ISO Logo
 
Notice
August 4, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations 
Notification of Revised ISO Operating Procedure 3210A

MESSAGE

The California ISO has revised the operating procedure referenced below.

 

3210A Transmission Outage Request, version 6.0, effective Aug 4, 2020.

Periodic Review:

Added Supporting Section and minor formatting changes. Added document controlled footer for consistency.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States