.91 SCE Gen
CENTER_6_PEAKER Center Peaker Forced 47.11 0.00 SCE Gen
CENTRY_6_PL1X4 CENTURY GENERATING PLANT (AGGREGATE) Forced 41.40 10.20 SCE Gen
CHALK_1_UNIT CHALK CLIFF LIMITED Forced 48.67 5.17 PGAE Gen
CHICPK_7_UNIT 1 Chicago Park Powerhouse Forced 42.00 32.00 PGAE North
CHILLS_1_SYCENG Sycamore Energy 1 Forced 1.50 1.05 SDGE Gen
CHINO_2_JURUPA Jurupa Forced 1.50 0.00 SCE Gen
CHINO_2_SASOLR SS San Antonio West LLC Forced 1.50 0.00 SCE Gen
CHINO_7_MILIKN MN Milliken Genco LLC Forced 1.90 1.90 SCE Gen
CLOVDL_1_SOLAR Cloverdale Solar I Forced 1.50 0.00 PGAE Gen
CLOVER_2_UNIT Clover Creek Planned/Forced 0.99 0.99 PGAE Gen
COCOPP_2_CTG1 Marsh Landing 1 Forced 204.20 4.91 PGAE South
COCOPP_2_CTG2 Marsh Landing 2 Forced 202.70 4.20 PGAE South
COCOPP_2_CTG3 Marsh Landing 3 Forced 208.96 11.24 PGAE South
COCOPP_2_CTG4 Marsh Landing 4 Forced 204.29 5.20 PGAE South
COLGAT_7_UNIT 1 Colgate Powerhouse Unit 1 Planned 176.72 29.72 PGAE North
COLGAT_7_UNIT 2 Colgate Powerhouse Unit 2 Planned 175.67 28.67 PGAE North
COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) Planned 43.00 2.00 SCE Gen
COLUSA_2_PL1X3 Colusa Generating Station Planned/Forced 641.00 296.70 PGAE North
CONTRL_1_CASAD2 Mammoth G2 Forced 10.50 3.00 SCE Gen
CONTRL_1_LUNDY LUNDY Planned 3.00 2.50 SCE Gen
CONTRL_1_POOLE POOLE HYDRO PLANT 1 Planned 10.90 9.90 SCE Gen
CONTRL_1_RUSHCK RUSH CREEK Planned 11.94 11.84 SCE Gen
COPMT4_2_SOLAR4 Copper Mountain Solar 4 Forced 92.00 4.00 SCE Gen
CORONS_6_CLRWTR Clearwater Power Plant Planned 28.00 0.00 SCE Gen
COVERD_2_HCKHY1 HATCHET CREEK Forced 6.89 6.89 PGAE Gen
COVERD_2_RCKHY1 ROARING CREEK Forced 2.00 2.00 PGAE Gen
COWCRK_2_UNIT Cow Creek Hydro Forced 2.00 2.00 PGAE Gen
CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE Forced 70.40 65.40 PGAE North
CRNEVL_6_CRNVA Crane Valley Forced 0.90 0.90 PGAE Gen
CRNEVL_6_SJQN 3 SAN JOAQUIN 3 Forced 4.20 4.20 PGAE Gen
CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN Forced 7.00 0.00 PGAE South
CSCGNR_1_UNIT 1 GIANERA PEAKER UNIT 1 Planned 24.75 24.75 PGAE South
CSCGNR_1_UNIT 2 GIANERA PEAKER UNIT 2 Forced 24.75 1.75 PGAE South
CSTRVL_7_PL1X2 Marina Land Fill Gas Forced 4.53 0.13 PGAE South
CUYAMS_6_CUYSR1 Cuyama Solar Forced 40.00 0.00 PGAE Gen
DAIRLD_1_MD2BM1 Madera Digester Genset 2 Forced 0.80 0.00 PGAE Gen
DELSUR_6_BSOLAR Central Antelope Dry Ranch B Planned 3.00 0.00 SCE Gen
DELSUR_6_CREST Delsur Aggregate Solar Resources Forced 10.00 0.00 SCE Gen
DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE Planned/Forced 880.00 0.00 PGAE Gen
DOUBLC_1_UNITS DOUBLE "C" LIMITED Forced 52.23 1.03 PGAE South
DRACKR_2_DSUBT3 Dracker Solar Unit 3 BESS Forced 115.00 85.00 SCE Gen
DREWS_6_PL1X4 Drews Generating Plant Forced 41.40 20.70 SCE Gen
DRUM_7_PL3X4 Drum PH 1 Units 3 & 4 Aggregate Forced 28.90 28.90 PGAE North
DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 Forced 50.00 8.00 PGAE North
DSRTHV_2_DH2BT1 Desert Harvest BESS Forced 35.00 0.00 SCE Gen
DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT Forced 147.80 55.80 PGAE South
DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH Forced 22.00 22.00 PGAE North
DUTCH2_7_UNIT 1 DUTCH FLAT 2 PH Forced 26.00 26.00 PGAE North
DVLCYN_1_UNITS DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE Planned 235.00 15.00 SCE Gen
EASTWD_7_UNIT EASTWOOD PUMP-GEN Forced 200.00 0.00 SCE Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 29.00 APS Gen
ELCABO_5_ECWSCEDYN El Cabo Wind Forced 298.00 29.00 SCE Gen
ELCAJN_6_EB1BT1 Eastern BESS 1 Planned 7.50 0.00 SDGE Gen
ELDORO_7_UNIT 1 El Dorado Unit 1 Forced 11.00 11.00 PGAE North
ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE Planned 93.00 31.00 PGAE North
ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE Forced 4.90 4.90 PGAE Gen
ELKHIL_2_PL1X3 ELK HILLS COMBINED CYCLE (AGGREGATE) Planned 551.70 22.70 PGAE Gen
ELNIDP_6_BIOMAS El Nido Biomass to Energy Forced 10.50 10.50 PGAE South
ELSEGN_2_UN1011 El Segundo Energy Center 5/6 Forced 263.00 0.00 SCE Gen
ELSEGN_2_UN2021 El Segundo Energy Center 7/8 Forced 263.68 0.00 SCE Gen
ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE P Planned 2.56 1.76 SCE Gen
ETIWND_2_UNIT1 ETIWND_2_UNIT1 Planned 33.60 31.60 SCE Gen
ETIWND_6_GRPLND Grapeland Peaker Forced 47.39 0.00 SCE Gen
EXCHEC_7_UNIT 1 EXCHEQUER HYDRO Forced 94.50 12.50 PGAE South
FLOWD2_2_FPLWND DIABLO WINDS Forced 18.00 3.50 PGAE Gen
FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) Forced 14.30 14.30 PGAE Gen
FROGTN_1_UTICAM Murphys Powerhouse Forced 3.60 2.80 PGAE Gen
GALE_1_SR3SR3 Sunray 3 Planned/Forced 13.80 0.00 SCE Gen
GARLND_2_GASLR Garland B Forced 180.00 0.00 SCE Gen
GARNET_1_SOLAR2 Garnet Solar Power Generation Station 1 Forced 4.00 1.30 SCE Gen
GARNET_2_HYDRO Whitewater Hydro Forced 1.00 1.00 SCE Gen
GARNET_2_WIND2 Karen Avenue Wind Farm Planned 11.70 3.00 SCE Gen
GARNET_2_WIND5 Eastwind Forced 3.00 0.00 SCE Gen
GARNET_2_WPMWD6 WINTEC PALM Forced 5.93 5.93 SCE Gen
GATES_2_SOLAR Gates Solar Station Forced 20.00 10.00 PGAE South
GATEWY_2_GESBT1 Gateway Energy Stroage Forced 250.00 250.00 SDGE Gen
GATWAY_2_PL1X3 GATEWAY GENERATING STATION Planned/Forced 585.00 58.20 PGAE South
GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) Forced 86.80 8.80 PGAE Gen
GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) Forced 57.00 16.00 PGAE Gen
GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) Forced 73.00 23.00 PGAE Gen
GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) Forced 70.00 14.00 PGAE Gen
GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) Forced 63.00 18.00 PGAE Gen
GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) Forced 75.50 14.50 PGAE Gen
GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) Forced 72.00 28.00 PGAE Gen
GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) Forced 50.00 16.00 PGAE Gen
GIFFEN_6_SOLAR Giffen Solar Station Forced 10.00 1.25 PGAE South
GILROY_1_UNIT GILROY COGEN AGGREGATE Forced 120.00 12.00 PGAE South
GLNARM_2_UNIT 5 Glenarm Turbine 5 Forced 65.81 12.49 SCE Gen
GLNARM_7_UNIT 1 GLEN ARM UNIT 1 Planned 22.07 22.07 SCE Gen
GLNARM_7_UNIT 2 GLEN ARM UNIT 2 Forced 22.30 22.30 SCE Gen
GOLETA_2_VALBT1 Vallecito Energy Storage Forced 10.00 0.00 SCE Gen
GOLETA_6_EXGEN EXXON COMPANY USA Forced 48.20 48.20 SCE Gen
GONZLS_6_UNIT Johnson Canyon Landfill Forced 1.42 1.42 PGAE Gen
GRIFFI_2_LSPDYN Griffith Energy Planned 570.00 570.00 SCE Gen
GRIZLY_1_UNIT 1 GRIZZLY HYDRO Forced 20.00 20.00 PGAE North
GRSCRK_6_BGCKWW BIG CREEK WATER WORKS - CEDAR FLAT Forced 5.00 5.00 PGAE Gen
GRZZLY_1_BERKLY Berkeley Cogeneration Forced 26.35 26.35 PGAE Gen
GUERNS_6_HD3BM3 Hanford Digester Genset 3 Forced 1.00 1.00 PGAE Gen
GUERNS_6_VH2BM1 Hanford Digester Genset 2 Forced 1.00 1.00 PGAE Gen
GWFPWR_1_UNITS Hanford Peaker Plant Forced 98.46 1.85 PGAE Gen
GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE Forced 98.43 13.43 PGAE Gen
GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE Forced 95.80 14.80 PGAE Gen
HALSEY_6_UNIT HALSEY HYDRO Forced 13.50 10.42 PGAE Gen
HATCR2_7_UNIT Hat Creek #2 Planned 8.50 8.50 PGAE North
HATLOS_6_BWDHY1 Bidwell Ditch Forced 2.00 0.50 PGAE Gen
HATLOS_6_LSCRK Lost Creek 1 & 2 Hydro Conversion Forced 1.70 0.71 PGAE Gen
HATRDG_2_WIND Hatchet Ridge Wind Farm Forced 102.00 0.00 PGAE Gen
HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 Forced 49.98 2.00 PGAE South
HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 Forced 49.42 2.25 PGAE South
HENRTS_1_SOLAR Henrietta Solar Project Forced 100.00 8.00 PGAE South
HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE Forced 830.00 44.00 SCE Gen
HINSON_6_LBECH1 Long Beach Unit 1 Planned/Forced 63.00 7.00 SCE Gen
HINSON_6_LBECH2 Long Beach Unit 2 Forced 63.00 9.00 SCE Gen
HINSON_6_LBECH3 Long Beach Unit 3 Forced 63.00 12.00 SCE Gen
HINSON_6_LBECH4 Long Beach Unit 4 Forced 63.00 11.00 SCE Gen
HINSON_6_SERRGN Southeast Resource Recovery Forced 34.00 34.00 SCE Gen
HOLSTR_1_SOLAR2 Hollister Solar Forced 1.50 0.00 PGAE Gen
HOOVER_2_MWDDYN HOOVER Planned/Forced 249.00 81.00 SCE Gen
HOOVER_2_VEADYN HOOVER Forced 16.00 4.00 SCE Gen
HUMBPP_6_UNITS Humboldt Bay Generating Station 1 Planned 97.62 32.54 PGAE North
HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) Planned 933.10 236.10 PGAE Gen
INTKEP_2_UNITS CCSF Hetch_Hetchy Hydro Aggregate Forced 405.00 63.00 PGAE Gen
INTMNT_3_ANAHEIM Intermountain Power Project Planned 236.00 73.00 SCE Gen
INTMNT_3_RIVERSIDE IPPDYN Forced 136.00 42.00 SCE Gen
IVANPA_1_UNIT1 Ivanpah 1 Forced 126.00 126.00 SCE Gen
IVANPA_1_UNIT3 Ivanpah 3 Forced 133.00 133.00 SCE Gen
JAWBNE_2_NSRWND North Sky River Wind Project Forced 160.00 2.00 SCE Gen
JOANEC_2_STABT1 Santa Ana Storage 1 Forced 20.00 20.00 SCE Gen
KEKAWK_6_UNIT STS HYDROPOWER LTD. (KEKAWAKA) Forced 5.50 0.00 PGAE Gen
KELSO_2_UNITS Mariposa Energy Planned/Forced 198.03 152.32 PGAE Gen
KERMAN_6_SOLAR1 Fresno Solar South Forced 1.50 0.00 PGAE South
KERMAN_6_SOLAR2 Fresno Solar West Forced 1.50 0.00 PGAE South
KERNFT_1_UNITS KERN FRONT LIMITED Forced 52.40 1.20 PGAE South
KERNRG_1_UNITS South Belridge Cogen Facility Forced 55.20 0.00 PGAE South
KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE Forced 25.60 0.35 SCE Gen
KINGRV_7_UNIT 1 KINGS RIVER HYDRO UNIT 1 Forced 51.20 51.20 PGAE South
KNGCTY_6_UNITA1 King City Energy Center, Unit 1 Forced 44.60 0.60 PGAE Gen
KNTSTH_6_SOLAR Kent South Forced 20.00 0.00 PGAE South
KRAMER_2_SEGS 8 KRAMER JUNCTION 8 Forced 80.00 44.00 SCE Gen
KRNCNY_6_UNIT KERN CANYON POWERHOUSE Forced 10.60 0.00 PGAE South
LAKHDG_6_UNIT 1 Lake Hodges Pumped Storage-Unit1 Forced 20.00 20.00 SDGE Gen
LAKHDG_6_UNIT 2 Lake Hodges Pumped Storage-Unit2 Forced 20.00 20.00 SDGE Gen
LAMONT_1_SOLAR4 Hayworth Solar Farm Forced 26.66 12.66 PGAE South
LAMONT_1_SOLAR5 Redcrest Solar Farm Forced 16.66 0.00 PGAE Gen
LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 Forced 267.00 19.00 PGAE Gen
LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 Forced 266.00 19.00 PGAE Gen
LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 Forced 266.00 8.00 PGAE Gen
LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4 Forced 267.00 20.00 PGAE Gen
LAROA2_2_UNITA1 LR2 Forced 322.00 12.00 SDGE Gen
LASSEN_6_UNITS Honey Lake Power Planned/Forced 30.00 30.00 PGAE North
LEBECS_2_UNITS Pastoria Energy Facility Forced 799.47 0.00 SCE Gen
LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE Planned/Forced 309.84 10.84 PGAE South
LEPRFD_1_KANSAS Kansas Forced 20.00 1.40 PGAE Gen
LITLRK_6_GBCSR1 Green Beanworks C Forced 3.00 1.50 SCE Gen
LITLRK_6_SEPV01 Gestamp Solar 1 Forced 2.00 0.00 SCE Gen
LITLRK_6_SOLAR1 Lancaster Little Rock C Forced 5.00 0.00 SCE Gen
LIVOAK_1_UNIT 1 LIVE OAK LIMITED Forced 49.70 7.70 PGAE South
LMBEPK_2_UNITA1 Lambie Energy Center, Unit #1 Forced 47.50 1.50 PGAE Gen
LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE Forced 580.00 11.00 PGAE Gen
LOCKFD_1_BEARCK Bear Creek Solar Forced 1.50 0.00 PGAE Gen
LODI25_2_UNIT 1 LODI GAS TURBINE Forced 25.00 3.00 PGAE Gen
LODIEC_2_PL1X2 Lodi Energy Center Forced 302.58 7.58 PGAE Gen
MAGNLA_6_CERRITOS Magnolia Power Plant Cerritos Forced 12.00 2.00 SCE Gen
MAGNLA_6_COLTON Magnolia Power Project Forced 12.00 2.00 SCE Gen
MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. Forced 32.50 32.50 PGAE Gen
MALIN_5_GCPDDYN Grant County Hydro Facilities Forced 125.00 125.00 PGAE Gen
MCARTH_6_FRIVRB Fall River Mills Project B Forced 1.50 0.00 PGAE Gen
MCCALL_1_QF Fish Water Forced 0.52 0.52 PGAE Gen
MENBIO_6_RENEW1 CalRENEW - 1(A) Forced 5.00 0.00 PGAE Gen
METEC_2_PL1X3 Metcalf Energy Center Forced 593.16 309.16 PGAE Gen
MIRLOM_2_MLBBTA Mira Loma BESS A Planned 10.00 0.00 SCE Gen
MIRLOM_2_MLBBTB Mira Loma BESS B Planned 10.00 0.00 SCE Gen
MIRLOM_6_PEAKER Mira Loma Peaker Forced 46.00 1.40 SCE Gen
MKTRCK_1_UNIT 1 MCKITTRICK LIMITED Forced 47.49 3.99 PGAE South
MNDALY_6_MCGRTH McGrath Beach Peaker Planned/Forced 47.20 47.20 SCE Gen
MOJAVE_1_SIPHON MOJAVE SIPHON POWER PLANT Planned 14.36 0.00 SCE Gen
MOJAVW_2_SOLAR Mojave West Forced 20.00 0.00 SCE Gen
MONLTH_6_BATTRY Tehachapi Storage Project Forced 7.99 7.99 SCE Gen
MONTPH_7_UNITS MONTICELLO HYDRO AGGREGATE Forced 12.50 5.90 PGAE Gen
MOORPK_2_ACOBT1 Acorn I BESS Forced 2.00 2.00 SCE Gen
MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 Forced 510.00 510.00 PGAE South
MRCHNT_2_PL1X3 Desert Star Energy Center Forced 494.58 34.58 SDGE Gen
MRGT_6_TGEBT1 Top Gun Energy Storage Forced 30.00 0.00 SDGE Gen
MSOLAR_2_SOLAR2 Mesquite Solar 2 Forced 100.81 0.00 SDGE Gen
MSTANG_2_SOLAR Mustang Planned/Forced 30.00 2.00 PGAE Gen
MSTANG_2_SOLAR3 Mustang 3 Planned/Forced 40.00 2.00 PGAE Gen
MSTANG_2_SOLAR4 Mustang 4 Planned 30.00 0.00 PGAE Gen
MTWIND_1_UNIT 1 Mountain View Power Project I Planned/Forced 44.40 7.20 SCE Gen
MTWIND_1_UNIT 2 Mountain View Power Project II Planned/Forced 22.20 1.80 SCE Gen
MTWIND_1_UNIT 3 Mountain View Power Project III Forced 22.44 11.22 SCE Gen
NAROW1_2_UNIT NARROWS PH 1 UNIT Planned 12.00 4.00 PGAE North
NAROW2_2_UNIT Narrows Powerhouse Unit 2 Planned 55.00 52.60 PGAE North
NAVYII_2_UNITS COSO POWER DEVELOPER (NAVY II) AGGREGATE Forced 90.00 48.00 SCE Gen
NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 Forced 42.42 42.42 PGAE Gen
NCPA_7_GP2UN4 NCPA GEO PLANT 2 UNIT 4 Forced 52.73 52.73 PGAE Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 4.00 APS Gen
NGILAA_5_SDGDYN NGILAA_5_SDGDYN Forced 57.00 4.00 SDGE Gen
NWCSTL_7_UNIT 1 NEWCASTLE HYDRO Forced 12.00 12.00 PGAE Gen
OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 Forced 55.00 28.00 PGAE South
OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 Planned/Forced 55.00 28.00 PGAE South
OASIS_6_CREST CREST Contracts Forced 13.50 0.00 SCE Gen
OCTILO_5_WIND Ocotillo Wind Energy Facility Forced 265.00 13.00 SDGE Gen
OILFLD_7_QFUNTS Nacimiento Hydroelectric Plant Forced 3.80 1.85 PGAE South
OLDRIV_6_CESDBM Ces Dairy Biogas Forced 1.00 0.00 PGAE Gen
OLDRIV_6_LKVBM1 Lakeview Dairy Biogas Forced 1.00 1.00 PGAE Gen
OLDRV1_6_SOLAR Old River One Forced 20.00 5.50 PGAE Gen
OLINDA_2_COYCRK MWD Coyote Creek Hydroelectric Recovery Forced 3.13 3.13 SCE Gen
OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 Planned 78.00 0.00 SCE Gen
OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 Forced 78.11 0.00 SCE Gen
OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 Planned 81.41 0.00 SCE Gen
OMAR_2_UNIT 4 KERN RIVER COGENERATION CO. UNIT 4 Planned 81.44 0.00 SCE Gen
ORLND_6_HIGHLI High Line Canal Hydro Forced 0.50 0.50 PGAE Gen
OROVIL_6_UNIT Oroville Cogeneration, LP Planned/Forced 7.50 2.50 PGAE Gen
OSO_6_NSPIN OSO_6_NSPIN Planned/Forced 70.00 70.00 SCE Gen
OTAY_6_PL1X2 Chula Vista Energy Center, LLC Forced 35.50 0.00 SDGE Gen
OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER Forced 603.68 25.68 SDGE Gen
OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant Forced 10.62 1.12 PGAE South
PACLUM_6_UNIT Humboldt Redwood Forced 28.80 6.80 PGAE North
PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP Planned/Forced 1.92 1.62 SCE Gen
PALALT_7_COBUG Cooperatively Owned Back Up Generator Forced 4.50 4.50 PGAE Gen
PALOMR_2_PL1X3 Palomar Energy Center Forced 575.00 0.00 SDGE Gen
PARDEB_6_UNITS Pardee Power House Forced 30.00 30.00 PGAE Gen
PEARBL_2_NSPIN PEARBL_2_NSPIN Planned/Forced 118.00 0.00 SCE Gen
PEORIA_1_SOLAR Sonora 1 Forced 1.50 0.00 PGAE Gen
PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE Planned/Forced 198.51 129.51 PGAE Gen
PIOPIC_2_CTG1 Pio Pico Unit 1 Forced 111.30 3.69 SDGE Gen
PIOPIC_2_CTG2 Pio Pico Unit 2 Forced 112.70 2.27 SDGE Gen
PIOPIC_2_CTG3 Pio Pico Unit 3 Forced 112.00 2.48 SDGE Gen
PIT1_7_UNIT 1 PIT PH 1 UNIT 1 Planned/Forced 32.00 32.00 PGAE North
PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE Forced 82.00 41.00 PGAE North
PIT6_7_UNIT 1 PIT PH 6 UNIT 1 Forced 39.00 0.75 PGAE North
PIT6_7_UNIT 2 PIT PH 6 UNIT 2 Forced 40.00 1.75 PGAE North
PIT7_7_UNIT 1 PIT PH 7 UNIT 1 Forced 55.70 2.33 PGAE North
PIT7_7_UNIT 2 PIT PH 7 UNIT 2 Forced 54.60 1.23 PGAE North
PLACVL_1_CHILIB Chili Bar Hydro Planned 8.40 8.40 PGAE Gen
PLAINV_6_SOLAR3 Sierra Solar Greenworks LLC Forced 20.00 1.00 SCE Gen
PLMSSR_6_HISIER High Sierra Cogeneration Aggregate Forced 6.00 6.00 PGAE Gen
PMPJCK_1_SOLAR1 Pumpjack Solar I Planned 20.00 0.00 PGAE Gen
PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) Forced 401.00 0.00 PGAE Gen
PNCHPP_1_PL1X2 Midway Peaking Aggregate Forced 119.91 0.00 PGAE Gen
PNOCHE_1_PL1X2 Panoche Peaker Forced 49.97 0.00 PGAE South
POEPH_7_UNIT 1 POE HYDRO UNIT 1 Forced 69.00 69.00 PGAE North
POEPH_7_UNIT 2 POE HYDRO UNIT 2 Forced 68.50 66.50 PGAE North
POTTER_6_UNITS Potter Valley Forced 10.10 10.10 PGAE North
PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION Forced 2.10 2.10 SCE Gen
RAMON_2_SCEDYN RAMON_2_SCEDYN Forced 106.18 49.18 SCE Gen
RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 Forced 57.00 57.00 PGAE North
RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 Forced 56.90 56.90 PGAE North
RECTOR_2_CREST Rector Aggregate Solar Resources Forced 14.00 0.00 SCE Gen
RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE Forced 6.55 5.95 SCE Gen
RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 Forced 2.25 2.25 SCE Gen
RECTOR_2_QF Kaweah Unit 1 Forced 20.09 20.09 SCE Gen
REDMAN_6_AVSSR1 Antelope Valley Solar Forced 3.00 0.00 SCE Gen
REDOND_7_UNIT 5 REDONDO GEN STA. UNIT 5 Forced 178.87 178.87 SCE Gen
REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 Forced 175.00 95.00 SCE Gen
REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 Forced 480.00 80.00 SCE Gen
RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) Forced 2.50 1.95 PGAE Gen
ROLLIN_6_UNIT ROLLINS HYDRO Forced 13.50 10.29 PGAE North
ROSMDW_2_WIND1 Pacific Wind - Phase 1 Planned 140.00 0.00 SCE Gen
RSMSLR_6_SOLAR2 Rosamond Two Forced 20.00 0.00 SCE Gen
RTEDDY_2_SEBSR3 Rosamond West Solar East Bay 3 Forced 56.00 4.00 SCE Gen
RTEDDY_2_SOLAR2 Rosamond West Solar 2 Forced 54.00 10.00 SCE Gen
RTREE_2_WIND2 Rising Tree 2 Forced 19.80 0.00 SCE Gen
RUSCTY_2_UNITS Russell City Energy Center Forced 615.18 615.18 PGAE South
RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 Forced 49.00 0.00 SCE Gen
RVSIDE_6_SOLAR1 Tequesquite Landfill Solar Project Forced 7.50 1.50 SCE Gen
SANLOB_1_OSFBM1 Old Santa Fe Road Planned 0.85 0.00 PGAE Gen
SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE Planned/Forced 72.00 72.00 PGAE Gen
SANTGO_2_LNDFL1 Bowerman Power Forced 19.60 1.10 SCE Gen
SANWD_1_QF San Gorgonio Farms Wind Farm Planned 31.00 9.90 SCE Gen
SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 Forced 555.00 0.00 SCE Gen
SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 Forced 555.00 0.00 SCE Gen
SBERDO_2_SNTANA SANTA ANA PSP Planned 6.95 6.35 SCE Gen
SBERDO_6_MILLCK MILL CREEK PSP Planned 3.93 2.63 SCE Gen
SCEHOV_2_HOOVER SCEHOV_2_HOOVER Forced 287.01 94.01 SCE Gen
SCHLTE_1_PL1X3 Tracy Combined Cycle Power Plant Forced 336.04 17.66 PGAE Gen
SCHNDR_1_OS2BM2 Open Sky Digester Genset 2 Forced 0.80 0.80 PGAE Gen
SCHNDR_1_WSTSDE Westside Solar Station Forced 15.00 5.00 PGAE Gen
SIERRA_1_UNITS HIGH SIERRA LIMITED Forced 52.43 1.23 PGAE Gen
SLST13_2_SOLAR1 Quinto Solar PV Project Planned 107.60 107.60 PGAE Gen
SLSTR1_2_SOLAR1 Solar Star 1 Forced 310.00 0.00 SCE Gen
SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) Planned/Forced 374.43 131.43 PGAE Gen
SLYCRK_1_UNIT 1 SLY CREEK HYDRO Forced 13.00 2.92 PGAE North
SMUDGO_7_UNIT 1 SONOMA POWER PLANT Forced 64.80 10.80 PGAE Gen
SNCLRA_2_HOWLNG Houwelings Nurseries Oxnard, Inc Forced 13.00 7.69 SCE Gen
SNCLRA_2_UNIT1 New Indy Oxnard Planned 27.80 16.80 SCE Gen
SNCLRA_2_VESBT1 Ventura Energy Storage Forced 100.00 2.80 SCE Gen
SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT Planned/Forced 6.50 6.50 PGAE North
SPOINT_2_MEADDYN SPOINT_2_MEADDYN Planned 325.00 325.00 SCE Gen
SPOINT_2_PARKERDYN Southpoint Energy Center Planned 200.00 200.00 SCE Gen
SPRGAP_1_UNIT 1 SPRING GAP HYDRO Forced 7.00 7.00 PGAE North
SPRGVL_2_CREST Springerville Aggregate Solar Resources Forced 14.00 0.00 SCE Gen
SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) Forced 2.50 2.50 SCE Gen
STANIS_7_UNIT 1 STANISLAUS HYDRO Planned 91.00 91.00 PGAE North
STIGCT_2_LODI LODI STIG UNIT Forced 49.90 0.90 PGAE Gen
STROUD_6_SOLAR Stroud Solar Station Forced 20.00 2.00 PGAE South
SUMWHT_6_SWSSR1 Summer Wheat Solar Farm Forced 18.50 7.50 PGAE Gen
SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II Forced 586.02 30.02 PGAE Gen
SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANT Planned/Forced 248.00 166.00 PGAE South
SUNSPT_2_WNASR1 Windhub Solar A Forced 20.00 0.00 SCE Gen
SUNSTR_5_SS1SCEDYN Sunstream Solar 1 Forced 150.00 0.00 SCE Gen
SWIFT_1_NAS YERBA BUENA BATTERY Forced 4.80 4.80 PGAE South
SYCAMR_2_UNIT 2 Sycamore Cogeneration Unit 2 Forced 78.00 78.00 SCE Gen
TANHIL_6_SOLART Berry Cogen 18 Forced 17.00 0.00 PGAE South
TEHAPI_2_WIND2 Wind Wall Monolith 2 Forced 23.66 2.00 SCE Gen
TERMEX_2_PL1X3 TDM Planned/Forced 625.00 6.00 SDGE Gen
TOPAZ_2_SOLAR Topaz Solar Farms Planned 550.00 0.00 PGAE South
TRNQL8_2_ROJSR1 Tranquillity 8 Rojo Forced 100.00 7.50 PGAE Gen
TRNQL8_2_VERSR1 Tranquillity 8 Verde Forced 60.00 7.00 PGAE Gen
TRNQLT_2_SOLAR Tranquillity Forced 200.00 0.00 PGAE Gen
TRNSWD_1_QF FPL Energy C Wind Forced 38.97 23.97 SCE Gen
TWISSL_6_SOLAR Nickel 1 ("NLH1") Forced 1.50 0.00 PGAE Gen
TX-ELK_6_SOLAR1 Castor Forced 1.50 0.00 PGAE Gen
UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO Forced 3.50 3.50 PGAE Gen
ULTRCK_2_UNIT Rio Bravo Rocklin Forced 24.40 5.40 PGAE North
UNOCAL_1_UNITS TOSCO (RODEO PLANT) Forced 49.85 0.00 PGAE South
USWND2_1_WIND1 Golden Hills A Forced 42.96 10.76 PGAE Gen
USWND2_1_WIND2 Golden Hills B Forced 42.96 0.00 PGAE Gen
USWND2_1_WIND3 Golden Hills C Forced 46.00 11.50 PGAE Gen
USWNDR_2_LABWD1 LaBrisa Wind Project Forced 9.00 1.50 PGAE Gen
USWNDR_2_SMUD SOLANO WIND FARM Forced 102.18 0.00 PGAE Gen
USWNDR_2_SMUD2 Solano Wind Project Phase 3 Forced 127.80 0.00 PGAE Gen
USWPJR_2_UNITS Vasco Wind Forced 78.20 2.30 PGAE Gen
VACADX_1_NAS VACA-DIXON BATTERY Forced 0.70 0.00 PGAE North
VALLEY_5_PERRIS MWD Perris Hydroelectric Recovery Plant Forced 7.94 7.94 SCE Gen
VEDDER_1_SEKERN TEXACO EXPLORATION & PROD (SE KERN RIVER Forced 34.47 12.47 PGAE Gen
VERNON_6_GONZL1 H. Gonzales Unit #1 Forced 5.75 5.75 SCE Gen
VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE Forced 36.80 24.80 SCE Gen
VESTAL_2_SOLAR1 NICOLIS Forced 20.00 20.00 SCE Gen
VESTAL_2_SOLAR2 TROPICO Forced 14.00 14.00 SCE Gen
VICTOR_1_SOLAR2 Alamo Solar Forced 20.00 0.00 SCE Gen
VILLPK_2_VALLYV MWD Valley View Hydroelectric Recovery P Forced 4.10 4.10 SCE Gen
VSTAES_6_VESBT1 Vista Energy Storage Forced 40.00 8.00 SDGE Gen
WALCRK_2_CTG1 Walnut Creek Energy Park Unit 1 Forced 96.43 0.00 SCE Gen
WALCRK_2_CTG2 Walnut Creek Energy Park Unit 2 Forced 96.91 0.00 SCE Gen
WALCRK_2_CTG3 Walnut Creek Energy Park Unit 3 Forced 96.65 0.00 SCE Gen
WALCRK_2_CTG4 Walnut Creek Energy Park Unit 4 Forced 96.49 0.00 SCE Gen
WALCRK_2_CTG5 Walnut Creek Energy Park Unit 5 Forced 96.65 0.00 SCE Gen
WALNUT_2_SOLAR Industry MetroLink PV 1 Forced 1.50 0.00 SCE Gen
WARNE_2_UNIT WARNE HYDRO AGGREGATE Planned 76.00 0.00 SCE Gen
WFRESN_1_SOLAR Joya Del Sol Forced 1.50 0.00 PGAE Gen
WHEATL_6_LNDFIL G2 ENERGY, OSTROM ROAD LLC Forced 3.55 2.05 PGAE Gen
WHITEH_2_MEADDYN1 White Hills A Forced 50.00 2.06 SCE Gen
WHITEH_2_MEADDYN2 White Hills B Forced 300.00 0.00 SCE Gen
WHTWTR_1_WINDA1 Whitewater Hill Wind Project Forced 61.50 26.50 SCE Gen
WISE_1_UNIT 1 Wise Hydro Unit 1 Forced 14.50 11.20 PGAE Gen
WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE Forced 18.40 5.40 PGAE Gen
WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC Forced 38.00 1.00 PGAE Gen
WOLFSK_1_UNITA1 Wolfskill Energy Center Forced 46.90 0.00 PGAE Gen
WSENGY_1_UNIT 1 Wheelabrator Shasta Forced 50.00 16.00 PGAE North
YUBACT_6_UNITA1 Yuba City Energy Center (Calpine) Forced 47.60 2.60 PGAE North
ZOND_6_UNIT ZOND WINDSYSTEMS INC. Forced 17.10 17.10 PGAE Gen
AKINGS_6_AMESR1 American Kings Solar Forced 123.00 8.00
BGSKYN_2_ASSR3A Antelope Solar 3A Forced 15.00 0.00
BGSKYN_2_ASSR3B Antelope Solar 3B Forced 5.00 0.00
BIGSKY_2_ASLBT2 Antelope Solar 2 Luna Forced 100.00 100.00
BLKDIA_2_BDEBT1 Black Diamond Energy Storage Forced 200.00 200.00
CABALO_2_M2BSR1 Mustang 2 Barbaro Solar Planned 50.00 50.00
CABALO_2_M2WSR2 Mustang 2 Whirlaway Solar Planned 100.00 100.00
DYERSM_6_DSWWD1 Dyer Summit Wind Repower Planned 44.80 44.80
HARDWK_6_STWBM1 Still Water Ranch Dairy Forced 1.00 0.20
HIGHDS_2_H5SBT1 High 5 Solar BESS Forced 50.00 50.00
HIGHDS_2_H5SSR1 High 5 Solar Forced 100.00 100.00
LTBEAR_1_LB3SR3 Little Bear 3 Solar Planned/Forced 20.00 0.00
LTBEAR_1_LB4SR5 Little Bear 4 Solar 5 Planned/Forced 50.00 0.00
LTBERA_1_LB1SR1 Little Bear Solar 1 Planned 40.00 0.00
SUNST2_5_SS2SR1 Sun Streams Solar 2 Planned 150.00 0.00
SUTTER_2_CISO Sutter Power Plant Pseudo-CISO Forced 275.00 13.00
USWPFK_6_FRICK Frick Summit Wind Repower Planned 10.00 10.00
VISTRA_5_DALBT1 Dallas Energy Storage Forced 100.00 3.00
VISTRA_5_DALBT2 Dallas Energy Storage 2 Forced 100.00 8.30
VISTRA_5_DALBT3 Dallas Energy Storage 3 Forced 100.00 8.30
VISTRA_5_DALBT4 Dallas Energy Storage 4 Forced 100.00 100.00
VOLTA_7_PONHY1 VOLTA_7_PONHY1 Forced 1.25 1.25


Outage Summary
Zone Name Number Of Outages MW's
Planned Forced Limitation Shutdown
APS Gen 0 3 33.00 0.00
PGAE Gen 23 167 1673.13 1093.56
PGAE North 17 37 840.27 574.40
PGAE South 7 67 464.40 1247.43
SCE Gen 54 157 1711.12 1994.23
SDGE Gen 3 30 219.85 290.00
9 21 40.80 756.05
Total 113 482 4982.57 5955.67


Report Generated on:
06/09/2021 08:30:00 (PPT)
Filtered Parameters:
Date = 06/09/2021
Resource = ALL
Area = ALL
States = ALL
Outage Origin = CAISO

The content of these pages is subject to change without notice. Decisions based on information contained within the California ISO web site are the visitor's sole responsibility.