The California ISO has revised the operating procedures referenced below.
1210 Day-Ahead Market, version 18.8, effective June 1, 2022.
Added details to the Residual Unit Commitment (RUC) Net Short process.
2210 Real-Time Market Activities, version 11.1, effective June 1, 2022.
Added note that all Real-Time Dispatch (RTD)/ Real-Time Pre-Dispatch (RTPD)/ Short Term Unit Commitment (STUC) load forecast adjustments are automatically published to the CAISO Open Access Same-time Information System (OASIS).
Replaced ISO with CAISO and updated North American Electric Reliability Corporation (NERC) reference.
Minor formatting and punctuation edits.
3530I Stranded Load Scheduling - Public Attachment, version 3.2, effective May 27, 2022.
Updated to include new stranded load IDs for WAPA:
- WDOE_LLL115_E_WHL_COB-T3
- WDOE_CTW230_I_WHL_MHBRLL
- WDOE_CTW230_I_WHL_MLBRLL
- WDOE_TESLA230_I_WHL_MHBRLL
- WDOE_TESLA230_I_WHL_MLBRLL
- WDOE_TRCYPGAE_I_WHL_MHBRLL
- WDOE_TRCYPGAE_I_WHL_MLBRLL
The California ISO’s operating procedures are available on the Operating Procedures webpage.