The California ISO has revised the operating procedures referenced below.
3530 Scheduling for Stranded Loads, version 8.3, effective April 22, 2019.
- Merged all Interchange Scheduler tasks into the Transmission Desk tasks.
- Removed all mentions of “Interchange Scheduler” and replaced with “Transmission Dispatcher.”
- Minor format and grammar updates.
3620 Transmission Reliability Margins, version 2.2, effective April 22, 2019.
- Formatting and grammar corrections. Removed mentions of “Interchange Scheduler” because Interchange Scheduling will be absorbed by the Transmission Desk.
- Replaced Shift Supervisor with Shift Manager.
- Replaced Peak RC (Reliability Coordinator) with the RC.
- Replaced Reliability Messaging Tool (RMT) with Reliability Messaging System.
- Minor format and grammar updates.
4510A Load Shed Calculation Guideline - Public Attachment, version 11.0, effective April 22, 2019.
- Annual Review: Updated percentages to reflect correct Peak Load for 2018.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx