The California ISO has posted the proposed Participating Transmission Owner (PTO) Per Unit Cost Guides to the ISO website at http://www.caiso.com/informed/Pages/StakeholderProcesses/ParticipatingTransmissionOwnerPerUnitCosts.aspx. A call has been scheduled on March 8, 2019 to review the proposed guides with stakeholders.
The ISO Generator Interconnection Procedures require PTOs to annually update and publish their per unit costs for use during the current interconnection study cycle for estimating the cost of facilities required to interconnect generation to the ISO grid.
Please submit comments on the proposed guides to initiativecomments@caiso.com by March 22.
The meeting will be recorded and the video file posted on the webpage referenced above for a limited time. The recording is for informational and convenience purposes only, and any related transcriptions should not be reprinted without prior consent from the ISO.
Meeting Details
Date: Friday, March 8, 2019
Time: 10 a.m. - 12 p.m. PST
Add to calendar
Participation Information
Step 1: call 1-877-369-5230, access code: 0460454##
Step 2: join web conference
Technical support: call the AT&T Help Desk at 1-888-796-6118