RC West has revised the operating procedure referenced below.
RC0310 Mitigating System Operating Limits (SOL) and Interconnection Reliability Operating Limits (IROL) Exceedances, version 1.5, effective May 12, 2020.
Section 3.9: Removed references of RCIS.
Replaced Peak RC with SPP West RC or impacted RC.
Updated NERC IRO-002 reference.
Clarified RC Operator notification requirements after an exceedance is mitigated in Sections 3.3 to 3.8.
RC0650 Steady-State and Dynamic System Model Validation: NERC MOD-033-1, version 2.0, effective May 12, 2020.
Annual review:
Section 4: Updated 1st responsibility bullet for RC.
Corrected MOD-033 references in Sections 3 and 4.
Section 6: Updated review frequency to three years.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx