RC West has revised the operating procedure referenced below.
RC0460 Reliability Coordinator Area Restoration Plan, version 2.0, effective May 15, 2020.
Annual Review:
Replaced CAISO RC with RC West and Updated to RC West logo.
Section 3.3 - Added bullet for Transmission Operator (TOP) to notify the RC when transferring operations and authority back to its Balancing Authority (BA); added Contact RC Operator to report Area status, obtain interconnection wide system.
New Section 3.4 - Moved RC criteria for transfer of operations and authority back to the balancing authority from TOP responsibilities to a new section.
Section 3.6 - added Note
Throughout document removed CAISO RC references and replaced with RC West. Minor format and grammar updates.
RC0460F EOP-005 Plan Review Checklist, version 2.0, effective May 15, 2020.
Annual Review:
Updated to RC West Logo and replaced CAISO RC with RC West.
Minor format and grammar updates.
Added change description section.
Consolidated RC Reviewer comments to one section.
Minor formatting and grammar.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx