The California ISO has revised the operating procedure referenced below.
3100 Establishing System Operating Limits for the Operations Horizon, version 7.0 effective March 26, 2020.
Periodic Review:
Section 3.1: Updated Mega volt ampere reactive (Mvar) reference.
Section 3.3.6, Powerflow Cascading Test, #’s 1-3: Minor edits for clarity.
Section 3.6.3: Removed random “2” from 1st bullet.