ISO Logo
 
Notice
July 1, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations 
Notification of Revised RC West Operating Procedures RC0320, RC0330 and RC0600

MESSAGE

RC West has revised the operating procedure referenced below.

 

RC0320 Outage Review and Coordination, version 3.0, effective July 1, 2020

Rewrite of Section 3.3 - Changed Pacific Southwest call from a daily call to an ad-hoc call, which is initiated only when a significant issue is identified for discussion. Both regional conference calls now held on an ad-hoc basis.

 

RC0330 Coordinating with Neighboring RCs, version 2.1, effective July 1, 2020.

Added a footnote and a new bullet item to Section 3.4.2.

 

RC0600 RC West Implementation of Common Interconnection-wide Methodology, version 1.1, effective July 1, 2020.

Section 3.2: Added a note regarding RC0330B.

References added for RC0330B.

Added content to Section 3.4.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

 ISO Procedure Control Desk at ProcedureControl@caiso.com 

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States