ISO Logo
 
Notice
April 15, 2021

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations
Notification of Revised RC West Operating Procedures RC0410 and RC0410A

MESSAGE

RC West has revised the operating procedures referenced below.

 

RC0410 System Emergencies, version 3.1, effective April 15, 2021

Added Section 3.1.1 for Energy Emergency Alert (EEA) Watch. Added EEA Watch templates to Section 3.1.6. Clarified criteria and steps for RC declaring a “Bulk Electric System (BES) Emergency” in Section 3.2. Minor format and grammar updates. Reviewed and approved by the Real-Time Working Group.

 

RC0410AEOP-011 Plan Review Checklist, version 3.0, effective April 15, 2021

Annual Review: Updated email address under Plan Review Submissions and updated review frequency to Annual. 

 

California ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States