ISO Logo
 
Notice
November 21, 2019

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

System Operations

Notification of Revised ISO Operating Procedures 2210Z and 3210


MESSAGE

The California ISO has revised the operating procedures referenced below.

 

2210Z Effectiveness Factors - All, version 27.4, effective Nov. 21, 2019

  • 6310: Relabeled Table 3 (Parts 1 & 2) and added Control Point numbers; Table 3, Part 1: Added CP#11, Dos Amigos Pumping Plant - Panoche 230; added CP #12, LBN path flow (S->N); added CP #13 & 14, Path 15 flow (S->N). Table 3, Part 2: Added CP#11, Dos Amigos Pumping Plant - Panoche 230; added CP #12, LBN path flow (S->N); added CP #13 & 14, Path 15 flow (S->N). Updated to version 22.3, effective 11/01/19.
  • Updated version and dates only for the following:
    • 6110: version 9.0, effective 11/01/19
    • 6140: version 6.4, effective 11/01/19
    • 6610: version 12.9, effective 10/02/19
    • 7820: version 15.16, effective 11/01/19

 

3210 Transmission Outages, version 16.9, effective Nov. 21, 2019

Section 3.1.1: Added new paragraph to address planned outages submitted as forced outages.

Section 5: Corrected section title.

Minor format and grammar updates.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx

 


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com.

 

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States