ISO Logo
 
Notice
May 6, 2021

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations
Notification of Revised ISO Operating Procedures 4510 and 4510A

MESSAGE

The California ISO has revised the operating procedures referenced below.

 

4510 Load Management Programs and Underfrequency Load Shedding, version 6.0, effective May 6, 2021

Annual Review: Updated Frequency to “Annual” to align with 4510A & 4510C.

Provided acronym detail in References section. Replaced instances of ISO with CAISO. Removed history prior to five-years. Minor format and grammar updates.

 

4510A Load Shed Calculation Guideline - Public Attachment, version 13.1, effective May 6, 2021

Updated percentages based on the different peak load date (Aug. 18, 2021 instead of Sept. 6, 2021).

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com
Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States