ISO Logo
 
Market Notice
April 15, 2019

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

System Operations

Notification of Revised ISO Operating Procedures 2340, 2360, 2520, 2540, 2550 and 3530I

MESSAGE

The California ISO has revised the operating procedures referenced below.

 

2340 Ancillary Service Availability Validation, version 2.3, effective April 15, 2019.

  • Section 1: Changed Interchange Scheduler (IS) to Transmission Dispatcher (TD).
  • Section 3.2.1: In tables 1 & 3 changed IS to TD.
  • Minor formatting and grammar updates.

2360 Real-Time Generator Forbidden Operating Regions, version 6.2, effective April 15, 2019.

  • Section 1: Changed IS to TD.
  • Section 3.1: Changed IS to TD.
  • Minor format and grammar updates.

 2520 Real-Time and After-the-Fact Check Out, version 8.6, effective April 15, 2019.

  • Section 2.2: Changed IS to TD.
  • Section 3.2.1: Changed IS to TD and Interchange Scheduler Desk to Transmission Desk.
  • Sections 3.2.2, 3.3 and 3.4: Changed Interchange Scheduler Desk to Transmission Desk.
  • Replaced Peak RC (Reliability Coordinator) with the RC.
  • Minor format and grammar updates.

2540 Interchange Schedule Curtailments, version 6.5, effective April 15, 2019.

  • Section 1: Changed Interchange Scheduler Desk to Transmission Desk.
  • Section 2.1: Changed IS to TD.
  • Section 3.1.1: Combined Interchange Scheduler Desk table with Transmission Desk. table and left under Transmission Desk heading. Former Transmission Desk task is now step 6 in new table. Also changed all instances of IS to TD.
  • Section 3.1.2: Combined Interchange Scheduler Desk table with Transmission Desk table and left under Transmission Desk heading. With change Checking Real-Time Contingency Analysis (RTCA) is now step one, and the previous Scheduling Desk tasks are now steps 2-6. Also changed all instances of IS to TD.
  • Section 3.3.1: Changed Interchange Scheduling Desk to Transmission Desk and IS to TD.
  • Minor format and grammar updates.

2550 Inadvertent Interchange ATEC Payback, version 5.7, effective April 15, 2019

  • Section 1: Changed Interchange Scheduling Desk to Transmission Desk.
  • Section 3.1: Changed Interchange Scheduling Desk to Transmission Desk and IS to TD. Removed instance of "Transmission Dispatcher" from step 4 and "Transmission Operator" from step 3 of Transmission desk table due to task now being part of the Transmission Desk.
  • Section 3.2: Changed Interchange Scheduling Desk to Transmission Desk and removed "Transmission Operator" from the 1st note after step 3 of the Transmission Desk table due to task now being part of the Transmission Desk.
  • Replaced Reliability Messaging Tool (RMT) with Reliability Messaging System.

3530I Stranded Load Scheduling - Public Attachment, version 2.1, effective April 16, 2019.

  • Added new row, INYO.
  • Updated Department of Energy (DOE) - Tracy Load Existing Transmission Contract Calculator (ETCC) Change to 105 MW.

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States