ISO Logo
 
Notice
May 12, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations
Notification of Revised RC West Operating Procedures RC0310 and RC0650

MESSAGE

RC West has revised the operating procedure referenced below.

 

RC0310 Mitigating System Operating Limits (SOL) and Interconnection Reliability Operating Limits (IROL) Exceedances, version 1.5, effective May 12, 2020.

Section 3.9: Removed references of RCIS.

Replaced Peak RC with SPP West RC or impacted RC.

Updated NERC IRO-002 reference.

Clarified RC Operator notification requirements after an exceedance is mitigated in Sections 3.3 to 3.8.

 

 

RC0650 Steady-State and Dynamic System Model Validation: NERC MOD-033-1, version 2.0, effective May 12, 2020.

Annual review:

Section 4: Updated 1st responsibility bullet for RC.

Corrected MOD-033 references in Sections 3 and 4.

Section 6: Updated review frequency to three years.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx

 


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States