ISO Logo
 
Notice
June 15, 2021

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations
Notification of Revised ISO Operating Procedures 4420, 4420C and 4420E

MESSAGE

The California ISO has revised the operating procedures referenced below.

 

4420 System Emergency, version 13.0, effective June 15, 2021

Annual Review:

  • Changed all references of Reliability Must Run (RMR) to Legacy RMR to align with Operating Procedure 2310.
  • Replaced Staged Emergency with Energy Emergency.
  • Replaced System Operations with Grid Operations.
  • Updated Warning section.
  • Added Metered Subsystem (MSS) to Responsibilities section.
  • Changed “call” and “conference call” to “conduct a blast call” throughout.
  • Added new Operating Procedure 4420H Customer Agreements to Appendix section.
  • Added Section 3.2 CAISO Communications Regarding Forecasted System Conditions.
  • Updated Tariff references.
  • Replaced ISO with CAISO and minor format and grammar updates for consistency.

4420C System Emergency Notice Templates, version 9.0, effective June 15, 2021

Annual Review:

  • Updating messaging; changed order of alerts to be consistent with 4420, 4420B, Flex Alert, Restricted Maintenance Operation (RMO), Transmission Emergency, Alert, Warning, etc. Updated instances of ISO to CAISO. Updated energy emergency language for warning, stages 1, 2, and 3.
  • Added Table of Contents.

4420E Allowable Transmission Maintenance Activities During Restricted Maintenance Operations, version 12.0, effective June 15, 2021

Annual Review: Updated from ISO to CAISO.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com
Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States