Market
Notice
March 24, 2016
Requested Client Action Mark Your Calendar |
Categories
ISO News and Information
System Operations
Joint Agency Workshop on Aliso Canyon 4/8/16
Summary
A Joint Agency Workshop is scheduled on April 8, 2016, to discuss the Aliso Canyon Action Plan for Local Energy Reliability in Summer 2016.
Main Text
The California Energy Commission will jointly conduct a workshop with the California Public Utilities Commission (CPUC), the California Independent System Operator (California ISO), and the Los Angeles Department of Water and Power (LADWP) to discuss the near-term gas and electricity reliability risks to the Los Angeles Basin, due to recent events at the Southern California Gas Company's (SoCalGas) Aliso Canyon gas storage facility. The workshop will include an action plan describing the local gas and electric reliability risks for the summer of 2016 and recommended near-term mitigation measures.
The workshop is part of the 2016 Integrated Energy Policy Report (IEPR) Update proceeding. To view the docket and agenda, please visit: http://docketpublic.energy.ca.gov/PublicDocuments/16-IEPR-02/TN210833_20160323T114742_Notice_of_Joint_Agency_Workshop_on_Aliso_Canyon.pdf?platform=hootsuite.
Workshop Details
Date: Friday, April 8, 2016
Time: 1:00 p.m. (Pacific Time)
Location: Warner Center Marriott Woodland Hills, Grand Ballroom, 21850 Oxnard Street, Woodland Hills, CA
For More Information Contact
Raquel Kravitz, California Energy Commission, IEPR project manager, (916) 651-8836, raquel.kravitz@energy.ca.gov
For the benefit of our customers, we:
Attract, develop and retain a highly skilled workforce • Operate the grid
reliably and efficiently • Provide fair and open transmission access
Promote environmental stewardship • Facilitate effective markets and promote
infrastructure development • Provide timely and accurate information
P&CS/ComPR/WS/ds